1 PECO Post-2010 Procurement Plan Day-ahead hourly priced service; 1-year fixed price optional service from 1/1/11 to 12/31/11 85% full requirements with 1-year term; 15% full requirements spot 90% full requirements with 1-year terms (70%) and 2-year (20%) terms; 10% full requirements spot 75% full requirements with 1-year terms (30%) and 2-year terms (45%); 20% energy block and 5% spot Products Large Commercial & Industrial (peak demand >500 kW) Medium Commercial (peak demand between 100 and 500 kW) Small Commercial (peak demand <100 kW) Residential Procurement Class Note: Parties agreed to a load cap limitation such that a single supplier shall provide no more than 65% of the load of a procurement class. Exhibit 99.2 |
2 Product Details 80 3 Months Winter On-Peak (5 X 16) (Dec, Jan, Feb) 130 3 Months Summer On-Peak (5 X 16) (June, July, Aug) 160 100 50 12 months 24 months 60 months Baseload (24 X 7) MW Duration Residential Forward Energy Block Products 49.21 4.47% 19 935.00 1,100.00 Medium Commercial TBD 1,249.20 2,372.25 Fixed-Price PLC (MW) TBD 1,388.00 3,163.00 Total PLC (MW) TBD 25 47 Fixed-Price Tranches TBD TBD Large Commercial & Industrial 49.97 3.60% Small Commercial 50.47 1.60% Residential Fixed Price MW-Measure Fixed-Price Tranche Size Procurement Class 55.00 5.00% 3 165.0 1,100.00 Medium Commercial TBD 138.8 Spot-Price PLC (MW) TBD 1,388.00 Total PLC (MW) TBD 3 Spot-Price Tranches TBD TBD Large Commercial & Industrial 46.27 3.33% Small Commercial Spot Price MW-Measure Spot-Price Tranche Size Procurement Class Note 1. PLC refers to the Peak Load Contribution effective 6/1/2008 for the PECO system in accordance with PJM 1 |