REGULATORY ENVIRONMENT | REGULATORY ENVIRONMENT Coronavirus Disease – 2019 The global outbreak of COVID-19 was declared a pandemic by the WHO and the CDC. COVID-19 has spread globally, including throughout the United States and, in turn, our service territories. Each of the states in which our regulated utilities operate declared a public health emergency and issued shelter-in-place orders in response to the COVID-19 pandemic. All of the shelter-in-place orders have since expired or been lifted. The PSCW, the ICC, the MPUC, and the MPSC have all issued written orders requiring certain actions to ensure that essential utility services were, and continue to be, available to customers in their respective jurisdictions. A summary of these orders is included below. Wisconsin On March 24, 2020, the PSCW issued two orders in response to the COVID-19 pandemic. The first order required all public utilities in the state of Wisconsin, including WE, WPS, and WG, to temporarily suspend disconnections, the assessment of late fees, and deposit requirements for all customer classes. In addition, it required utilities to reconnect customers that were previously disconnected, offer deferred payment arrangements to all customers, and streamline the application process for customers applying for utility service. In the second order issued on March 24, 2020, the PSCW authorized Wisconsin utilities to defer expenditures and certain foregone revenues resulting from compliance with the first order, and expenditures as otherwise incurred to ensure safe, reliable, and affordable access to utility services during the declared public health emergency. The PSCW has affirmed that this authorization for deferral includes the incremental increase in uncollectible expense above what is currently being recovered in rates. As WE, WPS, and WG already have a cost recovery mechanism in place to recover uncollectible expense for residential customers, this new deferral only impacts the recovery of uncollectible expense for their commercial and industrial customers. See Note 5, Credit Losses, for information regarding changes to our allowance for credit losses related to COVID-19. As of December 31, 2020, the total amount deferred at our Wisconsin utilities related to the COVID-19 pandemic was not significant. The PSCW will review the recoverability and examine the prudency of any deferred amounts in future rate proceedings. On June 26, 2020, the PSCW issued a written order providing a timeline for the lifting of the temporary provisions required in the first March 24, 2020 order. Utilities were allowed to disconnect commercial and industrial customers and require deposits for new service as of July 25, 2020 and July 31, 2020, respectively. After August 15, 2020, utilities were no longer required to offer deferred payment arrangements to all customers. Additionally, utilities were authorized to reinstate late fees except for the period between the first order and this supplemental order. Our Wisconsin utilities resumed charging late payment fees in late August 2020. Late payment fees were not charged on outstanding balances that were billed between the first order and late August 2020. The PSCW extended the moratorium on disconnections of residential customers until November 1, 2020. In accordance with Wisconsin regulations, utilities are generally not allowed to disconnect residential customers for non-payment during the winter moratorium, which began on November 1 and ends on April 15. Utilities are allowed to continue assessing late fees during the winter moratorium. Illinois On March 18, 2020, the ICC issued an order to all Illinois utilities, including PGL and NSG, requiring, among other things, a moratorium on disconnections of utility service and a suspension of late fees and penalties during the declared public health emergency. These provisions applied to all utility customer classes. Illinois utilities were also required to temporarily enact more flexible credit and collections procedures. On June 18, 2020, the ICC issued a written order approving a settlement agreement negotiated by Illinois utilities, ICC staff, and certain intervenors. The key terms of the settlement agreement included the following: • The moratorium on disconnections and the suspension of late fees and penalties were extended until July 26, 2020. • Customers disconnected after June 18, 2019 could be reconnected without being assessed a reconnection fee if reconnection was requested prior to August 25, 2020. • Flexible deferred payment arrangements were required to be offered to residential and commercial and industrial customers for an extended period of time and with reduced down payment requirements. • Deposit requirements were waived until August 25, 2020 for all residential customers, and were waived for an additional four months for residential customers that verbally expressed financial hardship. • PGL and NSG were required to establish a bill payment assistance program with approximately $12.0 million and $1.2 million, respectively, available for eligible residential customers to provide relief from high arrearages. In addition to the above, the settlement agreement authorized PGL and NSG to implement a SPC rider for the recovery of incremental direct costs resulting from COVID-19, foregone late fees and reconnection charges, and the costs associated with their bill payment assistance programs. PGL and NSG began recovering costs under the SPC rider on October 1, 2020. Amounts deferred under the SPC rider are being recovered over 36 months and will be subject to review and reconciliation by the ICC. As of December 31, 2020, PGL's and NSG's regulatory assets related to the COVID-19 pandemic were $19.4 million, collectively. Subsequent to the approval of the settlement agreement, and at the request of the ICC, PGL and NSG agreed to extend the moratorium on disconnections for qualified low-income residential customers and residential customers expressing financial hardship through March 31, 2021. The annual winter moratorium in Illinois that generally prohibits PGL and NSG from disconnecting residential customers for non-payment began on December 1 and ends on March 31. Additionally, PGL and NSG voluntarily extended the availability of deferred payment arrangements with reduced down payment requirements to residential and commercial and industrial customers until March 31, 2021. Minnesota On May 22, 2020, the MPUC issued a written order authorizing Minnesota utilities, including MERC, to track and defer COVID-19 related expenses and certain foregone revenues. The MPUC will review the recoverability and examine the prudency of any deferred amounts in future rate proceedings. As of December 31, 2020, amounts deferred at MERC related to the COVID-19 pandemic were not significant. On June 18, 2020, the MPUC verbally ordered Minnesota utilities to temporarily suspend disconnections and waive reconnection fees, service deposits, late fees, interest, and penalties for all residential customers. In addition, utilities were required to immediately reconnect residential customers that were previously disconnected. On August 13, 2020, the MPUC issued a written order affirming these temporary provisions. The order will remain in effect until 60 days after Minnesota's declared peacetime emergency expires. Currently, the peacetime order is set to expire on March 15, 2021, meaning the MPUC's order would expire on May 14, 2021. The expiration date of Minnesota's peacetime emergency, and the corresponding expiration date of the MPUC order, are subject to change. The annual winter moratorium in Minnesota that generally prohibits MERC from disconnecting residential customers for non-payment began on October 15, 2020 and does not end until April 15, 2021. Prior to the verbal order issued by the MPUC, MERC had voluntarily taken actions to ensure its customers continued to receive utility services during the pandemic. These actions included, but were not limited to, temporarily suspending disconnections and waiving late payment fees for residential and small commercial and industrial customers that entered into payment plans. Michigan On April 15, 2020, the MPSC issued a written order requiring Michigan utilities, including MGU and UMERC, to put certain minimum protections in place during the COVID-19 pandemic. The minimum protections required by the order include the suspension of disconnections, late payment fees, deposits, and reconnection fees for certain vulnerable customers. In addition, utilities are required to extend access to and enhance the flexibility of payment plans to customers financially impacted by COVID-19. The order will remain in effect until further notice from the MPSC. As required in the MPSC order, MGU and UMERC filed responses with the MPSC on April 20, 2020 affirming the actions they are taking to protect customers. The actions being taken by MGU and UMERC provide protections to more customers than required by the MPSC order. These actions include suspending disconnections for all residential customers, waiving deposit requirements for new service, suspending the assessment of late fees for customers that have entered into payment plans, and enhancing payment plan options for all customers. The April 15, 2020 MPSC order also authorized all Michigan utilities to defer, for potential future recovery, uncollectible expense incurred on or after March 24, 2020 that exceeds the amounts being recovered in rates. On July 23, 2020, the MPSC issued an order denying Michigan utilities' ability to defer additional COVID-19 related expenses and certain foregone revenues. The MPSC indicated that utilities can still seek recovery of these costs and foregone revenues by filing additional information on the specifics of their request. MGU and UMERC filed comments with the MPSC on November 2, 2020 indicating that they have not experienced any material additional COVID-19 related expenses or foregone revenues, but that they will continue to monitor them and will notify the MPSC if they become material. At December 31, 2020, our Michigan utilities had not recorded any deferrals related to the COVID-19 pandemic. Tax Cuts and Jobs Act of 2017 Due to the Tax Legislation, our regulated utilities deferred for return to ratepayers, through future refunds, bill credits, riders, or reductions in other regulatory assets, the estimated tax benefit of $2,529 million that resulted from the revaluation of deferred taxes. The Tax Legislation also reduced the corporate federal tax rate from a maximum of 35% to a 21% rate, effective January 1, 2018. We received written orders from the PSCW and the MPSC addressing the refunding of certain of these tax benefits to ratepayers in Wisconsin and Michigan, respectively. The ICC approved the VITA in Illinois, and the MPUC addressed the impacts to MERC in its 2018 rate order. See the Variable Income Tax Adjustment Rider discussion and the 2018 Minnesota Rate Order discussion below for more information. Summaries of the Wisconsin and Michigan orders are provided below. Wisconsin In May 2018, the PSCW issued an order regarding the benefits associated with the Tax Legislation. The PSCW order required WE's and WPS’s electric utility operations to use 80% and 40%, respectively, of the current 2018 and 2019 tax benefits to reduce certain regulatory assets. The remaining 20% and 60% at WE and WPS, respectively, was returned to electric customers in the form of bill credits. For our Wisconsin natural gas utility operations, the PSCW indicated that 100% of the current 2018 and 2019 tax benefits should be returned to natural gas customers in the form of bill credits. Regarding the net tax benefit associated with the revaluation of deferred taxes, amortization required in accordance with normalization accounting was used to reduce certain regulatory assets for our electric utilities and was deferred at our natural gas utilities. The timing and method of returning the remaining net tax benefit associated with the revaluation of deferred taxes was addressed in the rate orders issued by the PSCW in December 2019. See the 2020 and 2021 Rates discussion below for more information. Michigan In February 2018, the MPSC issued an order requiring Michigan utilities to make three filings related to the Tax Legislation. The first of those filings, which was filed in March 2018, prospectively addressed the impact on base rates for the change in tax expense resulting from the federal tax rate reduction from 35% to 21%. MGU and UMERC proposed providing a volumetric bill credit, subject to reconciliation and true up. In May 2018, the MPSC issued orders approving settlements that resulted in volumetric bill credits for all of MGU's and UMERC's customers effective July 1, 2018. The bill credits will remain in effect until each company's next rate proceeding. The second filing, which was filed in July 2018, addressed the impact on base rates for the change in tax expense resulting from the federal tax rate reduction from 35% to 21% from January 1, 2018 until July 1, 2018. MGU and UMERC proposed to return the tax savings from these months to customers via volumetric bill credits over multiple months. The MPSC issued orders approving settlements in September 2018. In accordance with the settlement orders, the savings were returned to MGU's and UMERC's customers via volumetric bill credits that were in effect from October 1, 2018 through December 31, 2018. The third filing was filed in October 2018 and addressed the remaining impacts of the Tax Legislation on base rates – most notably the re-measurement of deferred tax balances. MGU and UMERC proposed providing a volumetric bill credit, subject to reconciliation and true up, to return these remaining impacts of the Tax Legislation to customers. The MPSC issued orders approving settlements in May 2019. The settlement orders provide for volumetric bill credits to MGU's and UMERC's customers effective June 1, 2019. For MGU's customers and UMERC's electric customers, the bill credits will remain in effect until each company's next rate proceeding. Effective July 1, 2020, the bill credits were temporarily suspended for UMERC's natural gas customers. WE, which served one retail electric customer in Michigan, reached a settlement with that customer. That settlement was approved by the MPSC in May 2018 and addressed all base rate impacts of the Tax Legislation, which were returned to the customer through bill credits. Wisconsin Electric Power Company, Wisconsin Public Service Corporation, and Wisconsin Gas LLC 2020 and 2021 Rates In March 2019, WE, WPS, and WG filed applications with the PSCW to increase their retail electric, natural gas, and steam rates, as applicable, effective January 1, 2020. In August 2019, all three utilities filed applications with the PSCW for approval of settlement agreements entered into with certain intervenors to resolve several outstanding issues in each utility's respective rate case. In December 2019, the PSCW issued written orders that approved the settlement agreements without material modification and addressed the remaining outstanding issues that were not included in the settlement agreements. The new rates became effective January 1, 2020. The final orders reflect the following: WE WPS WG 2020 Effective rate increase (decrease) Electric (1) (2) $ 15.3 million / 0.5% $ 15.8 million / 1.6% N/A Gas (3) $ 10.4 million / 2.8% $ 4.3 million / 1.4% $ (1.5) million / (0.2)% Steam $ 1.9 million / 8.6% N/A N/A ROE 10.0% 10.0% 10.2% Common equity component average on a financial basis 52.5% 52.5% 52.5% (1) Amounts are net of certain deferred tax benefits from the Tax Legislation that were utilized to reduce near-term rate impact. The WE and WPS rate orders reflect the majority of the unprotected deferred tax benefits from the Tax Legislation being amortized over two years. For WE, approximately $65 million of tax benefits will be amortized in each of 2020 and 2021. For WPS, approximately $11 million of tax benefits were amortized in 2020 and approximately $39 million will be amortized in 2021. The unprotected deferred tax benefits related to the unrecovered balances of WE's recently retired plants and its SSR regulatory asset were used to reduce the related regulatory asset. Unprotected deferred tax benefits by their nature are eligible to be returned to customers in a manner and timeline determined to be appropriate by our regulators. (2) The WPS rate order is net of $21 million of refunds related to its 2018 earnings sharing mechanism. These refunds are being made to customers evenly over two years, with half returned in 2020 and the remainder being returned in 2021. (3) The WE amount includes certain deferred tax expense from the Tax Legislation, and the WPS and WG amounts are net of certain deferred tax benefits from the Tax Legislation that were utilized to reduce near-term rate impact. The rate orders for all three gas utilities reflect all of the unprotected deferred tax expense and benefits from the Tax Legislation being amortized evenly over four years. For WE, approximately $5 million of previously deferred tax expense will be amortized each year. For WPS and WG, approximately $5 million and $3 million, respectively, of previously deferred tax benefits will be amortized each year. Unprotected deferred tax expense and benefits by their nature are eligible to be recovered from or returned to customers in a manner and timeline determined to be appropriate by our regulators. In accordance with its rate order, WE filed an application with the PSCW on July 20, 2020 requesting a financing order to securitize $100 million of Pleasant Prairie power plant's book value, plus the carrying costs accrued on the $100 million during the securitization process and related fees. On November 17, 2020, the PSCW issued a written order approving the application. The securitization is expected to reduce the carrying costs for the $100 million, benefiting customers. The WPS rate order allows WPS to collect the previously deferred revenue requirement for ReACT™ costs above the authorized $275.0 million level. The total cost of the ReACT™ project was $342 million. This regulatory asset will be collected from customers over eight years. All three Wisconsin utilities will continue having an earnings sharing mechanism through 2021. The earnings sharing mechanism was modified from its previous structure to one that is consistent with other Wisconsin investor-owned utilities. Under the new earnings sharing mechanism, if the utility earns above its authorized ROE: (i) the utility retains 100.0% of earnings for the first 25 basis points above the authorized ROE; (ii) 50.0% of the next 50 basis points is refunded to customers; and (iii) 100.0% of any remaining excess earnings is refunded to customers. In addition, the rate orders also require WE, WPS, and WG to maintain residential and small commercial electric and natural gas customer fixed charges at previously authorized rates and to maintain the status quo for WE's and WPS's electric market-based rate programs for large industrial customers through 2021. 2018 and 2019 Rates During April 2017, WE, WPS, and WG filed an application with the PSCW for approval of a settlement agreement they made with several of their commercial and industrial customers regarding 2018 and 2019 base rates. In September 2017, the PSCW issued an order that approved the settlement agreement, which froze base rates through 2019 for electric, natural gas, and steam customers of WE, WPS, and WG. Based on the PSCW order, the authorized ROE for WE, WPS, and WG remained at 10.2%, 10.0%, and 10.3%, respectively, and the capital cost structure for all of our Wisconsin utilities remained unchanged through 2019. In addition to freezing base rates, the settlement agreement extended and expanded the electric real-time market pricing program options for large commercial and industrial customers and mitigated the continued growth of certain escrowed costs at WE during the base rate freeze period by accelerating the recognition of certain tax benefits. WE was flowing through the tax benefit of its repair-related deferred tax liabilities in 2018 and 2019, to maintain certain regulatory asset balances at their December 31, 2017 levels. While WE would typically follow the normalization accounting method and utilize the tax benefits of the deferred tax liabilities in rate-making as an offset to rate base, benefiting customers over time, the federal tax code does allow for passing these tax repair-related benefits to ratepayers much sooner using the flow through accounting method. The flow through treatment of the repair-related deferred tax liabilities offset the negative income statement impact of holding the regulatory assets level, resulting in no change to net income. The agreement also allowed WPS to extend through 2019, the deferral for the revenue requirement of ReACT™ costs above the authorized $275.0 million level, and other deferrals related to WPS's electric real-time market pricing program and network transmission expenses. Pursuant to the settlement agreement, WPS also agreed to adopt, beginning in 2018, the earnings sharing mechanism that had been in place for WE and WG since January 2016, and all three utilities agreed to keep the mechanism in place through 2019. Under this earnings sharing mechanism, if WE, WPS, or WG earned above its authorized ROE, 50% of the first 50 basis points of additional utility earnings were required to be refunded to customers. All utility earnings above the first 50 basis points were also required to be refunded to customers. Liquefied Natural Gas Facilities In November 2019, WE and WG filed a joint application with the PSCW requesting approval for each company to construct its own LNG facility. If approved, each facility would provide one Bcf of natural gas supply to meet peak demand without requiring the construction of additional interstate pipeline capacity. These facilities are expected to reduce the likelihood of constraints on WE's and WG's natural gas systems during the highest demand days of winter. The total cost of both projects is estimated to be approximately $370 million, with approximately half being invested by each utility. A decision from the PSCW is expected in 2021, and commercial operation of the LNG facilities is targeted for the end of 2023. Solar Generation Projects In August 2019, WE, along with an unaffiliated utility, filed an application with the PSCW for approval to acquire an ownership interest in a proposed solar project, Badger Hollow II, that will be located in Iowa County, Wisconsin. Once constructed, WE will own 100 MW of this project. WE's share of the cost of this project is estimated to be $130 million. The PSCW issued a written order approving the acquisition of this project in March 2020. Commercial operation of Badger Hollow II is targeted for December 2022. In May 2018, WPS, along with an unaffiliated utility, filed an application with the PSCW for approval to acquire ownership interests in two solar projects in Wisconsin. Badger Hollow I is located in Iowa County, Wisconsin, and Two Creeks is located in Manitowoc County, Wisconsin. The PSCW approved the acquisition of these two projects in April 2019. Commercial operation was achieved in November 2020 for Two Creeks, and is targeted for the second quarter of 2021 for Badger Hollow I. WPS owns 100 MW of Two Creeks and will own 100 MW of Badger Hollow I for a total of 200 MW. WPS's share of the cost of both projects is estimated to be approximately $260 million. Acquisition of a Wind Energy Generation Facility in Wisconsin In October 2017, WPS, along with two other unaffiliated utilities, entered into an agreement to purchase Forward Wind Energy Center, which consists of 86 wind turbines located in Wisconsin with a total capacity of 138 MW. The FERC approved the transaction in January 2018, and the PSCW approved the transaction in March 2018. The transaction closed in April 2018. See Note 2, Acquisitions, for more information. The Peoples Gas Light and Coke Company and North Shore Gas Company North Shore Gas Company 2021 Rate Case On October 15, 2020, NSG filed a request with the ICC to increase its natural gas rates. NSG's request is targeting a rate increase of $7.6 million (8.5%) and reflects a 10.0% ROE and a common equity component average of 52.5%. The proposed natural gas rate increase is primarily driven by NSG's ongoing significant investment in its distribution system since its last rate review that resulted in revised base rates effective January 1, 2015. New rates are expected to be effective in September 2021. Illinois Proceedings In December 2015, the ICC ordered a series of stakeholder workshops to evaluate PGL's SMP, which were completed in March 2016. In July 2016, the ICC initiated a proceeding to review, among other things, the planning, reporting, and monitoring of the program, including the target end date for the program, and issued a final order in January 2018. The order did not have a significant impact on PGL's existing SMP design and execution. An appeal related to the final order was filed by the Illinois AG in April 2018. In June 2019, the Illinois Appellate Court issued its ruling affirming the ICC’s final order. The appeal period has since expired for this ruling. Qualifying Infrastructure Plant Rider In July 2013, Illinois Public Act 98-0057, The Natural Gas Consumer, Safety & Reliability Act, became law. This law provides natural gas utilities with a cost recovery mechanism that allows collection, through a surcharge on customer bills, of prudently incurred costs to upgrade Illinois natural gas infrastructure. In January 2014, the ICC approved a QIP rider for PGL, which is in effect through 2023. PGL's QIP rider is subject to an annual reconciliation whereby costs are reviewed for accuracy and prudency. In March 2020, PGL filed its 2019 reconciliation with the ICC, which, along with the 2018, 2017 and 2016 reconciliations, are still pending. In July 2019, the ICC approved a settlement of the 2015 reconciliation, which included a rate base reduction of $7.0 million and a $7.3 million refund to ratepayers. In February 2018, PGL agreed to a settlement of the 2014 reconciliation, which included a rate base reduction of $5.4 million and a $4.7 million refund to ratepayers. As of December 31, 2020, there can be no assurance that all costs incurred under PGL's QIP rider during the open reconciliation years will be deemed recoverable by the ICC. Variable Income Tax Adjustment Rider In April 2018, the ICC approved the VITA proposed by PGL and NSG. The VITA recovers or refunds changes in income tax expense resulting from differences in income tax rates and amortization of deferred tax excesses and deficiencies (in accordance with the Tax Legislation) from the amounts used in the last PGL and NSG rate case, effective January 25, 2018. Minnesota Energy Resources Corporation 2018 Minnesota Rate Order In October 2017, MERC initiated a rate proceeding with the MPUC. In December 2018, the MPUC issued a final written order for MERC. The order authorized a retail natural gas rate increase of $3.1 million (1.26%). The rates reflect a 9.7% ROE and a common equity component average of 50.9%. The final rates were implemented on July 1, 2019. The final approved rate increase was lower than the interim rates collected from customers during 2018 and through June 30, 2019. Therefore, MERC refunded $8.2 million to its customers during the second half of 2019. The final order addressed the various impacts of the Tax Legislation, including the remeasurement of deferred tax balances. All of the impacts from the Tax Legislation have been included in base rates. The order also approved MERC's continued use of its decoupling mechanism for residential customers. Effective January 1, 2019, MERC's small commercial and industrial customers are no longer included in the decoupling mechanism. Michigan Gas Utilities Corporation 2021 Rate Application In February 2020, MGU provided notification to the MPSC of its intent to file an application requesting an increase to MGU's natural gas rates to be effective January 1, 2021. However, MGU decided that it would not file a rate case during the COVID-19 pandemic and would re-evaluate the timing of the rate filing at a later date. In May 2020, MGU filed an application with the MPSC requesting approval to defer $5.0 million of depreciation and interest expense during 2021 related to capital investments made by MGU since its last rate case. In July 2020, the MPSC issued a written order approving MGU's request. The deferral of these costs will help to mitigate the impacts from delaying the filing of the rate case. |