NORTH AMERICAN NICKEL INC.
Management Discussion and Analysis
For the Three Months Ended March 31, 2013
1
Preliminary Information
This Management’s Discussion and Analysis (“MD&A”) contains information up to and including May 29, 2013.
The following MD&A of North American Nickel Inc. (the “Company”) should be read in conjunction with the condensed interim financial statements for the three months ended March 31, 2013 and the related notes contained therein. In addition, the following should be read in conjunction with the audited financial statements for the year ended December 31, 2012 and the notes thereto. It should be noted that the audited financial statements for the year ended December 31, 2012 were prepared in accordance with International Financial Reporting Standards (“IFRS”).
All financial information in this MD&A related to the period ending March 31, 2013 have been prepared in accordance with International financial reporting standards (“IFRS”), and all dollar amounts are expressed in Canadian dollars unless otherwise indicated.
Caution Regarding Forward Looking Statements
Statements contained in this MD&A that are not historical facts are forward-looking statements (within the meaning of the Canadian securities legislation and the U.S. Private Securities Litigation Reform Act of 1995) that involve risks and uncertainties. Forward-looking statements include, but are not limited to, statements with respect to the future price of metals; the estimation of mineral reserves and resources, the realization of mineral reserve estimates; the timing and amount of estimated future production, costs of production, and capital expenditures; costs and timing of the development of new deposits; success of exploration activities, permitting time lines, currency fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, limitations on insurance coverage and the timing and possible outcome of pending litigation. In certain cases, forward-looking statements can be identified by the use of words such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such risks and other factors include, among others, risks related to the integration of acquisitions; risks related to operations; risks related to joint venture operations; actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of metals; possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors discussed in the sections entitled “Risks and Uncertainties” in this MD&A. Although the Company has attempted to identify important factors that could affect the Company and may cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements in this MD&A speak only as of the date hereof. The Company does not undertake any obligation to release publicly any revisions to these forward-looking statements to reflect events or circumstances after the date hereof to reflect the occurrence of unanticipated events.
Forward-looking statements and other information contained herein concerning the mining industry and general expectations concerning the mining industry are based on estimates prepared by the Company using data from publicly available industry sources as well as from market research and industry analysis and on assumptions based on data and knowledge of this industry which the Company believes to be reasonable. However, this data is inherently imprecise, although generally indicative of relative market positions, market shares and performance characteristics. While the Company is not aware of any misstatements regarding any industry data presented herein, the industry involves risks and uncertainties and is subject to change based on various factors.
Description of Business
The Company is a mineral exploration and resource development company engaged in the business of acquiring, exploring and evaluating mineral properties, and either joint venturing, developing or disposing of the properties, when the evaluation is complete. The Company is currently focusing its resources in conducting exploration programs on its Sudbury, Ontario nickel properties being Post Creek and Halcyon and in Greenland on the Maniitsoq Property. As well the Company is conducting an exploration program on its Manitoba nickel property being Thompson North.
Company History
North American Nickel Inc. (the “Company”) was incorporated under the laws of the Province of British Columbia, Canada, by filing of Memorandum and Articles of Association on September 20, 1983, under the name Rainbow Resources Ltd. The company’s name was changed to Widescope Resources Ltd. on May 1, 1984, and to Gemini Technology Inc. on September 17, 1985. In conjunction with a reverse split of its common shares on a five-old for one-new basis, the Company adopted the name International Gemini Technology Inc effective September 23, 1993. The Company’s name was changed to Widescope Resources Inc., effective July 12, 2006. Effective April 19, 2010 the Company’s shareholders approved a special resolution to reorganize the Company’s capital structure by consolidating in a reverse stock split the existing common shares on the basis of each two (2) old shares being equal to one (1) new share and concurrently increasing the authorized capital of the Company from 100,000,000 common shares without par value to an unlimited number of common shares without par value. Also effective this date the Company’s name was changed to North American Nickel Inc. to reflect its new focus. All references to common shares, stock options, warrants and weighted average number of shares outstanding in this discussion and the accompanying consolidated financial statements retroactively reflect the share consolidation unless otherwise noted.
In April 2010 the Company initiated a series of actions to realign its focus into the field of nickel exploration in the prolific nickel belts around Sudbury, Ontario and Thompson, Manitoba. These actions were reported in a news release dated April 6, 2010. Additionally, in April 2010 the Company’s shareholders elected 4 new directors, to replace three retiring directors. The directors of the Company have appointed new senior management to oversee the daily operations of the Company.
On May 3, 2011 the Company’s listing application was conditionally accepted by the TSX-V Venture Exchange. On May 30, 2011 the common shares of the Company began trading under the symbol “NAN”.
Trend Analysis
The business of the Company entails significant risks. Any analysis of the trend of the Company’s activities would reveal this and there is nothing to suggest that these trends will change.
The recoverability of amounts shown for mineral property costs is dependent upon a number of factors including environmental risk, legal and political risk, the existence of economically recoverable mineral reserves, confirmation of the Company’s interests in the underlying mineral claims, the ability of the Company to obtain necessary financing to complete exploration and development, and to attain sufficient net cash flow from future profitable production or disposition proceeds. As of March 31, 2013 the Company had working capital of $952,565 (December 31, 2012 $1,334,112) and a deficit of $16,902,064 (December 31, 2012 $16,713,822). The Company will require additional funding to meet its obligations and the costs of its operations.
When managing capital, the Company’s objective is to ensure the entity continues as a going concern as well as to maintain optimal returns to shareholders and benefits for other stakeholders. Management adjusts the capital structure as necessary in order to support the acquisition and exploration of mineral properties. The Board of Directors does not establish quantitative return on capital criteria for management, but rather relies on the expertise of the Company’s management team to manage its capital.
The properties in which the Company currently has an interest are in the exploration stage. As such, the Company is dependent on external financing to fund its activities. In order to carry out the planned exploration and pay for administrative costs, the Company will spend its existing working capital and raise additional amounts as needed. The Company will continue to assess new properties and seek to acquire interests in additional properties if there is sufficient geologic or economic potential and if it has adequate financial resources are available to do so. The Company has not yet determined whether these properties contain ore reserves that are economically recoverable.
Resource Properties
All technical information in this document has been reviewed by Dr. Mark Fedikow, PGeo, the qualified person for the Company under National Instrument 43-101.
Maniitsoq, Greenland:
The project is located adjacent to the coastline 160 km north of Nuuk, the capital of Greenland (a safe, stable, mining-friendly jurisdiction) and covers numerous high-grade nickel-copper & PGM sulphide occurrences associated with norite and other mafic-ultramafic intrusions. The deep water coastline adjacent to Maniitsoq is typical to that of Greenland’s south west coast being pack ice free and having a all year-round shipping season. The year round shipping conditions are due to the Irmenger current, a tributary of the warming Gulf Stream flowing continuously passed the south west coastline of Greenland. NAN acquired the project because it believes that modern, time-domain, helicopter EM systems will be more effective at detecting nickel sulphide deposits in the rugged terrain of Maniitsoq than previous geophysical surveys performed in the 1990’s that failed to produce any drill targets. Helicopter TEM systems were not available in 1990’s and their availability now gives NAN a significant advantage over previous explorers.
Effective August 15, 2011, the Company was granted an exploration license (the “Sulussugut License”) by the Bureau of Minerals and Petroleum (“BMP”) of Greenland for exclusive exploration rights of an area located near Sulussugut, Greenland. The Company paid a license fee of $5,742 (Danish krones (“DKK”) 31,400) upon granting of the Sulussugut License. The Sulussugut License is valid for 5 years until December 31, 2015, with December 31, 2011 being the first year.
On June 28, 2012, the Geological Survey of Denmark and Greenland announced that the Maniitsoq Structure, which the Company’s mineral exploration licenses cover a large portion of, is “The remains of a gigantic, 3 billion year old meteorite impact...” The paper concluded that the nickel-bearing Greenland Norite Belt, the focus of exploration for the Company, is directly related to this major geological event which is believed to be the oldest, and possibly the largest, such meteorite impact event so far recognized on Earth. The Company is working on the hypothesis that the impact created the extensive magma conduit system that now hosts the norites and Ni-Cu-Co-PGM mineralization.
The Company completed the first year exploration requirement, of a minimum of DKK 7,213,460 (approximately CDN $1,281,000), during the year ended December 31, 2011 by incurring $3,086,625 on the Sulussugut License.
The Company’s minimum required exploration expenditure for the second year was DKK 7,361,890 (approximately CDN $1,307,330). During the year ended December 31, 2012, the Company incurred $2,290,291 in exploration costs on the Sulussugut License.
During the year ended December 31, 2011, the Company’s expenditures exceeded the minimum requirement and the Company was granted a credit of DKK 1,275,997 (approximately CDN $227,000) for surplus exploration expenditures, which may be carried forward up to December 31, 2014 as a reduction of future exploration expenditure requirements.
The required minimum exploration expenditures on the Sulussugut License for years 3-5, ending December 31, 2015, have not yet been determined but, are based on an annual approximation of DKK 24,405,000 (approximately CDN $4,333,870). This assumes that the Sulussugut License area remains at its current size of 4,841 square kilometres. For every square kilometre that the license is reduced the required annual expenditure decreases by approximately DKK 5,041. The Company is obligated to reduce the license area by at least 30% (1,452 square kilometres) by December 31, 2013.
Effective March 4, 2012, the Company was granted an additional exploration license (the “Ininngui License”) by the BMP of Greenland for exclusive exploration rights of an area located near Ininngui, Greenland. The Company paid a license fee of $5,755 (DKK 32,200) upon granting of the Ininngui License. The Ininngui License is valid for 5 years until December 31, 2016, with December 31, 2012 being the first year.
The Company completed the first year exploration requirement, of a minimum of DKK 360,380(approximately $64,000), during the year ended December 31, 2012 by incurring $551,001 on the Ininngui License.
The required minimum exploration expenditures for year 2 on the Ininngui License are based an approximate DKK 242,000 (approximately CDN $43,000). The required minimum exploration expenditures for years 3-5, ending December 31, 2016 have not yet been determined but, are based on an annual approximation of DKK 2,730,000 (approximately CDN $480,000).
Future required minimum exploration expenditures will be adjusted each year on the basis of the change to the Danish Consumer Price Index.
Should the Company not incur the minimum exploration expenditures on either license in any one year from years 2-5, the Company may pay 50% of the difference in cash to BMP as full compensation for that year. This procedure may not be used for more than 2 consecutive calendar years and to December 31, 2012, the Company has not used the procedure for either license.
After year 5, the Company may apply for an additional 5 years for either license. Thereafter, the Company may apply for a license for up to 6 additional years, in 2 year license increments. The Company will be required to pay additional license fees and will be obligated to incur minimum exploration costs for such years.
The Company may terminate the licenses at any time; however any unfulfilled obligations according to the license will remain in force, regardless of the termination.
In conjunction with the granting of the Sulussugut Licence, the Company has entered into an arm’s length Intellectual Property and Data Acquisition Agreement (the “IP Acquisition Agreement”) with Hunter Minerals Pty Limited (“Hunter”) and Spar Resources Pty Limited (“Spar”). Pursuant to the IP Acquisition Agreement, Hunter and Spar agreed to sell the IP Rights to the Company in consideration for the Company paying $300,000 in cash ($150,000 to each of Hunter and Spar which is paid) and the issuing of 12,960,000 share purchase warrants, 6,480,000 to each of Hunter and Spar exercisable for a period of five years. The warrants are exercisable at the following prices, 4,750,000 of the warrants are at a price of $0.50 per share, 4,750,000 of the warrants are at a price of $0.70 per share and 3,460,000 of the warrants are at a price of $1.00 per share. The warrants are subject to an accelerated exercise provision in the event the Company relinquishes its interests in the Maniitsoq Licenses or any other mineral titles held within a defined area of interest without receiving consideration for such relinquishment. The granted warrants have been recorded at a fair value of $1,813,263 using the Black-Scholes option-pricing model. Granting to each of Hunter and Spar or their designates a 1.25% net smelter returns royalty, subject to rights of NAN to reduce both royalties to a 0.5% net smelter returns royalty upon payment to each of Hunter and Spar (or their designates) of $1,000,000 on or before the 60th day following a decision to commence commercial production on the mineral properties. On August 30, 2011 the Company issued 200,000 common shares at $0.14 per share for a value of $28,000 as a finder’s fee on the Greenland project.
Performance Summary:
In August 2011, known showings and targets, identified from a compilation of historical data, were examined by a team of two to three geologists plus a field assistant. A total of 54 representative rock samples were collected and submitted to Activation Laboratories for analysis. Drill cores from several Kyrolitselskabet Oresund A/S drill holes were examined at a government core facility in Kangerlussuaq, Greenland. Rock samples from previously known occurrences assayed up to 3.35% Ni and confirmed previous sampling results by Kyrolitselskabet Øresund A/S (1965-71, Cominco Ltd. (1995-96) and Falconbridge Greenland A/S (1993-2000).
Based on historical data and observations made during the field program, two areas, covering a total of 375 square kilometres, were selected for helicopter geophysical (electromagnetic and magnetic) surveying. SkyTEM ApS of Beder, Denmark was contracted to do the surveying, which commenced on September 17, 2011 and was completed on October 5, 2011. A total of 2,217 line-kilometers were flown. The quality of the data was monitored on a daily basis during the course of the survey by Condor Consulting of Lakewood, Colorado. A levelled, digital database was received from SkyTEM on November 17, 2011 and a complete logistical and processing report was received on December 6, 2011. Condor Consulting picked electromagnetic anomalies from the dataset. A total of 25 conductive zones, some corresponding to known nickel sulphide mineralization, were identified.
On December 27, 2011 the Company applied for a mineral exploration license covering approximately 142 square kilometers contiguous with its original license (2011/54).
In January and February 2012, Condor Consulting modeled 18 of the 25 conductive zones identified by the 2011 SkyTEM survey in three dimensions using Electromagnetic Imaging Technology’s Maxwell software package. Three of the eighteen modelled targets were selected for priority follow-up during the 2012 field season ahead of the first drill program on the property by the Company.
From June 7, 2012 to July 18, 2012 a helicopter electromagnetic survey, totaling 3,532 line-kilometers, was flown over portions of mineral exploration licences 2011/54 and 2012/28. The survey was performed by Geotech Ltd. of Aurora, Ontario. The quality of the data was monitored on a daily basis during the course of the survey by Condor Consulting. A levelled, digital database was received from Geotech on July 31, 2012 and a complete logistical and processing report was received on August 29, 2012. A preliminary interpretation of the data was done between August 1-13, 2012.
A field camp was mobilized from Nuuk to the project area on August 13, 2012. Ground checking of geophysical anomalies identified from the SkyTEM and VTEM surveys commenced on August 15, 2012 and a total of 40 rock samples (including standards and blanks) were submitted for geochemical/assay analysis. A diamond drill was mobilized to the project on August 25, 2012 and nine holes totaling 1,551 meters were drilled to test selected electromagnetic anomalies identified from the SkyTEM and VTEM surveys. The drilling was performed by Cartwright Drilling Inc. of Goose Bay, Labrador and was done in four target areas: Imiak Hill, Spotty Hill, Fossilik and P-59. The core was logged at the field camp and a total of 636 sawn core samples (including standards and blanks) were submitted for geochemical/assay analysis. Seven of the holes were surveyed with a three-component, down-hole electromagnetic probe operated by Crone Geophysics and Exploration Ltd. of Mississauga, Ontario. Geochemical/assay samples were submitted to Activation Laboratories Ltd. for analysis. Drilling was completed on September 16, 2012 and the drill and camp were demobilized from the project site by September 23, 2012. Analytical results from drill core and surface samples are pending.
On November 14, 2012, the Company announced the intersection of high grade nickel – copper mineralization at Imiak Hill. Two of the holes (MQ-12-001 and 002), both drilled on the same section, cored significant sulphide mineralization. The mineralization in MQ-12-001 averaged 1.36% Ni, 0.52% Cu and 0.07% Co over 16.41 meters including 5.12 meters at 2.20% Ni, 0.55% Cu and 0.07% Co. The mineralization in MQ-12-002 averaged 0.55% Ni, 0.20% Cu and 0.02% Co over 66.08 meters and included 14.18 meters at 1.33% Ni, 0.38% Cu and 0.04% Co. Holes MQ-12-003 and 004 did not intersect any significant mineralization and down-hole electromagnetic surveys in the holes indicated that both passed beneath the plunge of the mineralization.
On December 3, 2012, the Company announced a new discovery at Spotty Hill consisting of nickel-copper and PGE mineralization. The mineralization starts 50 metres below surface and also below previous shallow drilling that was completed in 1960-70’s. MQ-12-005 intersected123.94 meters (m) grading: 0.81% Nickel (Ni), 0.21% Copper (Cu), 0.03% Cobalt (Co) & 0.26 g/t Platinum (Pt) + Palladium (Pd) + Gold (Au).
During the three months ended March 31, 2013:
On January 15, 2013, the Company announced the completion of all analytical results from the 2012 drilling program confirming two significant areas of nickel-copper PGE mineralization.
On March 15, 2013, the Company announced first phase of QEMSCAN results, with visible and fine to coarse grained pentlandite in two of the three samples. Particle mineral analysis (PMA) of larger, coarse crushed core samples to determine mineralogy, grain size distribution and spatial characterization including liberation of sulphide minerals and Electron microprobe analysis (EMPA) for quantitative mineral chemistry to determine any solid solution including nickel in pyrrhotite and silicates are pending.
Polished sections have been prepared from selected rock samples in order to determine their mineralogy and petrology, Vancouver Petrographics have completed a report to the geological team.
Subsequent Events
On May 28, 2013 the Company announced that it had finalized its 2013 exploration plan for its 100% owned Maniitsoq project. The program, which is scheduled to commence in mid-June, will consist of a minimum of 3,000 meters of diamond drilling to follow-up on 2012 discoveries and test new geological, geophysical and geochemical targets identified from a review of exploration datasets. Surface pulse time domain electromagnetic (PEM) surveys and 550 line-km of helicopter time domain, electromagnetic and magnetic surveying will also be undertaken in areas not covered in 2011 and 2012.
Activities contemplated in the future
Channel sampling of disseminated sulphide zones and possible surface geophysical surveys are contemplated for Imiak and Spotty Hill.
Sudbury, Ontario nickel properties:
Post Creek Property
On December 23, 2009, the Company executed a letter of intent whereby the Company has an option to acquire the mineral claim known as the Post Creek Property located within the Sudbury Mining District of Ontario. The Company paid a non-refundable deposit of $7,500. On April 5, 2010 the Company entered into an option agreement to acquire rights to Post Creek Property. On March 12, 2013 the Post Creek Property Option Agreement was amended, as indicated in the schedule below. In order to acquire 100% working interests in the property, subject to certain net smelter return royalties (“NSR”) and advance royalty payments the Company agreed to the following amended consideration. Further, commencing the amended date of August 1, 2015, if the Company exercises its option, the Company will be obligated to pay advances on the NSR of $10,000 per annum, which will be deducted from any payments to be made under the NSR:
Exploration | ||||||||||||||||
Date | Cash | Issuance of shares | Requirements | |||||||||||||
On or before April 5, 2010 | $12,500 | 400,000 | paid & issued | |||||||||||||
On or before April 5, 2011 | $ | 30,000 | 300,000 | paid & issued | $ | 15,000 | Exploration requirements to April 5, 2011 $624,715 | |||||||||
On or before April 5, 2012 | $ | 50,000 | 300,000 | paid & issued | $ | 15,000 | Exploration requirements to April 5, 2012 $830,127 | |||||||||
On or before April 5, 2013 | $ | 15,000 | - | paid | $ | 15,000 | Exploration requirements to April 5, 2013 $975,049 | |||||||||
On or before April 5, 2014 | $15,000 | - | $15,000 | |||||||||||||
On or before April 5, 2015 | $15,000 | - | $15,000 |
The property is located 35 km east of Sudbury in Norman and Parkin townships and consists of 35 contiguous unpatented mining claims and one isolated claim covering an area of 688 hectares. It is strategically located adjacent to the producing Podolsky copper-nickel-platinum group metal deposit of FNX Mining. The property lies along the extension of the Whistle Offset Dyke Structure which is a major geological control for Ni-Cu-PGM mineralization. This structure hosted the former INCO Whistle Offset copper-nickel-PGM Mine as well as the Podolsky North and Podolsky 2000 copper-precious metal deposits. FNX forecast the production of 372,049 tons of ore at Podolsky yielding 1.8 million pounds of payable nickel, 28.5 million pounds of payable copper and 27,300 ounces of payable platinum, palladium and gold for 2009. Previous operators located the extension of the Whistle Offset Dyke structure on the Post Creek property as a direct result of their geological, geophysical and Mobile Metal Ion geochemical surveys. A reconnaissance rock sample collected along the structure assayed 0.83% Ni, 0.74% Cu, 0.07% Co, 2.24 g/t Pt and 1.05 g/t Pd. Significant potential for nickel-copper-PGM is demonstrated on the Post Creek property.
Performance Summary:
The exploration program to evaluate the mineral potential of the Whistle Offset Dyke Structure was initiated September 24, 2010. This project included outcrop stripping, washing and detailed mapping. There were also a number of reconnaissance programs initiated concurrently to evaluate the Post Creek property for shallowly-buried mineralization. The geophysical approach was based on the use of a beep mat and selected traverses across the property were undertaken. A number of elevated EM responses were obtained and a number of these areas were stripped of overburden using an excavator and washed using a Wajax pump. Exposed mineralization was chip sampled and sent to SGS Mineral Services for a multi-element analysis including assay for nickel, copper, cobalt, gold, platinum and palladium. Selected soil geochemical surveys were undertaken over historic IP chargeability anomalies. Samples were submitted June 9, 2011 to SGS Mineral Services for analysis using the Mobile Metal Ion Technology.
Extensive outcrop stripping with a mechanical excavator aided by power washing of outcrops was completed. Outcrop sampling, where warranted, was continued and assistance from experienced Sudbury geological consultants was retained for short periods to demonstrate the subtleties of mapping offset dyke structures. Ground VLF-EM and magnetic surveys were initiated.
Airborne VTEM geophysical survey results and ground IP and magnetic surveys undertaken by previous operators were obtained from the geophysical contractors in digital formats and integrated with geological and geochemical databases.
October 18, 2011 new geophysical data was acquired from Abitibi Geophysics from a newly cut grid on the Post Creek property. Electromagnetic and magnetic anomalies were detected and a seven hole diamond drill program consisting of 1532.5 metres. The exploration included down-hole pulsing to detect potential anomalies for future drill-testing.
On December 14, 2011 a seven hole diamond drill program was planned and implemented with Chenier drilling of Capreol, Ontario contracted to carry out a 1532.5 metre program.
On December 14, 2011 the Company announced the offset dyke or CJ Zone was expanded subsequent to previous ground geophysical surveys and prospecting by Cecil Johnson. Geophysical anomalies detected by the Abitibi Infinitem geophysical survey were drill tested and indicated the geophysical responses were attributable to heavily disseminated to near-solid pyrrhotite, pyrite and minor chalcopyrite. These mineralized zones were hosted within large blocks of mafic volcanic rocks present within the offset dyke and with oxide and lean iron formation. Drill core was sampled and submitted for assay to AGAT Laboratories. Results indicate generally low base and precious metal values in this mineralization. The mineralization is interpreted to be of Archean age occurring as veins/layers and disseminations within Archean rocks.
Analytical data, geological maps and historic geophysical information were compiled by Dr. Walter Peredery to form the basis for a 43-101 technical report which was submitted to the TSX Exchange on May 18, 2011 as part of listing requirements for North American Nickel. The report was accepted by the Exchange on May 27, 2011.
August 16, 2011, detailed prospecting by Mr. Cecil Johnson on behalf of the Company on the Post Creek property has resulted in the discovery of a previously unrecognized mineralized Offset dyke. The Offset dykes are recognized in the Sudbury mining camp as hosts to significant ore deposits and as such this discovery is considered extremely important. Follow-up outcrop stripping using a mechanical excavator accompanied by power washing to prepare the outcrop area for mapping and sampling has been initiated. The offset dyke has been named “the Cecil Johnson Offset Dyke” or “CJ#1” after Mr. Johnson, the discoverer.
A review of all characteristics of the CJ target zone and the results of diamond drilling indicate the CJ Zone is more accurately described as a breccias belt rather than a sharp-walled offset dyke. The breccias belt is along strike from the Podolsky nickel-copper-platinum group metal mine and as such the CJ Zone is still considered as a high-priority exploration target. The mineral potential of this re-interpreted offset dyke has been elevated owing to observations made by North American Nickel geologists aided by Andy Bite, a well-known and highly respected Sudbury geologist. The breccia belt is now interpreted as an embayment structure and will be explored accordingly.
A petrographic report on drill core samples from 2011 program was completed. The thin sections cut from the drill core confirm that the bottom of this new embayment has not been intersected by drilling, and consequently, the most prospective section of the observed embayment has not been reached. The petrographic work confirmed the size and extent of the mapped embayment, which is still open to the east and south, and possibly to the north as well.
During the three months ended March 31, 2013:
On March 12, 2013, the Company amended the Property Option Agreements on the Post Creek Property. The option agreement was amended by modifying the property expenditure and property payment requirements in order for the Optionee to earn a 100% interest in the claims.
During the three months ended March 31, 2013, the Company incurred $7,960 (December 31, 2012 - $49,466) in exploration costs on the Post Creek Property.
Subsequent Events
No subsequent event to report in the period.
Activities contemplated in the future
A joint venture partner continues to be sought out to follow-up the CJ Embayment structure.
Halcyon Property
On April 5, 2010, the Company entered into an option agreement to acquire rights to Halcyon Property. On March 12, 2013 the Halcyon Property Option Agreement was amended, as indicated in the schedule below. In order to acquire up to a 100% working interests in the property, subject to certain net smelter return royalties (“NSR”) and advance royalty payments the Company agreed to the following amended consideration. Further, commencing the amended date of August 1, 2015, if the Company exercises its option, the Company will be obligated to pay advances on the NSR of $8,000 per annum, which will be deducted from any payments to be made under the NSR:
Exploration | ||||||||||||||||
Date | Cash | Issuance of shares | Requirements | |||||||||||||
- | ||||||||||||||||
On or before April 5, 2010 | $15,000 | 300,000 | paid & issued | |||||||||||||
On or before April 5, 2011 | $ | 25,000 | 200,000 | paid & issued | $ | 22,000 | Exploration requirements to April 5, 2011 $40,299 | |||||||||
On or before April 5, 2012 | $ | 35,000 | 200,000 | paid & issued | $ | 22,000 | Exploration requirements to April 5, 2012 $53,985 | |||||||||
On or before April 5, 2013 | $ | 15,000 | - | paid | $ | 22,000 | Exploration requirements to April 5, 2013 $80,675 | |||||||||
On or before April 5, 2014 | $15,000 | - | $22,000 | |||||||||||||
On or before April 5, 2015 | $15,000 | - | $22,000 |
The property is located 35 Km NNE of Sudbury in the SE corner of Parkin Twp, and consists of 46 unpatented mining claims. It is readily accessible by paved and all-weather gravel road. Halcyon is adjacent to the Post Creek property and contains the extension of the metallogenetically significant Whistle Offset Structure now interpreted to represent an embayment. It is approximately 2 km north of the producing Podolsky Mine of FNX Mining. Previous operators on the property defined numerous conductive zones based on induced polarization (I.P.) surveys with coincident anomalous soil geochemistry. Base and precious metal mineralization have been found in multiple locations on the property but follow-up work was never done. The former producing Jon Smith Mine (nickel-copper-cobalt-platinum) is situated 1 Km North of the property.
Performance Summary:
Data compilation was initiated with the aim of delineating potential areas for follow-up exploration. Based on newly acquired information from the Post Creek property the adjacent Halcyon property will be the target of geological prospecting and geophysical activities.
On September 14, 2011 a partial cut grid was established on the western edge of the Halcyon property to accommodate the Abitibi Geophysics EM survey covering the adjacent Post Creek property.
On December 14, 2011, prospecting and a small amount of outcrop stripping were completed in preparation for a drill program. A single drill hole was put down on the southeast corner of the property with the purpose of providing geological information and to provide a platform for bore hole pulse EM (“BHPEM”). No anomalies were detected with the BHPEM although quartz diorite breccia and partial melt material with 2-3% disseminated pyrrhotite and chalcopyrite was intersected over short core lengths.
During the three months ended March 31, 2013:
On March 12, 2013, the Company amended the Property Option Agreements on the Halcyon Property. The option agreement was amended by modifying the property expenditure and property payment requirements in order for the Optionee to earn a 100% interest in the claims.
During the three months ended March 31, 2013, the Company incurred $7,171 (December 31, 2012 - $19,516) in exploration costs on the Halcyon Property.
Subsequent Events
No subsequent event to report in the period.
Activities contemplated in the future
A joint venture partner continues to be sought out to follow-up the CJ Embayment structure.
Wanapitei Intrusive Complex (“WIC”) Project
On April 17, 2012, the Company entered into a property option agreement to earn a 100% interest in a nickel-copper-platinum group element property in the Sudbury area. The Wahnapitae Intrusive Complex property (“WIC Property”) comprises 10 unpatented claims that cover an area measuring 3 km by 2km of the contral portion of the Complex. The Company must make cash payments in the aggregate amount of $120,000 and issue an aggregate of 225,000 common shares to the optionors over the three year term of the Option Agreement. The Company must also fund minimum exploration expenses on the WIC property of $63,000 over the term of the Option Agreement. Upon exercise of the option, the optionors will retain a 2% net smelter royalty (“NSR”) in the WIC Property and the Company will be required to make advance NSR payments of $8,000 per annum, commencing in August 2015. The Company has the right to buy back 50% of the NSR for $1,000,000 at any time prior to the commencement of commercial production on the WIC Property. In order to acquire 100% working interests in the property the Company agreed to the following consideration:
Date | Cash | Issuance of shares | Exploration Requirements | |||||||||
On or before April 30, 2012 | $20,000 | 75,000 | paid & issued | $— | ||||||||
On or before April 30, 2013 | $ | 25,000 | 75,000 | Dropped prior to April 17, 2013 | $21,000 | |||||||
On or before April 30, 2014 | $35,000 | 75,000 | $21,000 | |||||||||
On or before April 30, 2015 | $40,000 | - | $21,000 |
The WIC property is situated 13km southeast of Sudbury and 1 km south of Trans Canada Highway 17 at Wahnapitae. It is an elongate 5.6 km by 2.4 km layered mafic intrusion trending northeast-southwest that comprises nickel-copper-PGE mineralized gabbro-norite and a gabbro “Injection Breccia Zone”. The gabbro-norite segment includes massive and layered olivine-bearing norite, norite and gabbro whereas the Injection Breccia Zone consists of massive to fine-and coarse-grained gabbro. Geochemical and mineralogical studies at Laurentian University (Sudbury, Ontario) indicate the norite and gabbro have been intruded into continental settings near a plate margin with evidence to suggest up to 40% contamination of the parent magma with continental curst material. Depletion of nickel and copper in the gabbro-norite indicates some fractionation of these metals has occurred.
The WIC Property has received only sporadic exploration and no systematic programs using modern techniques and technologies have been applied to the property. Historic work along the southern edge of the WIC Property has documented the presence of extensive zones of gossanous outcrop. Public records show that other sampling of mineralization within the project area show enrichment in Ni-Cu-Co-PGMs. Early ground geophysical surveys outlined multiple electromagnetic conductors at the southern edge of the Complex that were never drill tested and large north-south magnetic anomalies have been delineated at the eastern edge of the Complex.
Performance Summary:
North American Nickel geologist visited numerous sulfide occurrences within the Southeastern Gabbro Norite zone to investigate the style of mineralization and collect samples for geochemistry (October 13th 2011). Future exploration was warranted focusing on the three separate Gabbro Norite zones to expand known mineralization and collect samples to determine the distribution of the Ni, Cu, and PGE within the intrusion. Of particular interest is the distribution of PGE grades within the sulfide mineralization, which is currently restricted to the Central Gabbro Norite zones.
The compilation of historic exploration data was completed. A two-man prospecting team collected 31 rock samples for analysis of PGE, gold, nickel and copper mineralization.
An assessment report has been completed for this work and submitted to Sudbury District Mining Recorders office.
Based on the compilation for the Wanapitei Intrusive Complex, the next stage in the project was the design and implementation of an airborne EM/MAG survey. This survey was flown in late August 2012 and was designed to identify near solid to solid sulphide mineralization to a depth of 250 metres below surface.
A grid-based rock geochemical survey was initiated to assess the WIC for base and precious metals. Results from this program failed to outline significant areas of PGE and nickel / copper mineralization.
During the three months ended March 31, 2013:
The property was returned to the vendors prior to April 17, 2013.
Manitoba nickel properties:
On July 23, 2010 the Company issued 6,000,000 shares at a price of $0.06 per share to a company with common directors in accordance with the Purchase and Sale Agreement entered into on April 5, 2010 to acquire ownership of the South Bay (dropped in 2012), Thompson North and Cedar Lake (dropped in 2012) properties in Manitoba, subject to a 2% NSR reserved by the vendor, in exchange for a $1,000 cash payment (paid) and 6,000,000 post-consolidation common shares valued at $0.06 per share (issued).
Thompson North
Performance Summary:
The property overlies the world class Thompson Nickel Belt (“TNB”) where Vale Inco continues to mine nickel-copper-cobalt and platinum group element mineralization hosted within sedimentary and mafic intrusive rocks. Based on research by the Manitoba Geological Survey the northeastern extension of the TNB has been traced through the Thompson North property making the area highly attractive for repetitions of TNB mineralization. Airborne geophysics (VTEM) has been flown over the property and numerous anomalous magnetic and electromagnetic features identified. Follow-up exploration will be based upon ranking and modeling of geophysics and soil geochemical surveys.
A compilation of historic exploration information was contracted to Revelation Geoscience Ltd. A report was completed and will be the basis for future exploration planning. Upon the review of this report, North American Nickel acquired mineral exploration licences to cover the most favourable targets from the report. A total of eight MEL’s were acquired, totaling over 58,000 hectares and covering 16 targets from the Revelation report. . Subsequent to data review and re-prioritization the eight MELs have been reduced to three (MEL 994A, 995A and 996A). The MELs were issued for a period of three years effective April 5, 2013. Targets on these MELs are to be drill tested in 2014.
During the three months ended March 31, 2013:
There have been no current activities on the property.
Subsequent Events
No subsequent events to report in the period.
Activities contemplated in the future
Targets have been prioritized and selected for follow-up diamond drilling in a winter 2014 program. A work permit has been granted subsequent to consultation with Nelson House First Nation, and Split Lake First Nations
Selected Financial Information
The Company’s condensed interim financial statements for the three months ended March 31, 2013 have been prepared in accordance with International Financial Reporting Standards (“IFRS”) and practices. Currency amounts are in Canadian dollars, except where stated otherwise. The following selected financial information is taken from the Condensed Financial Statements and should be read in conjunction with those statements.
For the three months ended | ||||||||||||||||||||||||||||
March 31, 2013 | March 31, 2012 | March 31, 2011 | ||||||||||||||||||||||||||
Financial Results | ||||||||||||||||||||||||||||
$ | $ | |||||||||||||||||||||||||||
Net loss | 188,242 | $ | 185,591 | 62,660 | ||||||||||||||||||||||||
Basic loss per share | 0.00 | 0.00 | 0.00 | |||||||||||||||||||||||||
As at: | March 31, 2013 | December 31, 2012 | December 31, 2011 | |||||||||||||||||||||||||
Balance Sheet Data | ||||||||||||||||||||||||||||
$ | ||||||||||||||||||||||||||||
Share capital | 22,796,694 | $ | 22,786,694 | $ | 18,782,644 | |||||||||||||||||||||||
Common shares issued | 80,660,193 | 80,560,193 | 55,058,193 | |||||||||||||||||||||||||
Weighted average shares outstanding | 80,636,860 | 69,179,749 | 46,464,082 | |||||||||||||||||||||||||
$ | ||||||||||||||||||||||||||||
Total assets | 8,962,423 | $ | 9,009,702 | $ | 6,109,703 | |||||||||||||||||||||||
Net assets (liabilities) | 8,818,679 | 8,946,548 | 5,943,608 | |||||||||||||||||||||||||
Exchange rates (Cdn$ to U.S.$) period average | 1.0086 | 1.0004 | 1.0110 |
Results of Operations
Three Months Ended March 31, 2013 compared with Three Months Ended March 31, 2012
For the three months ended March 31, 2013, the Company incurred a net loss of $188,242 compared to a net loss of $185,591 for the three months ended March 31, 2012. The increase of $2,651 in net loss is a result of general operating costs increased by $4,110 which is mainly the result of an increase of $31,388 in share-based payments for the fair value of stock options granted in the period, investor relation costs decreased by $42,624 due to a decrease in investor relation consulting fees and less trade show travel, an increase in geological consulting fees of $13,171, a decrease of $5,642 in professional fees mainly legal fees, and a net increase in general operations of $7,818 as a result of the daily activities taking place. There was a foreign exchange loss of $6,875 as a result of exploration in Greenland and the costs in the DKK currency.
During the three months ended March 31, 2013, the Company had total assets of $8,962,423 a decrease of $47,279 since December 31, 2012 which reported total assets of $9,009,702. This decrease is a result general operating costs which have stayed in line with the previous year. The Company had an increase in exploration and evaluation assets of $257,064 since December 31, 2012 due to the exploration program planned for Greenland. The Company in the year 2012 raised $3,400,000 through a private placement and spent $3,023,347 on property exploration during the year ending 2012.
Selected Financial Data Quarterly
Three months ended | ||||||||||||||||||||||||||||||||||||
March 31, 2013 | December 31, 2012 | September 30, 2012 | June 30, 2012 | |||||||||||||||||||||||||||||||||
Net loss | $(188,242) | $(394,308) | $(538,690) | $(334,973) | ||||||||||||||||||||||||||||||||
Basic loss per share | 0.00 | 0.01 | 0.01 | 0.01 | ||||||||||||||||||||||||||||||||
Three months ended | ||||||||||||||||||||||||||||||||||||
March 31, 2012 | December 31, 2011 | September 30, 2011 | June 30, 2011 | |||||||||||||||||||||||||||||||||
Net loss | $(185,591) | $(384,284) | $(374,561) | $(262,686) | ||||||||||||||||||||||||||||||||
Basic loss per share | 0.00 | 0.00 | (0.01 | ) | (0.01 | ) | ||||||||||||||||||||||||||||||
Balance Sheet Data | ||||||||||||||||||||||||||||||||||||
As at: | March 31, 2013 | December 31, 2012 | September 30, 2012 | June 30, 2012 | ||||||||||||||||||||||||||||||||
Share capital | $ 22,796,694 | $22,786,694 | $22,453,694 | $22,422,944 | ||||||||||||||||||||||||||||||||
Common shares issued | 80,660,193 | 80,560,193 | 77,230,193 | 76,922,693 | ||||||||||||||||||||||||||||||||
Weighted average shares outstanding | 80,636,860 | 69,179,749 | 66,117,922 | 60,922,973 | ||||||||||||||||||||||||||||||||
Total assets | $ | 8,962,423 | $ | 9,009,702 | $ | 9,266,296 | $ | 9,331,948 | ||||||||||||||||||||||||||||
Net assets (liabilities) | $ | 8,818,679 | $ | 8,946,548 | $ | 8,994,187 | $ | 9,097,786 | ||||||||||||||||||||||||||||
As at: | March 31, 2012 | December 31, 2011 | September 30, 2011 | June 30, 2011 | ||||||||||||||||||||||||||||||||
Share capital | $ 18,998,694 | $18,782,644 | $18,671,750 | $18,371,250 | ||||||||||||||||||||||||||||||||
Common shares issued | 56,747,693 | 55,058,193 | 55,058,193 | 51,853,193 | ||||||||||||||||||||||||||||||||
Weighted average shares outstanding | 56,426,001 | 46,464,082 | 43,571,377 | 38,918,162 | ||||||||||||||||||||||||||||||||
Total assets | $ | 6,032,812 | $ | 6,109,703 | $ | 8,022,816 | $ | 4,306,174 | ||||||||||||||||||||||||||||
Net assets (liabilities) | $ | 5,985,952 | $ | 5,943,608 | $ | 7,696,949 | $ | 4,212,427 |
The quarters ended September 30, 2012, September 30, 2011 and June 30, 2011 recorded an increased net loss as a result of share-based compensation charges reported of $404,340, $275,000 and $97,760 respectively as a result of stock option grants in those quarters. The quarters ended December 31, 2012, June 30, 2012 and December 31, 2011 recorded property impairment amounts of $233,760, $134,543 and $267,462 respectively as a result of writing down WIC Property, South Bay property and the Bell and Woods Creek properties and Cedar Lake property. In the quarter ended June 30, 2011 the Company raised funds of $3,200,000 through a private placement accounting for the increase in total assets. In the quarter ended September 30, 2011 the Company entered into an intellectual property and data acquisition agreement in conjunction with the acquisition of the Maniitsoq mineral exploration license for a fair value of $3,240,000 increasing total assets reported. In the quarter ended December 31, 2011 the Company recorded an adjustment on the fair value of the amount calculated for the intellectual property and data acquisition agreement of $1,298,737 reducing total assets. In the quarter ended June 30, 2012 the Company raised funds of $3,400,000 through a private placement increasing total assets.
Liquidity
As at March 31, 2013 the Company had accumulated losses totaling $16,902,064. The Company had working capital of $952,565 at March 31, 2013. The continuation of the Company is dependent upon the continued financial support of shareholders, its ability to raise capital through the issuance of its securities, as well as obtaining long-term financing when the company concludes an appropriate merger or acquisition agreement. On April 22, 2013, the Company closed the first tranche of a non-brokered Private Placement. Gross proceeds of $4,458,345 were raised through the issue of 26,225,561 units. Each unit consist of one common share and one-half of a common share purchase Warrant. Each whole Warrant entitles the holder to purchase one common share at a price of C$0.21 per share. Finder’s fees of $62,009.50 were paid in cash in connection with the private placement.
The Company has financed its operations to date primarily through the issuance of common shares and exercise of stock options and warrants. The Company continues to seek capital through various means including the issuance of equity and/or debt and the securing of joint venture partners where appropriate.
Capital Management
When managing capital, the Company’s objective is to ensure the entity continues as a going concern as well as to maintain optimal returns to shareholders and benefits for other stakeholders. Management adjusts the capital structure as necessary in order to support the acquisition and exploration of mineral properties. The Board of Directors does not establish quantitative return on capital criteria for management, but rather relies on the expertise of the Company’s management team to manage its capital.
The properties in which the Company currently has an interest are in the exploration stage. As such, the Company is dependent on external financing to fund its activities. In order to carry out the planned exploration and pay for administrative costs, the Company will spend its existing working capital and raise additional amounts as needed. The Company will continue to assess new properties and seek to acquire an interest in additional properties if it feels there is sufficient geologic or economic potential and if it has adequate financial resources to do so.
Management considers its approach to capital management to be appropriate given the relative size of the Company. There were no changes in the Company’s approach to capital management during the period.
Financial Instruments and Other Instruments
The Company’s financial instruments consist of cash and cash equivalents, receivables and trade payables and accrued liabilities. Cash and cash equivalents are designated as held for trading and therefore carried at fair value, with the unrealized gain or loss recorded in income. Receivables are designated as loan receivables and trade payables, are designated as other financial liabilities and recorded at amortized cost. Marketable securities are available for sale with the unrealized gain or loss recorded in other comprehensive income.
The fair value hierarchy establishes three levels to classify inputs to the valuation techniques used to measure fair value. Level 1 inputs are quoted market prices (unadjusted) in active markets for identical assets or liabilities. Level 2 inputs are inputs other than quoted market prices included in Level 1 that are observable for the asset or liability, either directly or indirectly. Level 3 inputs are unobservable (supported by little or no market activity).
Cash and cash equivalents are stated at fair value and are classified as Level 1 of the fair value hierarchy. The fair values of accounts receivables and trade payables approximate carrying value because of the short term nature of these instruments.
The fair value of available for sale investments are determined based on a market approach reflecting the closing price of each particular security at the closing balance sheet date. The closing price is a quoted market price obtained from the exchange that is the principal active market for the particular security, and therefore available for sale securities are classified within Level 1 of the fair value hierarchy.
Financial Instrument Risk Factors
Risk management is carried out by the Company’s management team with guidance from the Board of Directors. The Company’s risk exposures and their impact on the Company’s financial instruments are summarized below:
Credit Risk
The Company’s credit risk is primarily attributable to cash, short-term investments and amounts receivable. Cash and cash equivalents, and short-term investments are held with one reputable Canadian chartered bank which is closely monitored by management. Financial instruments included in amounts receivable consist primarily of HST/GST recoverable from the Canadian government. Management believes that the credit risk concentration with respect to financial instruments included in cash and cash equivalents, short-term investments and amounts receivable is minimal.
Liquidity Risk
The Company’s approach to managing liquidity risk is to ensure that it will have sufficient liquidity to meet liabilities when due. As at March 31, 2013, the Company held cash and a short-term investment totaling $1,064,804 (December 31, 2012 — $1,366,463) and had current liabilities of $143,744 (December 31, 2012 — $63,154). All of the Company’s liabilities have contractual maturities of less than 30 days and are subject to normal trade terms.
Market Risk
i) Interest Rate Risk
The Company had cash balances and no interest bearing debt. The Company’s current policy is to invest excess cash in investment-grade short-term deposit certificates issued by its banking institutions. The Company periodically monitors the investments it makes and is satisfied with the creditworthiness of its banks. As of March 31, 2013, the Company had non-interest bearing accounts with one Canadian chartered bank.
ii) Foreign Currency Risk
The Company is exposed to the financial risk related to fluctuations of foreign exchange rates. The Company operates in Canada and Greenland and a portion of exploration and evaluation assets are incurred in US dollars, Euros and Danish krones (“DKK”). The Company has not hedged its exposure to currency fluctuations, however foreign currency risk is considered low as the majority of transactions are settled and reported in Canadian dollars.
iii) Price Risk
The Company is exposed to price risk with respect to commodity and equity prices. Equity price risk is defined as the potential adverse impact on the Company’s earnings due to movements in individual equity prices or general movements in the level of the stock market. Commodity price risk is defined as the potential adverse impact on earnings and economic value due to commodity price movements and volatilities. The Company closely monitors commodity prices of precious metals, individual equity movements, and the stock market to determine the appropriate course of action to be taken by the Company.
Accounting Standards Not Yet Effective
Other accounting standards or amendments to existing accounting standards that have been issued but have future effective dates are either not applicable or are not expected to have a significant impact on the Company’s financial statements.
IFRS 9, Financial instruments
This new standard is a partial replacement of IAS 39 “Financial Instruments: Recognition and Measurement”. IFRS 9 uses a single approach to determine whether a financial asset is measured at amortized cost or fair value, replacing the multiple rules in IAS 39. The approach in IFRS 9 is based on how an entity manages its financial instruments in the context of its business model and the contractual cash flow characteristics of the financial assets. The new standard also requires a single impairment method to be used, replacing the multiple impairment methods in IAS 39. IFRS 9 is effective for annual periods beginning on or after January 1, 2015.
IFRS 13, Fair value measurement
This new standard replaces the fair value measurement guidance currently included in various other IFRS standards with a single definition of fair value and extensive application guidance. IFRS 13 provides guidance on how to measure fair value and does not introduce new requirements for when fair value is required or permitted. It also establishes disclosure requirements to provide users of the financial statements with more information about fair value measurements. IFRS 13 is effect for annual periods beginning on or after January 1, 2013.
Amendments to IAS 32, Financial instruments: presentation
These amendments address inconsistencies when applying the offsetting requirements, and is effective for annual periods beginning on or after January 1, 2014.
Financial statement presentation
In June 2011, the IASB and the Financial Accounting Standards Board (“FASB”) issued amendments to standards to align the presentation requirements for other comprehensive income (“OCI”). The IASB issued amendments to IAS 1 “Presentation of Financial Statements”to require companies preparing financial statements under IFRS to group items within OCI that may be reclassified to the profit or loss. The amendments also reaffirm existing requirements that items in OCI and profit or loss should be presented as either a single statement or two consecutive statements. The amendments are effective for fiscal years beginning on or after July 1, 2012.
Additional Disclosure for Venture Issuers Without Significant Revenue
The business of the Company entails significant risks, and an investment in the securities of the Company should be considered highly speculative. An investment in the securities of the Company should only be undertaken by persons who have sufficient financial resources to enable them to assume such risks. The following is a general description of all material risks, which can adversely affect the business and in turn the financial results, ultimately affecting the value of an investment the Company.
The Company has no significant revenues.
The Company has limited funds.
There is no assurance that the Company can access additional capital.
There is no assurance that the Company will be successful in its quest to find a commercially viable quantity of mineral resources.
The Company has a history of operating losses and may have operating losses and a negative cash flow in the future.
The Company’s auditors have indicated that U.S. reporting standards would require them to raise a concern about the company’s ability to continue as a going concern.
Off-Balance Sheet Arrangements
There are no off-balance sheet arrangements.
Table of Property Contractual Obligations
Post Creek | ||||||||||||||||
Date | Cash | Issuance of shares | Exploration Requirements | |||||||||||||
On or before April 5, 2010 | $12,500 | 400,000 | paid & issued | |||||||||||||
On or before April 5, 2011 | $ | 30,000 | 300,000 | paid & issued | $ | 15,000 | Exploration requirements to April 5, 2011 $624,715 | |||||||||
On or before April 5, 2012 | $ | 50,000 | 300,000 | paid & issued | $ | 15,000 | Exploration requirements to April 5, 2012 $830,127 | |||||||||
On or before April 5, 2013 | $ | 15,000 | - | paid | $ | 15,000 | Exploration requirements to April 5, 2013 $975,049 | |||||||||
On or before April 5, 2014 | $15,000 | - | $15,000 | |||||||||||||
On or before April 5, 2015 | $15,000 | - | $15,000 |
Halcyon | ||||||||||||||||
Date | Cash | Issuance of shares | Exploration Requirements | |||||||||||||
On or before April 5, 2010 | $15,000 | 300,000 | paid & issued | |||||||||||||
On or before April 5, 2011 | $ | 25,000 | 200,000 | paid & issued | $ | 22,000 | Exploration requirements to April 5, 2011 $40,299 | |||||||||
On or before April 5, 2012 | $ | 35,000 | 200,000 | paid & issued | $ | 22,000 | Exploration requirements to April 5, 2012 $53,985 | |||||||||
On or before April 5, 2013 | $ | 15,000 | - | paid | $ | 22,000 | Exploration requirements to April 5, 2013 $80,675 | |||||||||
On or before April 5, 2014 | $15,000 | - | $22,000 | |||||||||||||
On or before April 5, 2015 | $15,000 | - | $22,000 |
Related Party Transactions
Related party transactions were in the normal course of business and have been recorded at the exchange amount which is the fair value agreed to between the parties. Amounts due to related parties are unsecured, non-interest bearing and without specific terms of repayment.
During the period ended December 31, 2012 and 2011, the Company entered into transactions with related parties comprised of directors, officers and companies with common directors as follows:
Related party Nature of transaction—
Mount Morgan Resources Ltd. | Geological consulting fees provided by Mark Fedikow, President for a monthly retainer of $6,000 | |
Dockside Capital Group Inc. | Management fees for services provided by directors for a monthly retainer of $4,000. |
VMS Ventures Inc. Management fees for services provided by Rick Mark for a monthly retainer of $5,000, CEO, Cheryl Messier for an adjusted monthly retainer of $5,500, CFO, Neil Richardson adjusted monthly retainer of $6,000, COO and shared administrative costs. |
Included in trade payables and accrued liabilities as at March 31, 2013 is $3,680 (Dec 2012- $2,765) owing to VMS Ventures Inc. for shared administrative costs.
During the three months ended March 31, 2013, the Company recorded $2,700 (March 31, 2012 — $3,600) in rent expense to a company controlled by directors in common.
For the year ended March 31, 2013, the Company paid $15,000 (March 31, 2012 — $15,000) for management fees to VMS Ventures Inc. regarding Rick Mark, CEO and to Dockside Capital Group Inc. $12,000 (March 31, 2012 — $12,000) regarding services from two directors.
Included in exploration and evaluation assets for the three months ended March 31, 2013 is $Nil (March 31, 2012 – $11,600) which Mount Morgan Resources Ltd. was paid regarding geological fees for Mark Fedikow, President and VMS Ventures Inc. was paid $Nil (March 31, 2012 — $2,000) regarding geological fees for Neil Richardson, COO
Included in geological consulting fees for the three months ended March 31, 2013 is $18,000 (March 31, 2012 – $6,400) which Mount Morgan Resources Ltd. was paid regarding geological fees for Mark Fedikow, President.
The Company has identified certain directors and certain senior officers as its key management personnel. The compensation costs for key management personnel for the period ended March 31, 2013 and 2012 are as follows:
March 31, | March 31, | |||||||
2013 | 2012 | |||||||
Geological consulting fees — expensed | $ | 18,000 | $ | 6,400 | ||||
Geological consulting fees - capitalized | — | 11,600 | ||||||
Management fees — expensed | 27,000 | 27,000 | ||||||
Stock-based compensation | — | — | ||||||
$ | 45,000 | $ | 45,000 | |||||
Subsequent Events |
On April 22, 2013, the Company closed the first tranche of a non-brokered Private Placement. Gross proceeds of $4,458,345 were raised through the issue of 26,225,561 units. Each unit consist of one common share and one-half of a common share purchase Warrant. Each whole Warrant entitles the holder to purchase one common share at a price of C$0.21 per share. Finder’s fees of $62,009.50 were paid in cash in connection with the private placement.
As announced April 17, 2013 and related to Multilateral Instrument 31-101, “Protection of Minority Shareholders in Special Transactions”, an additional closing on proceeds of $2,595,752.27 from The Sentient Group and VMS Ventures is expected to take place on or about June 13, 2013. These funds are currently held in trust and will be released to the Company upon the Company’s disinterested shareholders ratifying approval of that closing at the annual and special general meeting scheduled for that day.
The Company granted 200,000 stock options to a consultant exercisable at a price of $0.15 per share for a period of five years.
On April 1, 2013, the Company issued a $15,000 cash payment on the Post Creek Property and a $15,000 cash payment on the Halcyon Property to cover the commitments on the amended property agreements.
Share Capital Data
The following table sets forth the Company’s share capital data as at May 29, 2013
Common Shares106,885,754 -issued & outstandingPreferred Shares604,724 -issued & outstandingOptions -issued & outstanding 7,883,000Warrants -issued & outstanding 36,072,778 |
Further Information
Additional information about the Company is available at the Canadian disclosure websitewww.sedar.com