ROWAN COMPANIES, INC. LAND RIG FLEET AND CONTRACT STATUS As of November 24, 2009 |
ONSHORE RIGS | Maximum | Contract Status | |||||||||||||||
Horsepower | Drilling | Estimated | |||||||||||||||
Name | Type | Drawworks | Mud Pumps | Depth (feet) | Location | Customer | Duration | Comments | |||||||||
Rig 9 | Diesel electric | 2,000 | 3,200 | 20,000 | Texas | Available | |||||||||||
Rig 12 | SCR diesel electric | 1,500 | 2,600 | 18,000 | Texas | Legend | February 2010 | ||||||||||
Rig 14 | AC electric | 3,000 | 3,200 | 35,000 | Texas | Available | |||||||||||
Rig 15 | AC electric | 3,000 | 3,200 | 35,000 | Texas | Available | |||||||||||
Rig 18 | SCR diesel electric | 2,000 | 4,400 | 25,000 | Texas | Available | |||||||||||
Rig 26 | SCR diesel electric | 2,000 | 4,800 | 25,000 | Texas | Available | |||||||||||
Rig 29 | Mechanical | 1,500 | 2,600 | 18,000 | Texas | Available | |||||||||||
Rig 30 | AC electric | 2,000 | 2,600 | 20,000 | Texas Louisiana | BBX Chesapeake | November 2009 December 2010 | Rig is expected to commence operations early December 2009. | |||||||||
Rig 31 | SCR diesel electric | 3,000 | 4,400 | 35,000 | Texas | Available | |||||||||||
Rig 33 | SCR diesel electric | 1,500 | 3,200 | 18,000 | Texas | Available | |||||||||||
Rig 34 | SCR diesel electric | 2,000 | 4,400 | 25,000 | Texas | Available | |||||||||||
Rig 35 | SCR diesel electric | 1,500 | 4,400 | 18,000 | Texas | Cabot | July 2010 | ||||||||||
Rig 51 | SCR diesel electric | 2,000 | 4,400 | 25,000 | Texas | Newfield | June 2010 | ||||||||||
Rig 52 | SCR diesel electric | 2,000 | 4,400 | 25,000 | Texas | Available | |||||||||||
Rig 53 | SCR diesel electric | 2,000 | 4,400 | 25,000 | Texas Louisiana | Krescent Chesapeake | November 2009 December 2010 | Rig is expected to commence operations early December 2009. | |||||||||
Rig 54 | SCR diesel electric | 2,000 | 4,400 | 25,000 | Louisiana | Chesapeake | November 2010 | ||||||||||
Rig 59 | AC electric | 2,000 | 3,200 | 25,000 | Louisiana | EnCana | August 2012 | ||||||||||
Rig 60 | AC electric | 2,000 | 3,200 | 25,000 | Texas | Devon | April 2011 | ||||||||||
Rig 61 | AC electric | 2,000 | 3,200 | 25,000 | Texas | EnCana | June 2015 | ||||||||||
Rig 62 | AC electric | 2,000 | 3,200 | 25,000 | Texas | Devon | March 2011 | ||||||||||
Rig 63 | AC electric | 2,000 | 3,200 | 25,000 | Texas | EnCana | November 2014 | ||||||||||
Rig 64 | AC electric | 2,000 | 3,200 | 25,000 | Texas | Available | |||||||||||
Rig 65 | AC electric | 2,000 | 3,200 | 25,000 | Texas Louisiana | Available EnCana | June 2010 | Rig is expected to commence operations at the beginning of January 2010. | |||||||||
Rig 66 | AC electric | 2,000 | 3,200 | 25,000 | Texas Texas | PetroQuest EnCana | November 2009 May 2010 | ||||||||||
Rig 67 | AC electric | 2,000 | 3,200 | 25,000 | Texas | ConocoPhillips | January 2010 | ||||||||||
Rig 68 | AC electric | 2,000 | 3,200 | 25,000 | Alaska | Pioneer | March 2010 | ||||||||||
Rig 76 | AC electric | 2,000 | 3,200 | 25,000 | Louisiana | EnCana | April 2011 | ||||||||||
Rig 77 | AC electric | 2,000 | 3,200 | 25,000 | Texas | EnCana | December 2012 | ||||||||||
Rig 84 | AC electric | 2,000 | 3,200 | 25,000 | Texas | EnCana | May 2011 | ||||||||||
Rig 85 | AC electric | 2,000 | 3,200 | 25,000 | Texas | Common Resources | October 2010 | ||||||||||
Rig 86 | AC electric | 2,000 | 3,200 | 25,000 | Texas | EnCana | February 2012 | ||||||||||
Rig 87 | AC electric | 2,000 | 3,200 | 25,000 | Texas | Common Resources | May 2012 |
Rigs 9 through 35 were constructed at various dates between 1960 and 1982, utilizing new as well as used equipment, and have since been substantially rebuilt. Rigs 51, 52, 53 and 54 were constructed during 2001-02. Rigs 59 through 66 were completed during 2006, Rigs 67 through 77 during 2007, Rigs 84 and 85 in 2008 and Rigs 86 and 87 in 2009. All but Rig 29 are equipped with a top-drive drilling system. Day rates range from $13,000 to $27,500. Estimated contract durations reflect either stated drilling periods expected time required for the contracted well or wells. Estimated number of idle days during October 2009 was 404 (59% utilization). | |
ROWAN HEREBY ADVISES THAT THE TABLE SET FORTH ABOVE MAY CONTAIN INACCURATE, INCOMPLETE AND/OR INCORRECT INFORMATION AND IS SUBJECT TO CHANGE AT ANY TIME. THE INFORMATION SHOULD NOT BE RELIED UPON FOR ANY PURPOSE, AND ROWAN HEREBY DISCLAIMS ANY LIABILITY RELATING TO THE USE OF THE INFORMATION SET FORTH ABOVE. | |
This report contains forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including, without limitation, statements as to the expectations, beliefs and future expected financial performance of the Company that are based on current expectations and are subject to certain risks, trends and uncertainties that could cause actual results to differ materially from those projected by the Company. Relevant factors have been disclosed in the Company's filings with the U. S. Securities and Exchange Commission. | |
Revisions to Fleet Status Report Noted in Bold |