* Well Objective Lat. Length (1) Stages (1) 30-day IP (boepd) (1,2) Status Ravin 1H Three Forks 10,000 23 391 Producing Stenehjem 1H Middle Bakken 6,000 17 688 Producing Jore Federal 3H Three Forks 10,000 35 510 Producing Ravin 26-35 2H , 3H Middle Bakken 10,000 16 524 Producing Lillibridge 2H, 4H Three Forks 9,000 28 940 Producing Lillibridge 1H, 3H Middle Bakken 10,000 33 1,283 Producing Lillibridge 6H, 8H Three Forks 10,000 33 971 Producing Lillibridge 5H, 7H Middle Bakken 10,000 34 1,027 Producing Jore 1H Three Forks 10,000 33 1,037 Producing Jore 2H, 4H Middle Bakken 10,000 33 904 Producing Ravin 4H, 5H, 6H, 7H Middle Bakken 10,000 33 1,254 Producing, first downspacing test Stenehjem 2H, 4H Three Forks 10,000 33 863 Producing Stenehjem 3H Middle Bakken 10,000 33 1,057 Producing Jore 5H Middle Bakken 10,000 NA NA Lateral cased Jore 6H Middle Bakken 10,000 NA NA Lateral cased Jore 7H Middle Bakken 10,000 NA NA Drilling lateral Jore 8H Middle Bakken 10,000 NA NA Intermediate cased Bakken / Three Forks Focused on Execution Represents the average lateral length, number of stages and 30-day IP for each group of wells. The production rates for each well do not include the impact of natural gas liquids and shrinkage at the processing plant and include flared gas.