ELDORADO GOLD CORPORATION
FORM 51-102F3
MATERIAL CHANGE REPORT
Item | 1. Name and Address of Company |
Eldorado Gold Corporation (“Eldorado”, the “Company” or “we”)
Suite 1188 – Bentall 5
550 Burrard Street
Vancouver, British Columbia V6C 2B5
Item | 2. Date of Material Change |
October 30, 2014
Item | 3. News Release |
Two news releases were disseminated by Marketwired and filed on SEDAR on October 30, 2014.
Item | 4. Summary of Material Change |
On October 30, 2014, Eldorado issued a news release reporting its financial and operational results for the third quarter ended September 30, 2014 (the “First Release”). Also on October 30, 2014, Eldorado issued a second news release with respect to its financial and operational results for the third quarter ended September 30, 2014 (the “Second Release”), which Second Release supersedes and replaces the First Release in its entirety and corrects certain typographical errors contained in the First Release.
Item | 5. Full Description of Material Change |
On October 30, 2014, Eldorado issued the First Release reporting its financial and operational results for the third quarter ended September 30, 2014. Also on October 30, 2014, Eldorado issued the Second Release with respect to its financial and operational results for the third quarter ended September 30, 2014, which Second Release supersedes and replaces the First Release in its entirety and corrects certain typographical errors contained in the First Release.
Please see the Second Release, attached hereto as Schedule “A”, for a full description of the material change.
Certain of the statements made herein may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information herein include, but are not limited, to statements or information with respect to the Company’s 2014 Third Quarter Financial and Operating Results.
Forward-looking statements and forward-looking information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. We have made certain assumptions about the forward-looking statements and information, including assumptions about the legal restrictions regarding the payment of dividends by the Company; assumptions about the price of gold; anticipated costs and expenditures; estimated production, mineralreserves and metallurgical recoveries; financial position, reserves and resources and gold production;and the ability to achieve our goals. Although our management believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that the forward-looking statements or information will prove to be accurate. Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. These risks, uncertainties and other factors include, among others, the following: gold price volatility; risks of not meeting production and cost targets; discrepancies between actual and estimated production, mineral reserves and resources and metallurgical recoveries; mining operational and development risk; litigation risks; regulatory restrictions, including environmental regulatory restrictions and liability; risks of sovereign investment and operating in foreign countries; currency fluctuations; speculative nature of gold exploration; global economic climate; dilution; share price volatility; competition; loss of key employees; additional funding requirements; and defective title to mineral claims or property, as well as those factors discussed in the sections entitled “Forward-Looking Statements” and "Risk Factors" in the Company's Annual Information Form & Form 40-F dated March 28, 2014
There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, you should not place undue reliance on the forward-looking statements or information contained herein. Except as required by law, we do not expect to update forward-looking statements and information continually as conditions change and you are referred to the full discussion of the Company's business contained in the Company's reports filed with the securities regulatory authorities in Canada and the U.S.
Item | 6. Reliance on 7.1(2) of National Instrument 51-102 |
Not applicable.
Item | 7. Omitted Information |
Not applicable.
Executive Officer
Name of Executive Officer: Dawn Moss
Corporate Secretary
Telephone number: (604) 601 6655
Item | 8. Date of Report |
November 7, 2014
SCHEDULE “A”
NEWS RELEASE | ELD No. 14-12 |
TSX: ELD NYSE: EGO | October 30, 2014 |
2014 Third Quarter Financial and Operating Results
2014 Guidance Maintained, AISC $735/oz for the Quarter
VANCOUVER, BC – Eldorado Gold Corporation, (“Eldorado” or “the Company”) today reported the Company's financial and operational results for the third quarter ended September 30, 2014. During the quarter, the Company generated $263.5 million in revenues from metal sales, and adjusted net earnings of $36.1 million ($0.05 per share). Cash flow from operating activities for the quarter totalled $92.2 million ($0.13 per share).
“The Company delivered another solid quarter with all of our mines performing to plan, notable progress at development projects, and advancement of our exploration targets. Combined with our strong operational performance, Eldorado continues to have a first-rate balance sheet and we closed the quarter with total liquidity of $937.3 million while continuing to grow our business.” said Paul Wright, Chief Executive Officer of Eldorado. “We are driving our development projects forward and I would like to highlight the significant progress made this quarter at Skouries. The mill foundations were completed and the SAG and ball mill installations are now underway. Eldorado continues to successfully position itself as a leading low-cost operator of high quality assets, boding well in today’s volatile markets.”
Third Quarter Financial and Operational Highlights
§ | Gold production of 192,578 ounces (including Olympias production from tailings retreatment). |
§ | Adjusted net earnings of $36.1 million($0.05 per share). Net profit attributable to shareholders of the Company was $19.8 million ($0.03 per share). |
§ | Gold revenues were $241.2 million on sales of 189,321 ounces of gold at an average realized gold price of $1,274 per ounce. |
§ | Liquidity of $937.3 million, including $562.3 million in cash, cash equivalents and term deposits, and $375.0 million in lines of credit. |
§ | All-in sustaining cash costsaveraged $735 per ounce;cash operating costs averaged$488 per ounce. |
§ | Significant developments at Skouries: completion of the mill foundations; installation of the SAG and ball mills underway; rate of underground decline advancement continues to improve and construction of the tailings dam is set to begin in the fourth quarter. |
§ | Feasibility Study at Certej commenced in order to optimize the expanded resource and improve the metallurgical design. |
§ | Furtherexploration success at the White Mountain and Jinfeng operations in China, as well as at the Piavitsa project in Halkidiki, Greece. |
§ | Appointment oftwo new members to the Board of Directors: Pamela Gibson and John Webster. |
1 |
Throughout this press release we use cash operating cost per ounce, total cash costs per ounce, all-in sustaining cost per ounce, gross profit from gold mining operations, adjusted net earnings and cash flow from operating activities before changes in non-cash working capital as additional measures of Company performance. These are non IFRS measures. Please see page 11 of the MD&A for an explanation and discussion of these non IFRS measures. All dollar amounts in US $, unless stated otherwise.
Financial Results
Summarized financial results | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Revenues (millions) | $263.5 | $287.3 | $808.9 | $892.3 |
Gold revenues (millions) | $241.2 | $266.4 | $736.4 | $817.2 |
Gold sold (ounces) | 189,321 | 199,117 | 570,570 | 564,723 |
Average realized gold price (US$ per ounce) | $1,274 | $1,338 | $1,291 | $1,447 |
Cash operating costs (US$ per ounce sold) | $488 | $472 | $499 | $485 |
Total cash cost (US$ per ounce sold) | $543 | $528 | $556 | $544 |
All-in sustaining cash cost (US$ per ounce sold) | $735 | n/a | $784 | n/a |
Gross profit from gold mining operations (millions) | $102.0 | $123.1 | $298.2 | $404.2 |
Adjusted net earnings (millions) | $36.1 | $54.4 | $109.2 | $186.0 |
Net profit (loss) attributable to shareholders of the Company (millions) | $19.8 | $36.4 | $88.7 | $34.2 |
Earnings (loss) per share attributable to shareholders of the Company – Basic (US$/share) | $0.03 | $0.05 | $0.12 | $0.05 |
Earnings (loss) per share attributable to shareholders of the Company – Diluted (US$/share) | $0.03 | $0.05 | $0.12 | $0.05 |
Dividends paid (Cdn$/share) | $0.01 | $0.05 | $0.02 | $0.12 |
Cash flow from operating activities before changes in non-cash working capital (millions) | $78.7 | $104.8 | $265.6 | $329.6 |
2 |
Financial Results
Net income attributable to shareholders of the Company for the quarter was $19.8 million (or $0.03 per share), compared with $36.4 million (or $0.05 per share) in the third quarter of 2013. Net income was impacted by a non-cash $7.6 million iron ore inventory write-down related to Vila Nova. Gold revenues of $241.2 million were nine percent lower year over year due to lower gold prices and ounces sold. Gross profit from gold mining operations was seventeen percent lower than that of the third quarter of 2013 reflecting lower profit margins and sales volumes. Total cash cost per ounce increased three percent year over year. Adjusted net earnings were $36.1 million or $0.05 per share compared with $54.4 million or $0.08 per share in the third quarter of 2013.
Exploration expenses fell $6.4 million year over year reflecting changes in the Company’s exploration program in response to lower gold prices. The Company reported a foreign exchange loss of $4.5 million for the quarter as compared to a gain of $0.9 million for the third quarter of 2013 mainly as a result of the impact on cash deposits of the weakening of the Canadian, Brazilian and Turkish currencies against the US dollar. Interest and financing costs fell $2.9 million year over year, reflecting an increase in capitalization of interest on the Company’s Greek development projects.
The effective tax rate for the quarter was sixty-four percent as compared to a rate of fifty percent in the third quarter of 2013. The increase in the effective tax rate year over year was due to the impact of the fall in the Turkish lira on the deferred tax balances of the Company’s Turkish entity as well as an increase in the percentage of unrecognized tax losses due to lower profits.
3 |
Operations Update
Summarized Operating Results | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Gross profit – gold mining operations (millions) | $102.0 | $123.1 | $298.2 | $404.2 |
Ounces produced – including Olympias production from tailings retreatment | 192,578 | 204,620 | 589,652 | 552,359 |
Cash operating costs ($ per ounce sold) | $488 | $472 | $499 | $485 |
Total cash cost ($ per ounce sold) | $543 | $528 | $556 | $544 |
Kisladag | ||||
Gross profit – gold mining operations (millions) | $62.9 | $79.5 | $163.1 | $242.1 |
Ounces produced | 78,030 | 84,762 | 222,085 | 231,718 |
Cash operating costs ($ per ounce sold) | $411 | $324 | $435 | $328 |
Total cash cost ($ per ounce sold) | $427 | $343 | $454 | $349 |
Efemcukuru | ||||
Gross profit – gold mining operations (millions) | $10.3 | $13.9 | $36.6 | $64.9 |
Ounces produced | 26,838 | 23,438 | 78,841 | 69,583 |
Cash operating costs ($ per ounce sold) | $547 | $551 | $541 | $558 |
Total cash cost ($ per ounce sold) | $564 | $568 | $562 | $586 |
Tanjianshan | ||||
Gross profit – gold mining operations (millions) | $12.7 | $15.3 | $39.7 | $49.6 |
Ounces produced | 25,387 | 28,179 | 79,556 | 82,324 |
Cash operating costs ($ per ounce sold) | $381 | $377 | $399 | $405 |
Total cash cost ($ per ounce sold) | $563 | $557 | $575 | $589 |
Jinfeng | ||||
Gross profit – gold mining operations (millions) | $12.4 | $9.9 | $41.7 | $26.9 |
Ounces produced | 39,421 | 40,212 | 126,284 | 90,843 |
Cash operating costs ($ per ounce sold) | $609 | $684 | $590 | $743 |
Total cash cost ($ per ounce sold) | $693 | $767 | $673 | $831 |
White Mountain | ||||
Gross profit – gold mining operations (millions) | $3.7 | $4.5 | $17.0 | $20.7 |
Ounces produced | 18,130 | 19,287 | 65,603 | 57,664 |
Cash operating costs ($ per ounce sold) | $648 | $713 | $611 | $693 |
Total cash cost ($ per ounce sold) | $691 | $751 | $651 | $734 |
Olympias | ||||
Ounces produced from tailings retreatment | 4,772 | 8,742 | 17,283 | 20,227 |
4 |
Kisladag
Operating Data | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Tonnes placed on pad | 3,829,444 | 3,336,465 | 10,814,170 | 9,553,306 |
Average treated head grade - grams per tonne (g/t) | 1.28 | 1.28 | 1.04 | 1.28 |
Gold (ounces) | ||||
- Produced | 78,030 | 84,762 | 222,085 | 231,718 |
- Sold | 82,374 | 85,029 | 222,041 | 231,959 |
Cash operating costs (per ounce sold) | $411 | $324 | $435 | $328 |
Total cash costs (per ounce sold) | $427 | $343 | $454 | $349 |
Financial Data (millions) | ||||
Gold revenues | $105.2 | $113.4 | $285.4 | $336.5 |
Depreciation and depletion | $6.8 | $4.1 | $19.5 | $10.9 |
Gross profit – gold mining operations | $62.9 | $79.5 | $163.1 | $242.1 |
Sustaining capital expenditures | $5.4 | $8.4 | $30.5 | $19.0 |
Gold production for the quarter at Kisladag was lower year over year due to lower average head grade of ore placed on the leach pad. Run of mine ore contributed to increased tonnes placed on the pad during the quarter. Cash costs were higher than in the same period in 2013 due to an increase in production waste mining (2014 – 6.4 million tonnes versus 2013 – 0.2 million tonnes). Capital expenditures during the quarter included waste stripping and leach pad construction.
Efemcukuru
Operating Data | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Tonnes Milled | 106,942 | 105,641 | 324,149 | 301,869 |
Average treated head grade - grams per tonne (g/t) | 9.08 | 8.50 | 8.54 | 8.77 |
Average Recovery Rate (to Concentrate) | 93.3% | 93.2% | 93.2% | 93.6% |
Gold (ounces) | ||||
- Produced | 26,838 | 23,438 | 78,841 | 69,583 |
- Sold | 24,033 | 26,410 | 77,115 | 101,888 |
Cash operating costs (per ounce sold) | $547 | $551 | $541 | $558 |
Total cash costs (per ounce sold) | $564 | $568 | $562 | $586 |
Financial Data (millions) | ||||
Gold revenues | $30.0 | $35.4 | $99.7 | $148.1 |
Depreciation and depletion | $5.8 | $5.9 | $18.9 | $20.9 |
Gross profit – gold mining operations | $10.3 | $13.9 | $36.6 | $64.9 |
Sustaining capital expenditures | $7.7 | $5.3 | $18.9 | $21.8 |
Gold production during the quarter at Efemcukuru was higher year over year due to higher mill throughput and average treated head grade. Sales during the quarter were lower year over year due to the timing of concentrate shipments. Cash operating costs per ounce were lower due to higher average treated head grade and continued cost reduction efforts. Capital spending during the quarter included costs related to capitalized underground development, mobile equipment, surface infrastructure, and process improvements.
5 |
Tanjianshan
Operating Data | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Tonnes Milled | 281,862 | 285,406 | 823,698 | 805,532 |
Average treated head grade - grams per tonne (g/t) | 3.50 | 3.40 | 3.41 | 3.54 |
Average Recovery Rate | 81.4% | 82.9% | 81.5% | 82.5% |
Gold (ounces) | ||||
- Produced | 25,387 | 28,179 | 79,556 | 82,324 |
- Sold | 25,387 | 28,179 | 79,556 | 82,324 |
Cash operating costs (per ounce sold) | $381 | $377 | $399 | $405 |
Total cash costs (per ounce sold) | $563 | $557 | $575 | $589 |
Financial Data (millions) | ||||
Gold revenues | $32.1 | $38.1 | $102.7 | $119.0 |
Depreciation and depletion | $4.9 | $6.7 | $16.7 | $20.0 |
Gross profit – gold mining operations | $12.7 | $15.3 | $39.7 | $49.6 |
Sustaining capital expenditures | $2.1 | $4.2 | $6.9 | $9.3 |
Gold production during the quarter at Tanjianshan was lower year over year as a result of lower tonnage throughput and lower recovery rate due to the treatment of stockpile material. Capital spending included resource evaluation activities and waste stripping.
Jinfeng
Operating Data | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Tonnes Milled | 353,048 | 363,798 | 1,090,006 | 1,052,406 |
Average treated head grade - grams per tonne (g/t) | 3.86 | 3.66 | 4.01 | 3.15 |
Average Recovery Rate | 87.1% | 88.0% | 87.1% | 85.0% |
Gold (ounces) | ||||
- Produced | 39,421 | 40,212 | 126,284 | 90,843 |
- Sold | 39,397 | 40,212 | 126,255 | 90,888 |
Cash operating costs (per ounce sold) | $609 | $684 | $590 | $743 |
Total cash costs (per ounce sold) | $693 | $767 | $673 | $831 |
Financial Data (millions) | ||||
Gold revenues | $50.7 | $53.8 | $163.7 | $129.7 |
Depreciation and depletion | $11.0 | $13.0 | $37.0 | $27.2 |
Gross profit – gold mining operations | $12.4 | $9.9 | $41.7 | $26.9 |
Sustaining capital expenditures | $0.9 | $15.0 | $8.0 | $44.3 |
Gold production during the quarter at Jinfeng was lower year over year due to an increase in gold in circuit inventory. Cash operating costs per ounce were lower mainly due to less waste tonnage from the open pit. Capital spending during the quarter included underground mine development and tailings dam construction.
6 |
White Mountain
Operating Data | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Tonnes Milled | 218,500 | 209,581 | 632,923 | 611,548 |
Average treated head grade - grams per tonne (g/t) | 2.79 | 3.28 | 3.48 | 3.44 |
Average Recovery Rate | 89.4% | 84.0% | 88.1% | 85.5% |
Gold (ounces) | ||||
- Produced | 18,130 | 19,287 | 65,603 | 57,664 |
- Sold | 18,130 | 19,287 | 65,603 | 57,664 |
Cash operating costs (per ounce sold) | $648 | $713 | $611 | $693 |
Total cash costs (per ounce sold) | $691 | $751 | $651 | $734 |
Financial Data (millions) | ||||
Gold revenues | $23.2 | $25.7 | $84.9 | $83.9 |
Depreciation and depletion | $6.9 | $6.7 | $25.0 | $20.6 |
Gross profit – gold mining operations | $3.7 | $4.5 | $17.0 | $20.7 |
Sustaining capital expenditures | $5.8 | $9.1 | $15.1 | $20.9 |
Gold production during the quarter at White Mountain was lower year over year mainly as a result of lower average treated head grade, partially offset by higher average recovery rates. Cash operating costs per ounce decreased year over year mainly due to reduced backfill costs. Capital spending this quarter included underground development, exploration and delineation, and camp improvements.
Vila Nova
Operating Data | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Tonnes Processed | 208,583 | 219,925 | 602,785 | 612,700 |
Iron Ore Produced | 180,152 | 189,858 | 517,951 | 528,456 |
Average Grade (% Fe) | 63.4% | 63.2% | 63.0% | 63.1% |
Iron Ore Tonnes | ||||
- Sold | 135,093 | 126,835 | 439,993 | 338,256 |
Average Realized Iron Ore Price | $46 | $74 | $65 | $98 |
Cash Costs (per tonne produced) | $60 | $58 | $62 | $65 |
Financial Data (millions) | ||||
Revenues | $6.3 | $9.4 | $28.8 | $33.3 |
Depreciation and depletion | $1.3 | $1.2 | $4.3 | $3.3 |
Gross profit / loss from mining operations | ($10.6) | $0.9 | ($10.2) | $8.1 |
Sustaining capital expenditures | $0 | $0.3 | $1.0 | $3.9 |
The Company recorded a $7.6 million inventory write-down against gross profit/loss for Vila Nova during the quarter as a result of the continued fall in iron ore prices. The Company has decided to place the mine on care and maintenance pending a review of options to return it to profitability. Not including the inventory write-down, Vila Nova recorded a loss of $3.0 million for the quarter compared with gross profit of $0.9 million in the third quarter of 2013.
7 |
Stratoni
Operating Data | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Tonnes ore mined (wet) | 60,006 | 60,011 | 174,523 | 174,245 |
Tonnes ore processed (dry) | 58,230 | 56,463 | 169,227 | 167,315 |
Pb grade (%) | 5.63% | 6.33% | 5.96% | 6.39% |
Zn grade (%) | 9.66% | 9.37% | 10.75% | 9.49% |
Ag grade (g/t) | 146 | 161 | 153 | 166 |
Tonnes of concentrate produced | 14,363 | 14,586 | 46,013 | 42,918 |
Tonnes of concentrate sold | 15,884 | 12,096 | 45,590 | 42,847 |
Average realized concentrate price (per tonne) | $960 | $820 | $885 | $840 |
Cash Costs (per tonne of concentrate sold) | $737 | $547 | $716 | $749 |
Financial Data (millions) | ||||
Revenues | $15.2 | $9.9 | $40.3 | $36.0 |
Depreciation and depletion | $2.3 | $2.2 | $6.3 | $7.5 |
Gross profit from mining operations | $1.3 | $1.1 | $1.5 | ($3.6) |
Sustaining capital expenditures | $1.2 | $1.4 | $2.7 | $2.0 |
Combined metal concentrate production at Stratoni for the quarter was the same year over year, with lower lead concentrate production offset by higher zinc concentrate production as a result of changes in metal head grades. Concentrate sales were higher year over year due to the timing of sales. Prices received for lead and zinc concentrates were both higher year on year.
Development Project Update
Kisladag Mine Expansion
During the third quarter work began at Kisladag on the engineering of an additional 7.5 million tonne per annum (Mtpa) crushing/screening circuit and its integration with the new gyratory crusher station. Work also began on the design of a new stockpile facility to provide feed to the existing crushing/screening circuit as well as the additional 7.5 Mtpa circuit. Total capacity for crushed ore will be raised to 20 Mtpa as per the expansion plan approved during the second quarter. Work continued during the quarter on upgrading the overland conveyor and stacking system that feeds the leach pad to handle the additional crushed throughput. Capital spending totaled $6.8 million during the quarter.
Skouries
The mill foundations at Skouries were completed during the quarter. These include the semi-autogenous grind (SAG) mill, ball mill, and the regrind mills. A key milestone of the project was also achieved, with the transportation to site, and start of installation, of the SAG and ball mill shells. Placement of the mills is scheduled to be completed during the fourth quarter. During the quarter the project received approval of the technical study for the construction of the first tailings dam which has allowed construction work to start in the fourth quarter. Piling also commenced in the flotation building area. During the quarter, pit preparation work continued with the removal of topsoil and overburden from the open pit. The pit work will increase during the fourth quarter as waste material is mined for construction of the tailings dam facility. The procurement process for the open pit mining contractor also began during the quarter with a site visit by potential bidders on the contract.
8 |
Progress continued on the underground decline with the advancement rate improving. Capital spending totaled $35.4 million during the quarter.
Olympias
A total of 137,566 tonnes of tailings were reprocessed during the quarter at a grade of 2.69 grams per tonne and a total of 4,772 payable ounces of gold in concentrate were produced. Cash proceeds from the sale of concentrate generated $6.5 million during the quarter on 5,393 ounces of gold in concentrate. Capital spending totalled $27.9 million during the quarter including: $8.4 million related to tailings reprocessing, production royalties and transportation and selling costs; $2.2 million related to capitalized interest; and the remainder on mine development as well as Phase II engineering.
Plans for transitioning the plant operation from Phase l tailings retreatment to Phase II processing of underground ore continued to be studied during the quarter. The plans are based on upgrading the existing plant facilities to handle a throughput of up to 650,000 tonnes per year of ore to produce gold, lead/silver and zinc concentrates.
Perama Hill
Preliminary engineering was complete with the final front end engineering design report received during the quarter. The Company continues to work with Greek government authorities to facilitate approval of the environmental impact assessment (EIA). Capital spending totaled $1.6 million during the quarter.
Certej
During the quarter the feasibility study commenced in order to optimize the expanded resource and improve the metallurgical design. Construction permits were obtained for the 2014 site works program allowing mobilization of the site earthworks contractor to begin rough grading of the south plant site and construction of the pilot water treatment plant. Capital spending totaled $3.6 million during the quarter.
Tocantinzinho
During the quarter work continued on optimization of the Tocantinzinho feasibility study. Following a review of the geological model, which updated the overall tonnes and grade in the deposit, a rework of the mine design and plant throughput has been incorporated into the ongoing optimization analysis. Construction on a portion of the recently approved forest road began, which will allow 4x4 access in the dry season. Capital spending totaled $1.2 million during the quarter.
Eastern Dragon
The Eastern Dragon site continued under care and maintenance during the quarter with permitting activities ongoing. The Company was informed that the approval process for the project EIA is to be conducted by the Heilongjiang Provincial Environment Protection Bureau, an interim step to approval of the Project Permit Approval (PPA) by the National Development and Reform Commission (NDRC). Site personnel continued to provide support to the permitting team, particularly at the local and provincial level.
9 |
Exploration Update
During the third quarter, a total of 19,000 metres of exploration drilling were completed at the Company’s mine sites, development projects, and exploration projects.
Greece
In the Halkidiki District, a 6,000 metre drilling program continued during the quarter at the Piavitsa deposit, which is located 2 kilometres west of the Stratoni project. This program consists largely of infill drillholes, designed to confirm the continuity of mineralization delineated in widely-spaced drillholes drilled during 2012 and 2013. Results to date showed grades and thicknesses in general agreement with the resource model.
At the Stratoni mine, step-out drilling targeted the western and down-dip extensions of the orebody. The best results were obtained from just below the current production levels where thick massive sulfide intercepts indicate down-dip continuity of the orebody.
In the Perama and Sapes district, exploration activities during the quarter focused on updating the geological model for the Sapes deposit for the purposes of refining the resource model and identifying exploration drilling targets.
Romania
In the Certej project area, exploration drilling during the quarter tested satellite targets at Magura and Bocsa, both of which were sites of historical underground exploration. No significant results were obtained from the first three drillholes on these targets. These prospects will be further tested during the fourth quarter, upon receipt of required drilling permits.
At Muncel, located 15 kilometres southwest of Certej, the final three drillholes of the first phase of exploration drilling were completed. One of these drillholes was abandoned after intersecting underground workings, while the other two cut zones of sulfide stringer veinlets.
The Certej deposit is currently the subject of a detailed geological reinterpretation program, which will be completed in the fourth quarter with updated deposit geology and resource models.
Turkey
Exploration drilling during the quarter in Turkey was limited to the Efemcukuru project, where 2,900 metres of drilling tested the Dedebag vein system and segments of the Kokarpinar vein. The best results were obtained from the central and northern portions of the Kokarpinar vein, where sulfide-rich rhodochrosite vein intercepts of several metres in width were obtained.
Reconnaissance exploration activities included mapping and sampling of volcanic centres in the greater Kisladag region to evaluate potential for buried porphyry systems, and evaluations of regional prospects in the northern part of the country.
China
At Tanjianshan, drilling programs were completed at the Dushugou prospect and at the Qinlongtan (QLT) deposit. At QLT, drilling confirmed the continuity of the QLT Northwest zone in the previously untested gap between the 2013 drillholes and the QLT open pit.
Exploration drilling at the White Mountain mine (4,700 metres completed) tested step-outs along-strike and down-plunge from the ore body. Mining grades and thicknesses were confirmed in five separate areas, with highest grades encountered in the North and North Deep ore zones. Surface drilling of the North Deep zone also commenced during the quarter.
10 |
Brazil
Exploration drilling during the quarter in Brazil tested two projects in the Tapajos region. At the Ruben Zilio project, located along strike southeast of Tocantinzinho, soil geochemical anomalies were tested in three target areas; none of this drilling identified significant mineralization. At Tocantinzinho, additional sampling extended the Cu-Mo-Au mineralization over a 6 km trend. Four drillholes tested different areas of this anomaly, and all encountered intervals of quartz and sulfide vein mineralization.
Board of Directors Update
The Board of Directors is pleased to announce that it has appointed two new directors following a search process conducted by the Corporate Governance and Nominating Committee of the Board. Joining the board are Pamela Gibson and John Webster.
Pamela Gibson was appointed to the Board of Directors on September 2, 2014. Ms. Gibson has over 30 years of experience, primarily as a corporate lawyer at Shearman & Sterling LLP, advising companies on capital market transactions, governance, disclosure, compliance and other corporate strategic matters. Ms. Gibson has extensive industry experience in the metals and mining, oil and gas, energy, telecom and technology sectors. Ms. Gibson was the Managing Partner of both the Toronto office (1990 to 1995) and London office (1995 to 2002), head of the Europe and Asia Capital Markets Group (2002 to 2004), and is currently Of Counsel at Shearman & Sterling LLP. Ms. Gibson also serves on the Board of Directors of NYSE listed GasLog Partners LP. Ms. Gibson holds a Bachelor of Arts degree, with distinction, from York University, a Bachelor of Laws degree from Osgoode Hall Law School and a Master of Laws degree from New York University. Ms. Gibson was also a law clerk to the Honorable Justice Howland, Chief Justice of the Ontario Court of Appeal.
Effective January 1, 2015, John Webster will join the Company’s Board of Directors. Mr. Webster holds a BA (Hons) Degree in Economic and Social History from the University of Kent. Mr. Webster is a Member of the Institute of Chartered Accountants in England and Wales, a Member of the Institute of Chartered Accountants of British Columbia (1983) and a Fellow (2002), a CPA in Colorado (2005) and a Member of the Romanian Chamber of Auditors (CAFR) (2012). Upon graduation, Mr. Webster qualified as a Member of the Institute of Chartered Accountants in England and joined Thornton Baker and subsequently joined Price Waterhouse Coopers LLP, (PWC) Canada. Mr. Webster was a Partner at PWC and most recently Partner and Assurance Leader for Romania and South Eastern Europe at PWC Romania until his retirement in June 2014. He has extensive experience in the Mining and Technology sectors and has worked with both venture capital and listed companies.
Corporate Update
Further to the announcement in the second quarter, the Company has elected to retain Bank of America Merrill Lynch as its sponsor for a proposed Hong Kong Stock Exchange listing of its Chinese business units. Eldorado is the largest foreign producer of gold in China, with three operating gold mines (Jinfeng, Tanjianshan and White Mountain) and the Eastern Dragon project. The Company’s Chinese operations presently produce approximately 300,000 ounces of gold annually.
11 |
Conference Call
Eldorado will host a conference call onFriday, October 31, 2014 to discuss the Third Quarter 2014 Financial and Operating Results at8:30am PDT (11:30am EDT). You may participate in the conference call by dialling416-340-8527 in Toronto or1-800-446-4472toll free in North America and asking for the Eldorado Conference Call.
The call will be available on Eldorado’s website: www.eldoradogold.com. A replay of the call will be available until November 7, 2014 by dialling 905-694-9451 in Toronto or 1-800-408-3053 toll free in North America and entering the Passcode: 771 2109.
About Eldorado Gold
Eldorado is a leading low cost gold producer with mining, development and exploration operations in Turkey, China, Greece, Romania and Brazil. The Company’s success to date is based on a low cost strategy, a highly skilled and dedicated workforce, safe and responsible operations, and long-term partnerships with the communities where it operates. Eldorado’s common shares trade on the Toronto Stock Exchange (TSX: ELD) and the New York Stock Exchange (NYSE: EGO).
Certain of the statements made herein may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Often, but not always, forward-looking statements and forward-looking information can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negatives thereof or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements or information herein include, but are not limited, to statements or information with respect to the Company’s 2014 Third Quarter Financial and Operating Results.
Forward-looking statements and forward-looking information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. We have made certain assumptions about the forward-looking statements and information, including assumptions about the legal restrictions regarding the payment of dividends by the Company; assumptions about the price of gold; anticipated costs and expenditures; estimated production, mineral reserves and metallurgical recoveries; financial position, reserves and resources and gold production;and the ability to achieve our goals. Although our management believes that the assumptions made and the expectations represented by such statements or information are reasonable, there can be no assurance that the forward-looking statements or information will prove to be accurate. Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements or information. These risks, uncertainties and other factors include, among others, the following: gold price volatility; risks of not meeting production and cost targets; discrepancies between actual and estimated production, mineral reserves and resources and metallurgical recoveries; mining operational and development risk; litigation risks; regulatory restrictions, including environmental regulatory restrictions and liability; risks of sovereign investment and operating in foreign countries; currency fluctuations; speculative nature of gold exploration; global economic climate; dilution; share price volatility; competition; loss of key employees; additional funding requirements; and defective title to mineral claims or property, as well as those factors discussed in the sections entitled “Forward-Looking Statements” and "Risk Factors" in the Company's Annual Information Form & Form 40-F dated March 28, 2014
There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, you should not place undue reliance on the forward-looking statements or information contained herein. Except as required by law, we do not expect to update forward-looking statements and information continually as conditions change and you are referred to the full discussion of the Company's business contained in the Company's reports filed with the securities regulatory authorities in Canada and the U.S.
Contact
Krista Muhr, Vice President Investor Relations
Eldorado Gold Corporation
604.601.6701 or 1.888.353.8166
kristam@eldoradogold.com
12 |
ELDORADO GOLD
Q3 2014 Gold Production Highlights (in US$)
First Quarter 2014 | Second Quarter 2014 | Third Quarter 2014 | Third Quarter 2013 | First Nine Months 2014 | First Nine Months 2013 | |
Gold Production | ||||||
Ounces Sold | 190,628 | 190,621 | 189,321 | 199,117 | 570,570 | 564,723 |
Ounces Produced1 | 196,523 | 200,551 | 192,578 | 204,620 | 589,652 | 552,359 |
Cash Operating Cost ($/oz)2,4 | 519 | 489 | 488 | 472 | 499 | 485 |
Total Cash Cost ($/oz)3,4 | 577 | 549 | 543 | 528 | 556 | 544 |
Realized Price ($/oz - sold) | 1,299 | 1,299 | 1,274 | 1,338 | 1,291 | 1,447 |
Kişladağ Mine, Turkey | ||||||
Ounces Sold | 66,852 | 72,815 | 82,374 | 85,029 | 222,041 | 231,959 |
Ounces Produced | 67,075 | 76,980 | 78,030 | 84,762 | 222,085 | 231,718 |
Tonnes to Pad | 3,856,882 | 3,127,844 | 3,829,444 | 3,336,465 | 10,814,170 | 9,553,306 |
Grade (grams / tonne) | 0.73 | 1.11 | 1.28 | 1.28 | 1.04 | 1.28 |
Cash Operating Cost ($/oz)4 | 456 | 443 | 411 | 324 | 435 | 328 |
Total Cash Cost ($/oz)3,4 | 473 | 466 | 427 | 343 | 454 | 349 |
Efemcukuru Mine, Turkey | ||||||
Ounces Sold | 27,647 | 25,435 | 24,033 | 26,410 | 77,115 | 101,888 |
Ounces Produced | 26,969 | 25,034 | 26,838 | 23,438 | 78,841 | 69,583 |
Tonnes Milled | 106,501 | 110,706 | 106,942 | 105,641 | 324,149 | 301,869 |
Grade (grams / tonne) | 8.56 | 7.99 | 9.08 | 8.50 | 8.54 | 8.77 |
Cash Operating Cost ($/oz)4 | 526 | 552 | 547 | 551 | 541 | 558 |
Total Cash Cost ($/oz)3,4 | 547 | 576 | 564 | 568 | 562 | 586 |
Tanjianshan Mine, China | ||||||
Ounces Sold | 28,379 | 25,790 | 25,387 | 28,179 | 79,556 | 82,324 |
Ounces Produced | 28,379 | 25,790 | 25,387 | 28,179 | 79,556 | 82,324 |
Tonnes Milled | 263,609 | 278,227 | 281,863 | 285,406 | 823,699 | 805,532 |
Grade (grams / tonne) | 3.44 | 3.30 | 3.51 | 3.40 | 3.42 | 3.54 |
Cash Operating Cost ($/oz)4 | 422 | 391 | 381 | 377 | 399 | 405 |
Total Cash Cost ($/oz)3,4 | 592 | 570 | 563 | 557 | 575 | 589 |
Jinfeng Mine, China | ||||||
Ounces Sold | 41,277 | 45,581 | 39,397 | 40,212 | 126,255 | 90,888 |
Ounces Produced | 41,295 | 45,568 | 39,421 | 40,212 | 126,284 | 90,843 |
Tonnes Milled | 364,987 | 371,971 | 353,048 | 363,798 | 1,090,006 | 1,052,406 |
Grade (grams / tonne) | 4.00 | 4.17 | 3.86 | 3.66 | 4.01 | 3.14 |
Cash Operating Cost ($/oz) 4 | 626 | 540 | 609 | 684 | 590 | 743 |
Total Cash Cost ($/oz) 3,4 | 709 | 622 | 693 | 767 | 673 | 831 |
White Mountain Mine, China | ||||||
Ounces Sold | 26,473 | 21,000 | 18,130 | 19,287 | 65,603 | 57,664 |
Ounces Produced | 26,473 | 21,000 | 18,130 | 19,287 | 65,603 | 57,664 |
Tonnes Milled | 200,682 | 213,741 | 218,500 | 209,581 | 632,923 | 611,548 |
Grade (grams / tonne) | 4.13 | 3.56 | 2.79 | 3.28 | 3.48 | 3.44 |
Cash Operating Cost ($/oz) 4 | 607 | 583 | 648 | 713 | 611 | 693 |
Total Cash Cost ($/oz) 3,4 | 646 | 623 | 691 | 751 | 651 | 734 |
Olympias, Greece | ||||||
Ounces Sold | - | - | - | - | - | - |
Ounces Produced1 | 6,332 | 6,179 | 4,772 | 8,742 | 17,283 | 20,227 |
Tonnes Milled | 144,522 | 168,013 | 137,566 | 185,012 | 450,101 | 391,096 |
Grade (grams / tonne) | 3.08 | 2.84 | 2.74 | 3.19 | 2.89 | 3.55 |
Cash Operating Cost ($/oz)4 | - | - | - | - | - | - |
Total Cash Cost ($/oz)3,4 | - | - | - | - | - | - |
1 | Ounces produced include production from tailings retreatment in Olympias. |
2 | Cost figures calculated in accordance with the Gold Institute Standard. |
3 | Cash operating costs, plus royalties and the cost of off-site administration. |
4 | Cash operating costs and total cash costs are non-IFRS measures. Please see our MD&A for an explanation and discussion of these. |
13 |
Eldorado Gold Corporation
Unaudited Condensed Consolidated Balance Sheets
(Expressed in thousands of U.S. dollars)
Note | September 30, 2014 | December 31, 2013 | ||||
$ | $ | |||||
ASSETS | ||||||
Current assets | ||||||
Cash and cash equivalents | 539,489 | 589,180 | ||||
Term deposits | 22,800 | 34,702 | ||||
Restricted cash | 262 | 262 | ||||
Marketable securities | 4,520 | 4,387 | ||||
Accounts receivable and other | 81,035 | 89,231 | ||||
Inventories | 224,769 | 244,042 | ||||
872,875 | 961,804 | |||||
Investment in associate | - | 10,949 | ||||
Deferred income tax assets | 530 | 997 | ||||
Other assets | 61,398 | 37,330 | ||||
Defined benefit pension plan | 14,270 | 13,484 | ||||
Property, plant and equipment | 5,872,154 | 5,684,382 | ||||
Goodwill | 526,296 | 526,296 | ||||
7,347,523 | 7,235,242 | |||||
LIABILITIES & EQUITY | ||||||
Current liabilities | ||||||
Accounts payable and accrued liabilities | 185,013 | 211,406 | ||||
Current debt | 5 | 8,127 | 16,402 | |||
193,140 | 227,808 | |||||
Debt | 5 | 586,652 | 585,006 | |||
Other non-current liability | 4(b) | 48,452 | - | |||
Asset retirement obligations | 87,004 | 85,259 | ||||
Deferred income tax liabilities | 864,019 | 842,305 | ||||
1,779,267 | 1,740,378 | |||||
Equity | ||||||
Share capital | 6 | 5,315,352 | 5,314,589 | |||
Treasury stock | (13,480) | (10,953) | ||||
Contributed surplus | 38,380 | 78,557 | ||||
Accumulated other comprehensive loss | (16,995) | (17,056) | ||||
Deficit | (67,720) | (143,401) | ||||
Total equity attributable to shareholders of the Company | 5,255,537 | 5,221,736 | ||||
Attributable to non-controlling interests | 312,719 | 273,128 | ||||
5,568,256 | 5,494,864 | |||||
7,347,523 | 7,235,242 | |||||
Approved on behalf of the Board of Directors
(Signed)Robert R. Gilmore Director
(Signed)Paul N. Wright Director
The accompanying notes are an integral part of these consolidated financial statements.
14 |
Eldorado Gold Corporation
Unaudited Condensed Consolidated Income Statements
(Expressed in thousands of U.S. dollars)
Three months ended | Nine months ended | |||||||||
September 30, | September 30, | |||||||||
2014 | 2013 | 2014 | 2013 | |||||||
$ | $ | $ | $ | |||||||
Revenue | ||||||||||
Metal sales | 263,510 | 287,254 | 808,877 | 892,251 | ||||||
Cost of sales | ||||||||||
Production costs | 123,503 | 120,753 | 380,812 | 367,254 | ||||||
Inventory write-down | 7,577 | - | 7,577 | - | ||||||
Depreciation and amortization | 39,341 | 40,461 | 129,008 | 112,809 | ||||||
170,421 | 161,214 | 517,397 | 480,063 | |||||||
Gross profit | 93,089 | 126,040 | 291,480 | 412,188 | ||||||
Exploration expenses | 3,488 | 9,866 | 11,273 | 27,730 | ||||||
General and administrative expenses | 17,430 | 14,671 | 52,373 | 49,396 | ||||||
Defined benefit pension plan expense | 407 | 616 | 1,223 | 1,864 | ||||||
Share based payments | 3,253 | 3,765 | 15,528 | 15,933 | ||||||
Foreign exchange loss (gain) | 4,468 | (939) | 1,554 | 4,879 | ||||||
Operating profit | 64,043 | 98,061 | 209,529 | 312,386 | ||||||
Loss (gain) on disposal of assets | 278 | (120) | 2,103 | (135) | ||||||
Loss (gain) on marketable securities and other investments | 122 | - | 1,444 | (21) | ||||||
Loss on investments in associates | - | 1,426 | 102 | 2,549 | ||||||
Impairment loss on investment in associates | - | 12,707 | - | 12,707 | ||||||
Other income | (4,206) | (2,460) | (7,053) | (7,574) | ||||||
Asset retirement obligation accretion | 582 | 278 | 1,745 | 1,003 | ||||||
Interest and financing costs | 6,832 | 9,748 | 23,153 | 31,310 | ||||||
Profit before income tax | 60,435 | 76,482 | 188,035 | 272,547 | ||||||
Income tax expense | 38,900 | 38,152 | 96,343 | 233,954 | ||||||
Profit for the period | 21,535 | 38,330 | 91,692 | 38,593 | ||||||
Attributable to: | ||||||||||
Shareholders of the Company | 19,791 | 36,410 | 88,691 | 34,221 | ||||||
Non-controlling interests | 1,744 | 1,920 | 3,001 | 4,372 | ||||||
Profit for the period | 21,535 | 38,330 | 91,692 | 38,593 | ||||||
Weighted average number of shares outstanding | ||||||||||
Basic | 716,284 | 715,038 | 716,254 | 714,901 | ||||||
Diluted | 716,284 | 715,364 | 716,254 | 715,229 | ||||||
Earnings per share attributable to shareholders of the Company: | ||||||||||
Basic earnings per share | 0.03 | 0.05 | 0.12 | 0.05 | ||||||
Diluted earnings per share | 0.03 | 0.05 | 0.12 | 0.05 | ||||||
The accompanying notes are an integral part of these consolidated financial statements.
15 |
Eldorado Gold Corporation
Unaudited Condensed Consolidated Statements of Comprehensive Income
(Expressed in thousands of U.S. dollars except per share amounts)
Three months ended | Nine months ended | |||||
September 30, | September 30, | |||||
2014 | 2013 | 2014 | 2013 | |||
$ | $ | $ | $ | |||
Profit for the period | 21,535 | 38,330 | 91,692 | 38,593 | ||
Other comprehensive gain (loss): | ||||||
Change in fair value of available-for-sale financial assets | (687) | (321) | (840) | (1,721) | ||
Realized gains on disposal of available-for-sale financial assets | 142 | - | 901 | (17) | ||
Total other comprehensive gain (loss) for the period | (545) | (321) | 61 | (1,738) | ||
Total comprehensive income for the period | 20,990 | 38,009 | 91,753 | 36,855 | ||
Attributable to: | ||||||
Shareholders of the Company | 19,246 | 36,089 | 88,752 | 32,483 | ||
Non-controlling interests | 1,744 | 1,920 | 3,001 | 4,372 | ||
20,990 | 38,009 | 91,753 | 36,855 | |||
The accompanying notes are an integral part of these consolidated financial statements.
16 |
Eldorado Gold Corporation
Unaudited Condensed Consolidated Statements of Cash Flows
(Expressed in thousands of U.S. dollars)
Three months ended | Nine months ended | ||||||
September 30, | September 30, | ||||||
Note | 2014 | 2013 | 2014 | 2013 | |||
$ | $ | $ | $ | ||||
Cash flows generated from (used in): | |||||||
Operating activities | |||||||
Profit for the period | 21,535 | 38,330 | 91,692 | 38,593 | |||
Items not affecting cash: | |||||||
Asset retirement obligation accretion | 582 | 278 | 1,745 | 1,003 | |||
Depreciation and amortization | 39,341 | 40,461 | 129,008 | 112,809 | |||
Unrealized foreign exchange loss (gain) | 708 | (44) | 584 | 480 | |||
Deferred income tax expense | 12,516 | 7,388 | 22,183 | 143,836 | |||
Loss (gain) on disposal of assets | 278 | (120) | 2,103 | (135) | |||
Loss on investments in associates | - | 1,426 | 102 | 2,549 | |||
Impairment loss on investment in associates | - | 12,707 | - | 12,707 | |||
Loss (gain) on marketable securities and other investments | 122 | - | 1,444 | (21) | |||
Share based payments | 3,253 | 3,765 | 15,528 | 15,933 | |||
Defined benefit pension plan expense | 407 | 616 | 1,223 | 1,864 | |||
78,742 | 104,807 | 265,612 | 329,618 | ||||
Changes in non-cash working capital | 9 | 13,447 | 15,454 | (41,153) | (20,811) | ||
92,189 | 120,261 | 224,459 | 308,807 | ||||
Investing activities | |||||||
Net cash used on acquisition of subsidiary | 4(a) | - | - | (30,318) | - | ||
Purchase of property, plant and equipment | (102,758) | (119,055) | (291,105) | (336,818) | |||
Proceeds from the sale of property, plant and equipment | (36) | 412 | 140 | 604 | |||
Proceeds on production from tailings retreatment | 6,539 | 9,438 | 27,096 | 24,666 | |||
Purchase of marketable securities | (818) | - | (1,670) | - | |||
Proceeds from the sale of marketable securities | 269 | - | 1,134 | 332 | |||
Investments in associates | - | - | - | (6,357) | |||
Redemption of (investment in) term deposits | 2,226 | 161,841 | 11,902 | (59,600) | |||
Increase (decrease) in restricted cash | 11 | (17) | 13 | (12) | |||
(94,567) | 52,619 | (282,808) | (377,185) | ||||
Financing activities | |||||||
Issuance of common shares for cash | 438 | 1,945 | 438 | 3,546 | |||
Investment by non-controlling interest | 4(b) | - | - | 40,000 | - | ||
Dividend paid to shareholders | (6,546) | (34,708) | (13,010) | (84,949) | |||
Dividends paid to non-controlling interest | (3,410) | - | (4,225) | - | |||
Purchase of treasury stock | - | - | (6,413) | (6,462) | |||
Long-term and bank debt proceeds | 8,127 | 3,565 | 24,490 | 15,977 | |||
Long-term and bank debt repayments | (16,240) | - | (32,622) | (10,354) | |||
Loan financing costs | - | - | - | (383) | |||
(17,631) | (29,198) | 8,658 | (82,625) | ||||
Net increase (decrease) in cash and cash equivalents | (20,009) | 143,682 | (49,691) | (151,003) | |||
Cash and cash equivalents - beginning of period | 559,498 | 522,158 | 589,180 | 816,843 | |||
Cash and cash equivalents - end of period | 539,489 | 665,840 | 539,489 | 665,840 | |||
The accompanying notes are an integral part of these consolidated financial statements.
17 |
Eldorado Gold Corporation
Unaudited Condensed Consolidated Statements of Changes in Equity
(Expressed in thousands of U.S. dollars)
Three months ended | Nine months ended | |||||
September 30, | September 30, | |||||
Note | 2014 | 2013 | 2014 | 2013 | ||
$ | $ | $ | $ | |||
Share capital | ||||||
Balance beginning of period | 5,314,813 | 5,306,947 | 5,314,589 | 5,300,957 | ||
Shares issued upon exercise of share options, for cash | 438 | 1,945 | 438 | 3,546 | ||
Transfer of contributed surplus on exercise of options | 101 | 694 | 101 | 1,683 | ||
Transfer of contributed surplus on exercise of deferred | ||||||
phantom units | - | 184 | 224 | 3,584 | ||
Balance end of period | 5,315,352 | 5,309,770 | 5,315,352 | 5,309,770 | ||
Treasury stock | ||||||
Balance beginning of period | (14,845) | (11,775) | (10,953) | (7,445) | ||
Purchase of treasury stock | - | - | (6,413) | (6,462) | ||
Shares redeemed upon exercise of restricted share units | 1,365 | 691 | 3,886 | 2,823 | ||
Balance end of period | (13,480) | (11,084) | (13,480) | (11,084) | ||
Contributed surplus | ||||||
Balance beginning of period | 37,197 | 71,389 | 78,557 | 65,382 | ||
Share based payments | 3,390 | 3,685 | 15,140 | 16,213 | ||
Shares redeemed upon exercise of restricted share units | (1,365) | (691) | (3,886) | (2,823) | ||
Recognition of other non-current liability and related costs | 4(b) | (741) | - | (51,106) | - | |
Partial reversal of non-controlling interest acquired on buy-out | - | 2,911 | - | 2,911 | ||
Transfer to share capital on exercise of options and deferred | ||||||
phantom units | (101) | (878) | (325) | (5,267) | ||
Balance end of period | 38,380 | 76,416 | 38,380 | 76,416 | ||
Accumulated other comprehensive loss | ||||||
Balance beginning of period | (16,450) | (25,952) | (17,056) | (24,535) | ||
Other comprehensive gain (loss) for the period | (545) | (321) | 61 | (1,738) | ||
Balance end of period | (16,995) | (26,273) | (16,995) | (26,273) | ||
Retained earnings (deficit) | ||||||
Balance beginning of period | (80,965) | 542,446 | (143,401) | 594,876 | ||
Dividends paid | (6,546) | (34,708) | (13,010) | (84,949) | ||
Profit attributable to shareholders of the Company | 19,791 | 36,410 | 88,691 | 34,221 | ||
Balance end of period | (67,720) | 544,148 | (67,720) | 544,148 | ||
Total equity attributable to shareholders of the Company | 5,255,537 | 5,892,977 | 5,255,537 | 5,892,977 | ||
Non-controlling interests | ||||||
Balance beginning of period | 310,975 | 286,302 | 273,128 | 284,100 | ||
Profit attributable to non-controlling interests | 1,744 | 1,920 | 3,001 | 4,372 | ||
Dividends declared to non-controlling interests | - | (7,584) | (3,410) | (7,584) | ||
Increase (decrease) during the period | 4(b) | - | (3,161) | 40,000 | (3,411) | |
Balance end of period | 312,719 | 277,477 | 312,719 | 277,477 | ||
Total equity | 5,568,256 | 6,170,454 | 5,568,256 | 6,170,454 | ||
The accompanying notes are an integral part of these consolidated financial statements.
18 |
Eldorado Gold Corporation
Notes to the unaudited condensed consolidated financial statements
(Expressed in thousands of U.S. dollars, unless otherwise stated)
1. | General Information |
Eldorado Gold Corporation (“Eldorado” or the “Company”) is a gold exploration, development, mining and production company. The Company has operations and ongoing exploration and development projects in Turkey, China, Greece, Brazil and Romania. The Company acquired Glory Resources Ltd (“Glory”) in March 2014. Glory has the Sapes project in Thrace, Greece.
Eldorado is a public company which is listed on the Toronto Stock Exchange and New York Stock Exchange and is incorporated and domiciled in Canada.
2. | Basis of preparation |
a) | Statement of compliance |
These unaudited condensed consolidated interim financial statements have been prepared in accordance with International Accounting Standard 34 ‘Interim Financial Reporting’. They do not include all of the information and footnotes required by the International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board for full annual financial statements and should be read in conjunction with the Company’s annual financial statements for the year ended December 31, 2013.
The same accounting policies are used in the preparation of these unaudited condensed consolidated interim financial statements as for the most recent audited annual financial statements and reflect all the adjustments necessary for fair presentation in accordance with IFRS for the interim periods presented.
b) | Judgement and estimates |
The preparation of these unaudited condensed consolidated interim financial statements in conformity with IFRS requires management to make judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets and liabilities, income and expense. Actual results may differ from these estimates.
The significant judgements made by management in applying the Company’s accounting policies and the key sources of estimation uncertainty were the same as those that applied to the consolidated financial statements as at and for the year ended 31 December 2013.
3. | Adoption of new accounting standards |
The following interpretation of a standard has been adopted by the Company commencing January 1, 2014:
· | IFRIC 21 ‘Levies’ – This interpretation of IAS 37, ‘Provisions, Contingent Liabilities and Contingent Assets’,applies to the accounting for levies imposed by governments. IAS 37 sets out criteria for the recognition of a liability, one of which is the requirement for the entity to have a present obligation as a result of a past event (“obligating event”). IFRIC 21 clarifies that the obligating event that gives rise to a liability to pay a levy is the activity described in the relevant legislation that triggers the payment of the levy. There was no impact on these unaudited condensed consolidated interim financial statements as a result of the adoption of this standard. |
The following standards have been published and are mandatory for Eldorado’s annual accounting periods no earlier than January 1, 2017:
· | IFRS 9‘Financial Instruments’– This standard was published in July 2014 and replaces the existing guidance in IAS 39, ‘Financial Instruments: Recognition and Measurement’. IFRS 9 includes revised guidance on the classification and measurement of financial instruments, including a new expected credit loss model for calculating impairment on financial assets, and the new general hedge accounting requirements. It also carries forward the guidance on recognition and derecognition of financial instruments from IAS 39. IFRS 9 is effective for annual reporting periods beginning on or after January 1, 2018, with early adoption permitted. The Company is currently evaluating the extent of the impact of the adoption of this standard. |
( 1 ) |
Eldorado Gold Corporation
Notes to the unaudited condensed consolidated financial statements
(Expressed in thousands of U.S. dollars, unless otherwise stated)
3. | Adoption of new accounting standards(continued) |
· | IFRS 15‘Revenue from Contracts with Customers’– This standard contains a single model that applies to contracts with customers and two approaches to recognising revenue: at a point in time or over time. The model features a contract-based five-step analysis of transactions to determine whether, how much and when revenue is recognized. New estimates and judgmental thresholds have been introduced, which may affect the amount and/or timing of revenue recognized. This standard is effective for fiscal years ending on or after December 31, 2017, with early adoption permitted. The Company does not expect this standard to have a material impact on its financial statements. |
4. | Acquisitions and other transactions |
a) | Acquisition of Glory |
Eldorado completed the acquisition of all of the issued and outstanding common shares of Glory that it did not already own on March 14, 2014. As a result, Eldorado acquired a 100% interest in the Sapes project in Thrace, Greece. Prior to the transaction, Eldorado owned 19.9% interest in Glory and the investment was accounted for as an investment in associate.
Total consideration of $39,219 included cash for 179,504,179 shares in the amount of $27,583, an option buy-out payment of $1,590 to holders of Glory options, and $10,046 related to the 44,595,920 shares of Glory that Eldorado had purchased prior to the off-market takeover bid. A total of $1,229 was incurred as transaction costs and was capitalized as property, plant and equipment.
This transaction has been accounted for as an acquisition of assets and liabilities as Glory did not constitute a business, as defined in IFRS 3. Other than a small working capital amount the remainder of the value for this transaction was assigned to property, plant and equipment.
Eldorado paid net cash of $30,318 as a result of the transaction. This net reduction of cash was a result of an acquired cash balance of $84 less cash consideration of $29,173 and transaction costs of $1,229.
b) | Eastern Dragon agreement |
In March 2014, the Company, through one of its subsidiaries, entered into a Subscription and a Shareholders agreement (“Agreements”) with a third party (“Third Party”).
As a result of these Agreements, Third Party acquired 21.5% of the total ordinary shares of Sino Gold Tenya (HK) Limited (“Tenya”), a subsidiary of the Company, and indirectly a 20% interest in the Eastern Dragon Project.
Under the terms of the Agreements, Third Party has the right to require Eldorado to purchase or procure the purchase by another party of Third Party’s shares in Tenya at a fixed price (“Put Option”) for 90 days following the second anniversary of the Agreements.
The Agreements include other rights and obligations of the Company and Third Party associated with the advancement of the Eastern Dragon Project.
This transaction has been accounted as an equity transaction with the recognition of a non-controlling interest in the amount of $40,000 representing the consideration received. A liability in the amount of $46,970 has been recorded at the transaction date, representing the present value of the redemption amount of the Put Option and $2,654 of transaction costs were recorded against equity. Future changes in the present value of the redemption amount of the Put Option are being charged against equity. The present value of the liability representing the Put Option as of September 30, 2014 is $48,452.
( 2 ) |
Eldorado Gold Corporation
Notes to the unaudited condensed consolidated financial statements
(Expressed in thousands of U.S. dollars, unless otherwise stated)
5. | Debt |
September 30, 2014 $ | December 31, 2013 $ | |
Current: | ||
Jinfeng China Merchant Bank (“CMB”) working capital loan (a) | 8,127 | 16,402 |
Non-current: | ||
Senior notes (b) | 586,652 | 585,006 |
Total debt | 594,779 | 601,408 |
(a) Jinfeng CMB working capital loan
On January 16, 2013, Jinfeng entered into a RMB 100.0 million ($16,254) working capital loan with CMB. Each drawdown bears fixed interest at the prevailing lending rate stipulated by the People’s Bank of China on the date of drawdown. The Facility had a term of up to one year, from January 16, 2013 to January 14, 2014. In January 2014, the term of the facility was extended to January 28, 2015. This facility is unsecured.
During the quarter ended September 30, 2014, Jinfeng repaid the full amount under this facility and concurrently drew down RMB 50.0 million ($8,127) and has used the proceeds to fund working capital obligations. All tranches of the loan have a term of six months and a fixed interest rate of 5.6%.
(b) Senior notes
On December 10, 2012, the Company completed an offering of $600.0 million senior notes (“the notes”) at par value, with a coupon rate of 6.125% due December 15, 2020. The notes pay interest semi-annually on June 15 and December 15. Net deferred financing costs of $13,348 have been included as an offset in the balance of the notes in the financial statements and are being amortized over the term of the notes.
The fair market value of the notes as at September 30, 2014 was $600.4 million.
(c) Entrusted loan
In November 2010, Eastern Dragon, HSBC Bank (China) and Qinghai Dachaidan Mining Ltd (“QDML”), our 90% owned subsidiary, entered into a RMB 12.0 million ($1,950) entrusted loan agreement, which has been increased to RMB 720.0 million ($117,026) through a series of amendments.
Under the terms of the entrusted loan, QDML with its own funds entrusts HSBC Bank (China) to provide a loan facility in the name of QDML to Eastern Dragon. The loan can be drawn down in tranches. Each drawdown bears interest fixed at the prevailing lending rate stipulated by the People’s Bank of China on the date of drawdown. Each draw down has a term of three months and can be rolled forward at the discretion of QDML. The interest rate on this loan as at September 30, 2014 was 4.59%.
As at September 30, 2014, RMB 647.1 million ($105,177) had been drawn under the entrusted loan.
Subsequent to September 30, 2014, RMB 0.7 million ($117) was drawn under this loan.
The entrusted loan has been recorded on a net settlement basis.
( 3 ) |
Eldorado Gold Corporation
Notes to the unaudited condensed consolidated financial statements
(Expressed in thousands of U.S. dollars, unless otherwise stated)
6. | Share capital |
Eldorado’s authorized share capital consists of an unlimited number of voting common shares without par value and an unlimited number of non-voting common shares without par value. At September 30, 2014 there were no non-voting common shares outstanding (December 31, 2013 –none).
Voting common shares | Number of Shares | Total $ |
At January 1, 2014 | 716,216,690 | 5,314,589 |
Share issued upon exercise of share options, for cash | 60,914 | 438 |
Estimated fair value of share options exercised | 101 | |
Common shares issued for deferred phantom units | 31,920 | 224 |
At September 30, 2014 | 716,309,524 | 5,315,352 |
7. | Share-based payments |
(a) Share option plans
Movements in the number of share options outstanding and their related weighted average exercise prices are as follows:
2014 | ||
Weighted average exercise price Cdn$ | Number of options | |
At January 1, | 13.20 | 16,753,421 |
Granted | 7.82 | 6,210,824 |
Exercised | 7.84 | (60,914) |
Forfeited | 12.53 | (1,505,904) |
At September 30, | 11.70 | 21,397,427 |
At September 30, 2014, 15,598,680 share options (September 30, 2013 – 12,347,754) with a weighted average exercise price of Cdn$12.86 (September 30, 2013 – Cdn$13.42) had vested and were exercisable.
Share based compensation expense related to share options for the quarter ended September 30, 2014 was $2,014 (YTD – $9,091).
(b) Restricted share unit plan
A total of 877,753 restricted share units (“RSUs”) at a grant-date fair value of Cdn$7.84 per unit were granted during the period ended September 30, 2014 under the Company’s RSU plan and 292,584 RSUs were exercisable as at September 30, 2014.
The fair value of each RSU issued is determined as the closing share price at grant date. The current maximum number of common shares authorized for issue under the RSU plan is 5,000,000.
( 4 ) |
Eldorado Gold Corporation
Notes to the unaudited condensed consolidated financial statements
(Expressed in thousands of U.S. dollars, unless otherwise stated)
7. | Share-based payments(continued) |
A summary of the status of the restricted share unit plan and changes during the quarter ended September 30, 2014 is as follows:
Total RSUs | |
Balance at December 31, 2013 | 774,845 |
RSUs Granted | 877,753 |
Redeemed | (528,062) |
Forfeited | - |
Balance at September 30, 2014 | 1,124,536 |
As at September 30, 2014, 1,124,536 common shares purchased by the Company remain held in trust in connection with this plan. At the end of the period, 320,069 restricted share units are fully vested and exercisable. These shares purchased and held in trust have been included in treasury stock in the balance sheet.
Restricted share units expense for the period ended September 30, 2014 was $1,376 (YTD – $6,049).
(c) Deferred share units plan
At September 30, 2014, 253,865 deferred share units (“DSUs”) were outstanding with a value of $1,711, which is included in accounts payable and accrued liabilities.
Compensation income related to the DSUs was $137 for the period ended September 30, 2014 (YTD expense – $388).
8. | Fair value of financial instruments |
Fair values are determined directly by reference to published price quotations in an active market, when available, or by using a valuation technique that uses inputs observed from relevant markets.
The three levels of the fair value hierarchy are described below:
· | Level 1 – Unadjusted quoted prices in active markets that are accessible at the measurement date for identical, unrestricted assets or liabilities. |
· | Level 2 – Inputs that are observable, either directly or indirectly, but do not qualify as Level 1 inputs (i.e., quoted prices for similar assets or liabilities). |
· | Level 3 – Prices or valuation techniques that require inputs that are both significant to the fair value measurement and unobservable (i.e., supported by little or no market activity). |
The only assets measured at fair value as at September 30, 2014 are marketable securities. No liabilities are measured at fair value on a recurring basis as at September 30, 2014.
The fair value of financial instruments traded in active markets is based on quoted market prices at the balance sheet date. A market is regarded as active if quoted prices are readily and regularly available from an exchange, dealer, broker, industry group, pricing service, or regulatory agency, and those prices represent actual and regularly occurring market transactions on an arm’s length basis. The quoted market price used for financial assets held by the group is the current bid price. These instruments are included in Level 1. Instruments included in Level 1 comprise primarily publicly-traded equity investments classified as held-for-trading securities or available-for-sale securities.
With the exception of the fair market value of our senior notes (note 5b), all carrying amounts of financial instruments approximate their fair value.
( 5 ) |
Eldorado Gold Corporation
Notes to the unaudited condensed consolidated financial statements
(Expressed in thousands of U.S. dollars, unless otherwise stated)
9. | Supplementary cash flow information |
Three months ended September 30, | Nine months ended September 30, | ||||
2014 $ | 2013 $ | 2014 $ | 2013 $ | ||
Changes in non-cash working capital | |||||
Accounts receivable and other | (3,955) | 16,800 | (15,010) | 11,109 | |
Inventories | 5,859 | (4,909) | 10,224 | (6,815) | |
Accounts payable and accrued liabilities | 11,543 | 3,563 | (36,367) | (25,105) | |
Total | 13,447 | 15,454 | (41,153) | (20,811) | |
Supplementary cash flow information | |||||
Income taxes paid | 26,024 | 20,533 | 66,357 | 77,802 | |
Interest paid | 188 | 348 | 17,548 | 17,704 |
10. | Segment information |
Identification of reportable segments
The Company has identified its operating segments based on the internal reports that are reviewed and used by the chief executive officer and the executive management (the chief operating decision makers or CODM) in assessing performance and in determining the allocation of resources.
The CODM considers the business from both a geographic and product perspective and assesses the performance of the operating segments based on measures of profit and loss as well as assets and liabilities. These measures include gross profit (loss), expenditures on exploration, property, plant and equipment and non-current assets, as well as total debt. As at September 30, 2014, Eldorado had six reportable segments based on the geographical location of mining and exploration and development activities.
10.1 Geographical segments
Geographically, the operating segments are identified by country and by operating mine or mine under construction as follows:
· | The Turkey reporting segment includes the Kişladağ and the Efemçukuru mines and exploration activities in Turkey. |
· | The China reporting segment includes the Tanjianshan (“TJS”), Jinfeng and White Mountain mines, the Eastern Dragon project and exploration activities in China. |
· | The Brazil reporting segment includes the Vila Nova mine, Tocantinzinho project and exploration activities in Brazil. |
· | The Greece reporting segment includes the Stratoni mine, the Olympias, Skouries, Perama Hill and Sapes projects and exploration activities in Greece. |
· | The Romania reporting segment includes the Certej project and exploration activities in Romania. |
· | Other reporting segment includes operations of Eldorado’s corporate office and exploration activities in other countries. |
Financial information about each of these operating segments is reported to the CODM on at least a monthly basis.
( 6 ) |
Eldorado Gold Corporation
Notes to the unaudited condensed consolidated financial statements
(Expressed in thousands of U.S. dollars, unless otherwise stated)
10. | Segment information(continued) |
For the three months ended September 30, 2014 | |||||||
Turkey | China | Brazil | Greece | Romania | Other | Total | |
$ | $ | $ | $ | $ | $ | $ | |
Information about profit and loss | |||||||
Metal sales from external customers | 135,913 | 106,087 | 6,267 | 15,243 | - | - | 263,510 |
Production costs | 49,413 | 54,334 | 8,046 | 11,710 | - | - | 123,503 |
Inventory write-down | - | - | 7,577 | - | - | - | 7,577 |
Depreciation | 12,689 | 22,894 | 1,267 | 2,345 | 1 | 145 | 39,341 |
Gross profit (loss) | 73,811 | 28,859 | (10,623) | 1,188 | (1) | (145) | 93,089 |
Other material items of income and expense | |||||||
Exploration costs | 691 | 813 | 986 | 234 | 242 | 522 | 3,488 |
Income tax expense (recovery) | 28,544 | 7,976 | 1,377 | 1,003 | - | - | 38,900 |
Additions to property, plant and | |||||||
equipment during the period | 20,328 | 12,264 | 1,227 | 67,748 | 3,915 | 25 | 105,507 |
For the three months ended September 30, 2013 | |||||||
Turkey | China | Brazil | Greece | Romania | Other | Total | |
$ | $ | $ | $ | $ | $ | $ | |
Information about profit and loss | |||||||
Metal sales to external customers | 150,160 | 117,762 | 9,414 | 9,918 | - | - | 287,254 |
Production costs | 45,461 | 61,383 | 7,297 | 6,612 | - | - | 120,753 |
Depreciation | 10,081 | 26,510 | 1,174 | 2,282 | - | 414 | 40,461 |
Gross profit (loss) | 94,618 | 29,869 | 943 | 1,024 | - | (414) | 126,040 |
Other material items of income and expense | |||||||
Exploration expenses | 5,370 | 1,484 | 1,395 | 274 | 154 | 1,189 | 9,866 |
Income tax expense | 32,569 | 9,067 | 195 | (3,679) | - | - | 38,152 |
Additions to property, plant and | |||||||
equipment during the period | 42,429 | 27,928 | 1,088 | 41,832 | 5,597 | 771 | 119,645 |
( 7 ) |
Eldorado Gold Corporation
Notes to the unaudited condensed consolidated financial statements
(Expressed in thousands of U.S. dollars, unless otherwise stated)
10. | Segment information(continued) |
For the nine months ended September 30, 2014 | |||||||
Turkey | China | Brazil | Greece | Romania | Other | Total | |
$ | $ | $ | $ | $ | $ | $ | |
Information about profit and loss | |||||||
Metal sales from external customers | 387,885 | 351,879 | 28,763 | 40,350 | - | - | 808,877 |
Production costs | 146,934 | 174,175 | 27,074 | 32,629 | - | - | 380,812 |
Inventory write-down | - | - | 7,577 | - | - | - | 7,577 |
Depreciation | 38,706 | 78,898 | 4,338 | 6,505 | 1 | 560 | 129,008 |
Gross profit (loss) | 202,245 | 98,806 | (10,226) | 1,216 | (1) | (560) | 291,480 |
Other material items of income and expense | |||||||
Exploration costs | 1,805 | 1,932 | 3,156 | 880 | 1,363 | 2,137 | 11,273 |
Income tax expense (recovery) | 62,239 | 27,529 | 572 | 6,003 | - | - | 96,343 |
Additions to property, plant and | |||||||
equipment during the period | 61,367 | 32,742 | 3,106 | 187,784 | 9,588 | 295 | 294,882 |
Information about assets and liabilities | |||||||
Property, plant and equipment (*) | 875,588 | 1,424,597 | 203,770 | 2,739,708 | 626,491 | 2,000 | 5,872,154 |
Goodwill | - | 52,514 | - | 473,782 | - | - | 526,296 |
875,588 | 1,477,111 | 203,770 | 3,213,490 | 626,491 | 2,000 | 6,398,450 | |
Debt | - | 8,127 | - | - | - | 586,652 | 594,779 |
For the nine months ended September 30, 2013 | |||||||
Turkey | China | Brazil | Greece | Romania | Other | Total | |
$ | $ | $ | $ | $ | $ | $ | |
Information about profit and loss | |||||||
Metal sales to external customers | 489,756 | 333,230 | 33,254 | 36,011 | - | - | 892,251 |
Production costs | 145,828 | 167,466 | 21,858 | 32,102 | - | - | 367,254 |
Depreciation | 32,161 | 68,095 | 3,281 | 7,859 | - | 1,413 | 112,809 |
Gross profit (loss) | 311,767 | 97,669 | 8,115 | (3,950) | - | (1,413) | 412,188 |
Other material items of income and expense | |||||||
Exploration expenses | 10,335 | 4,458 | 5,876 | 1,188 | 637 | 5,236 | 27,730 |
Income tax expense | 85,367 | 24,503 | 1,899 | 122,022 | 108 | 55 | 233,954 |
Additions to property, plant and | |||||||
equipment during the period | 137,920 | 77,562 | 8,612 | 99,247 | 17,440 | 1,649 | 342,430 |
For the year ended December 31, 2013 | |||||||
Turkey | China | Brazil | Greece | Romania | Other | Total | |
$ | $ | $ | $ | $ | $ | $ | |
Information about assets and liabilities | |||||||
Property, plant and equipment (*) | 854,893 | 1,461,592 | 201,791 | 2,546,935 | 616,906 | 2,265 | 5,684,382 |
Goodwill | - | 52,514 | - | 473,782 | - | - | 526,296 |
854,893 | 1,514,106 | 201,791 | 3,020,717 | 616,906 | 2,265 | 6,210,678 | |
Debt | - | 16,402 | - | - | - | 585,006 | 601,408 |
* Net of revenues from sale of production from tailings retreatment
( 8 ) |
Eldorado Gold Corporation
Notes to the unaudited condensed consolidated financial statements
(Expressed in thousands of U.S. dollars, unless otherwise stated)
10. | Segment information(continued) |
The Turkey and China segments derive their revenues from sales of gold. The Brazil segment derives its revenue from sales of iron ore. The Greece segment derives its revenue from sales of zinc, lead and silver concentrates.
The measure of total debt represents the current and long-term portions of debt.
10.2 | Economic dependence |
At September 30, 2014, each of our Chinese mines had one major customer, to whom each sells its entire production, as follows: |
TJS Mine Henan Zhongyuan Gold Smelter Factory Co. Ltd.of Zhongjin Gold Holding Co. Ltd.
Jinfeng Mine China National Gold Group
White Mountain Mine Refinery of Shandong Humon Smelting Co. Ltd.
10.3 Seasonality/cyclicality of operations |
Management does not consider operations to be of a significant seasonal or cyclical nature. |
) |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
MANAGEMENT’S DISCUSSION and ANALYSIS
OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS (MD&A)
for the three and nine-month periods ended September 30, 2014
Throughout this MD&A,Eldorado,we, us, our andthe Company mean Eldorado Gold Corporation.
This quarter means the third quarter of 2014. All dollar amounts are in United States dollars unless stated otherwise.
The information in this MD&A is as of October 30, 2014. You should also read our audited consolidated financial statements for the year ended December 31, 2013 prepared in accordance with International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board (IASB) and the unaudited interim condensed consolidated financial statements for the three and nine-month periods ended September 30, 2014 prepared in accordance with International Accounting Standard (IAS) 34 – “Interim Financial Reporting”. We file our financial statements and MD&A with appropriate regulatory authorities in Canada and the United States. You can find more information about Eldorado, including our Annual Information Form, on SEDAR at www.sedar.com.
About Eldorado
Based in Vancouver, Canada, Eldorado owns and operates gold mines around the world. Its activities involve all facets of the gold mining industry including exploration and evaluation, development, production and reclamation.
Operating gold mines:
· | Kisladag, in Turkey (100%) |
· | Efemcukuru, in Turkey (100%) |
· | Tanjianshan, in China (90%) |
· | Jinfeng, in China (82%) |
· | White Mountain, in China (95%) |
Gold projects:
· | Skouries, in Greece (95%) |
· | Olympias, in Greece (95%) |
· | Perama Hill, in Greece (100%) |
· | Sappes, in Greece (100%) |
· | Certej, in Romania (81%) |
· | Eastern Dragon, in China (75%) |
· | Tocantinzinho, in Brazil (100%) |
Other mines:
· | Vila Nova – iron ore, in Brazil (100%) |
· | Stratoni – silver, lead, zinc, in Greece (95%) |
Eldorado’s common shares are listed on the following exchanges:
· | Toronto Stock Exchange (TSX) under the symbol ELD |
· | New York Stock Exchange (NYSE) under the symbol EGO |
ELD is part of the S&P/TSX Global Gold Index. EGO is part of the AMEX Gold BUGS Index.
1 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
Third quarter summary results
Selected consolidated financial information
· | Net profit attributable to shareholders of the Company was $19.8 million ($0.03 per share), compared to $36.4 million ($0.05 per share) in the third quarter of 2013. |
· | Gold revenues were $241.2 million (2013 - $266.4 million) on sales of 189,321 ounces of gold at an average realized gold price of $1,274 per ounce (2013 – 199,117 ounces at $1,338 per ounce). |
· | Liquidity of $937.3 million, including $562.3 million in cash, cash equivalents and term deposits, and $375.0 million in undrawn lines of credit. |
Selected performance measures(1)
· | Gold production of 192,578 ounces, including Olympias production from tailings retreatment (2013 – 204,620 ounces). |
· | Cash operating costs averaged $488 per ounce sold (2013 – $472 per ounce sold). |
· | All-in sustaining cash costs averaged $735 per ounce. |
· | Gross profit from gold mining operations was $102.0 million (2013 – $123.1 million). |
· | Adjusted net earnings of $36.1 million ($0.05 per share) compared to adjusted net earnings of $54.4 million ($0.08 per share) in 2013. |
· | Cash generated from operating activities before changes in non-cash working capital was $78.7 million (2013 – $104.8 million). |
(1) Throughout this MD&A we use cash operating cost per ounce, total cash costs per ounce, sustaining cost per ounce, gross profit from gold mining operations, adjusted net earnings, and cash flow from operating activities before changes in non-cash working capital as additional measures of Company performance. These are non-IFRS measures. Please see page 11 for an explanation and discussion of these non-IFRS measures.
2 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
Review of Financial Results
Summarized financial results | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Revenues (millions) | $263.5 | $287.3 | $808.9 | $892.3 |
Gold revenues (millions) | $241.2 | $266.4 | $736.4 | $817.2 |
Gold sold (ounces) | 189,321 | 199,117 | 570,570 | 564,723 |
Average realized gold price (US$ per ounce) | $1,274 | $1,338 | $1,291 | $1,447 |
Cash operating costs (US$ per ounce sold) | $488 | $472 | $499 | $485 |
Total cash cost (US$ per ounce sold) | $543 | $528 | $556 | $544 |
All-in sustaining cash cost (US$ per ounce sold) | $735 | n/a | $784 | n/a |
Gross profit from gold mining operations (millions) | $102.0 | $123.1 | $298.2 | $404.2 |
Adjusted net earnings (millions) | $36.1 | $54.4 | $109.2 | $186.0 |
Net profit (loss) attributable to shareholders of the Company (millions) | $19.8 | $36.4 | $88.7 | $34.2 |
Earnings (loss) per share attributable to shareholders of the Company – Basic (US$/share) | $0.03 | $0.05 | $0.12 | $0.05 |
Earnings (loss) per share attributable to shareholders of the Company – Diluted (US$/share) | $0.03 | $0.05 | $0.12 | $0.05 |
Dividends paid (Cdn$/share) | $0.01 | $0.05 | $0.02 | $0.12 |
Cash flow from operating activities before changes in non-cash working capital (millions) | $78.7 | $104.8 | $265.6 | $329.6 |
Net income attributable to shareholders of the Company for the quarter was $19.8 million (or $0.03 per share), compared with $36.4 million (or $0.05 per share) in the third quarter of 2013. Net income was impacted by a non-cash $7.6 million iron ore inventory write-down related to Vila Nova. Gold revenues of $241.2 million were nine percent lower year over year due to lower gold prices and ounces sold. Gross profit from gold mining operations was seventeen percent lower than that of the third quarter of 2013 reflecting lower profit margins and sales volumes. Total cash cost per ounce increased three percent year over year. Adjusted net earnings were $36.1 million or $0.05 per share compared with $54.4 million or $0.08 per share in the third quarter of 2013.
Exploration expenses fell $6.4 million year over year reflecting changes in the Company’s exploration program in response to lower gold prices. The Company reported a foreign exchange loss of $4.5 million for the quarter as compared to a gain of $0.9 million for the third quarter of 2013 mainly as a result of the impact on cash deposits of the weakening of the Canadian, Brazilian and Turkish currencies against the US dollar. Interest and financing costs fell $2.9 million year over year, reflecting an increase in capitalization of interest on the Company’s Greek development projects.
The effective tax rate for the quarter was sixty-four percent as compared to a rate of fifty percent in the third quarter of 2013. The increase in the effective tax rate year over year was due to the impact of the fall in the Turkish lira on the deferred tax balances of the Company’s Turkish entity as well as an increase in the percentage of unrecognized tax losses due to lower profits.
3 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
Operations update
Summarized Operating Results | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Gross profit – gold mining operations (millions) | $102.0 | $123.1 | $298.2 | $404.2 |
Ounces produced – including Olympias production from tailings retreatment | 192,578 | 204,620 | 589,652 | 552,359 |
Cash operating costs ($ per ounce sold) | $488 | $472 | $499 | $485 |
Total cash cost ($ per ounce sold) | $543 | $528 | $556 | $544 |
Kisladag | ||||
Gross profit – gold mining operations (millions) | $62.9 | $79.5 | $163.1 | $242.1 |
Ounces produced | 78,030 | 84,762 | 222,085 | 231,718 |
Cash operating costs ($ per ounce sold) | $411 | $324 | $435 | $328 |
Total cash cost ($ per ounce sold) | $427 | $343 | $454 | $349 |
Efemcukuru | ||||
Gross profit – gold mining operations (millions) | $10.3 | $13.9 | $36.6 | $64.9 |
Ounces produced | 26,838 | 23,438 | 78,841 | 69,583 |
Cash operating costs ($ per ounce sold) | $547 | $551 | $541 | $558 |
Total cash cost ($ per ounce sold) | $564 | $568 | $562 | $586 |
Tanjianshan | ||||
Gross profit – gold mining operations (millions) | $12.7 | $15.3 | $39.7 | $49.6 |
Ounces produced | 25,387 | 28,179 | 79,556 | 82,324 |
Cash operating costs ($ per ounce sold) | $381 | $377 | $399 | $405 |
Total cash cost ($ per ounce sold) | $563 | $557 | $575 | $589 |
Jinfeng | ||||
Gross profit – gold mining operations (millions) | $12.4 | $9.9 | $41.7 | $26.9 |
Ounces produced | 39,421 | 40,212 | 126,284 | 90,843 |
Cash operating costs ($ per ounce sold) | $609 | $684 | $590 | $743 |
Total cash cost ($ per ounce sold) | $693 | $767 | $673 | $831 |
White Mountain | ||||
Gross profit – gold mining operations (millions) | $3.7 | $4.5 | $17.0 | $20.7 |
Ounces produced | 18,130 | 19,287 | 65,603 | 57,664 |
Cash operating costs ($ per ounce sold) | $648 | $713 | $611 | $693 |
Total cash cost ($ per ounce sold) | $691 | $751 | $651 | $734 |
Olympias | ||||
Ounces produced from tailings retreatment | 4,772 | 8,742 | 17,283 | 20,227 |
4 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
Kisladag
Operating Data | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Tonnes placed on pad | 3,829,444 | 3,336,465 | 10,814,170 | 9,553,306 |
Average treated head grade - grams per tonne (g/t) | 1.28 | 1.28 | 1.04 | 1.28 |
Gold (ounces) | ||||
- Produced | 78,030 | 84,762 | 222,085 | 231,718 |
- Sold | 82,374 | 85,029 | 222,041 | 231,959 |
Cash operating costs (per ounce sold) | $411 | $324 | $435 | $328 |
Total cash costs (per ounce sold) | $427 | $343 | $454 | $349 |
Financial Data (millions) | ||||
Gold revenues | $105.2 | $113.4 | $285.4 | $336.5 |
Depreciation and depletion | $6.8 | $4.1 | $19.5 | $10.9 |
Gross profit – gold mining operations | $62.9 | $79.5 | $163.1 | $242.1 |
Sustaining capital expenditures | $5.4 | $8.4 | $30.5 | $19.0 |
Gold production for the quarter at Kisladag was lower year over year due to lower average head grade of ore placed on the leach pad. Run of mine ore contributed to increased tonnes placed on the pad during the quarter. Cash costs were higher than in the same period in 2013 due to an increase in production waste mining (2014 – 6.4 million tonnes versus 2013 – 0.2 million tonnes). Capital expenditures during the quarter included waste stripping and leach pad construction.
Efemcukuru
Operating Data | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Tonnes Milled | 106,942 | 105,641 | 324,149 | 301,869 |
Average treated head grade - grams per tonne (g/t) | 9.08 | 8.50 | 8.54 | 8.77 |
Average Recovery Rate (to Concentrate) | 93.3% | 93.2% | 93.2% | 93.6% |
Gold (ounces) | ||||
- Produced | 26,838 | 23,438 | 78,841 | 69,583 |
- Sold | 24,033 | 26,410 | 77,115 | 101,888 |
Cash operating costs (per ounce sold) | $547 | $551 | $541 | $558 |
Total cash costs (per ounce sold) | $564 | $568 | $562 | $586 |
Financial Data (millions) | ||||
Gold revenues | $30.0 | $35.4 | $99.7 | $148.1 |
Depreciation and depletion | $5.8 | $5.9 | $18.9 | $20.9 |
Gross profit – gold mining operations | $10.3 | $13.9 | $36.6 | $64.9 |
Sustaining capital expenditures | $7.7 | $5.3 | $18.9 | $21.8 |
Gold production during the quarter at Efemcukuru was higher year over year due to higher mill throughput and average treated head grade. Sales during the quarter were lower year over year due to the timing of concentrate shipments. Cash operating costs per ounce were lower due to higher average treated head grade and continued cost reduction efforts. Capital spending during the quarter included costs related to capitalized underground development, mobile equipment, surface infrastructure, and process improvements.
5 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
Tanjianshan
Operating Data | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Tonnes Milled | 281,862 | 285,406 | 823,698 | 805,532 |
Average treated head grade - grams per tonne (g/t) | 3.50 | 3.40 | 3.41 | 3.54 |
Average Recovery Rate | 81.4% | 82.9% | 81.5% | 82.5% |
Gold (ounces) | ||||
- Produced | 25,387 | 28,179 | 79,556 | 82,324 |
- Sold | 25,387 | 28,179 | 79,556 | 82,324 |
Cash operating costs (per ounce sold) | $381 | $377 | $399 | $405 |
Total cash costs (per ounce sold) | $563 | $557 | $575 | $589 |
Financial Data (millions) | ||||
Gold revenues | $32.1 | $38.1 | $102.7 | $119.0 |
Depreciation and depletion | $4.9 | $6.7 | $16.7 | $20.0 |
Gross profit – gold mining operations | $12.7 | $15.3 | $39.7 | $49.6 |
Sustaining capital expenditures | $2.1 | $4.2 | $6.9 | $9.3 |
Gold production during the quarter at Tanjianshan was lower year over year as a result of lower tonnage throughput and lower recovery rate due to the treatment of stockpile material. Capital spending included resource evaluation activities and waste stripping.
Jinfeng
Operating Data | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Tonnes Milled | 353,048 | 363,798 | 1,090,006 | 1,052,406 |
Average treated head grade - grams per tonne (g/t) | 3.86 | 3.66 | 4.01 | 3.15 |
Average Recovery Rate | 87.1% | 88.0% | 87.1% | 85.0% |
Gold (ounces) | ||||
- Produced | 39,421 | 40,212 | 126,284 | 90,843 |
- Sold | 39,397 | 40,212 | 126,255 | 90,888 |
Cash operating costs (per ounce sold) | $609 | $684 | $590 | $743 |
Total cash costs (per ounce sold) | $693 | $767 | $673 | $831 |
Financial Data (millions) | ||||
Gold revenues | $50.7 | $53.8 | $163.7 | $129.7 |
Depreciation and depletion | $11.0 | $13.0 | $37.0 | $27.2 |
Gross profit – gold mining operations | $12.4 | $9.9 | $41.7 | $26.9 |
Sustaining capital expenditures | $0.9 | $15.0 | $8.0 | $44.3 |
Gold production during the quarter at Jinfeng was lower year over year due to an increase in gold in circuit inventory. Cash operating costs per ounce were lower mainly due to less waste tonnage from the open pit. Capital spending during the quarter included underground mine development and tailings dam construction.
6 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
White Mountain
Operating Data | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Tonnes Milled | 218,500 | 209,581 | 632,923 | 611,548 |
Average treated head grade - grams per tonne (g/t) | 2.79 | 3.28 | 3.48 | 3.44 |
Average Recovery Rate | 89.4% | 84.0% | 88.1% | 85.5% |
Gold (ounces) | ||||
- Produced | 18,130 | 19,287 | 65,603 | 57,664 |
- Sold | 18,130 | 19,287 | 65,603 | 57,664 |
Cash operating costs (per ounce sold) | $648 | $713 | $611 | $693 |
Total cash costs (per ounce sold) | $691 | $751 | $651 | $734 |
Financial Data (millions) | ||||
Gold revenues | $23.2 | $25.7 | $84.9 | $83.9 |
Depreciation and depletion | $6.9 | $6.7 | $25.0 | $20.6 |
Gross profit – gold mining operations | $3.7 | $4.5 | $17.0 | $20.7 |
Sustaining capital expenditures | $5.8 | $9.1 | $15.1 | $20.9 |
Gold production during the quarter at White Mountain was lower year over year mainly as a result of lower average treated head grade, partially offset by higher average recovery rates. Cash operating costs per ounce decreased year over year mainly due to reduced backfill costs. Capital spending this quarter included underground development, exploration and delineation, and camp improvements.
Vila Nova
Operating Data | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Tonnes Processed | 208,583 | 219,925 | 602,785 | 612,700 |
Iron Ore Produced | 180,152 | 189,858 | 517,951 | 528,456 |
Average Grade (% Fe) | 63.4% | 63.2% | 63.0% | 63.1% |
Iron Ore Tonnes | ||||
- Sold | 135,093 | 126,835 | 439,993 | 338,256 |
Average Realized Iron Ore Price | $46 | $74 | $65 | $98 |
Cash Costs (per tonne produced) | $60 | $58 | $62 | $65 |
Financial Data (millions) | ||||
Revenues | $6.3 | $9.4 | $28.8 | $33.3 |
Depreciation and depletion | $1.3 | $1.2 | $4.3 | $3.3 |
Gross profit / loss from mining operations | ($10.6) | $0.9 | ($10.2) | $8.1 |
Sustaining capital expenditures | $0 | $0.3 | $1.0 | $3.9 |
The Company recorded a $7.6 million inventory write-down against gross profit/loss for Vila Nova during the quarter as a result of the continued fall in iron ore prices, and has decided to place the mine on care and maintenance pending a review of options to return it to profitability. Not including the inventory write-down, Vila Nova recorded a loss of $3.0 million for the quarter compared with gross profit of $0.9 million in the third quarter of 2013.
7 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
Stratoni
Operating Data | 3 months ended September 30, | 9 months ended September 30, | ||
2014 | 2013 | 2014 | 2013 | |
Tonnes ore mined (wet) | 60,006 | 60,011 | 174,523 | 174,245 |
Tonnes ore processed (dry) | 58,230 | 56,463 | 169,227 | 167,315 |
Pb grade (%) | 5.63% | 6.33% | 5.96% | 6.39% |
Zn grade (%) | 9.66% | 9.37% | 10.75% | 9.49% |
Ag grade (g/t) | 146 | 161 | 153 | 166 |
Tonnes of concentrate produced | 14,363 | 14,586 | 46,013 | 42,918 |
Tonnes of concentrate sold | 15,884 | 12,096 | 45,590 | 42,847 |
Average realized concentrate price (per tonne) | $960 | $820 | $885 | $840 |
Cash Costs (per tonne of concentrate sold) | $737 | $547 | $716 | $749 |
Financial Data (millions) | ||||
Revenues | $15.2 | $9.9 | $40.3 | $36.0 |
Depreciation and depletion | $2.3 | $2.2 | $6.3 | $7.5 |
Gross profit from mining operations | $1.3 | $1.1 | $1.5 | ($3.6) |
Sustaining capital expenditures | $1.2 | $1.4 | $2.7 | $2.0 |
Combined metal concentrate production at Stratoni for the quarter was the same year over year, with lower lead concentrate production offset by higher zinc concentrate production as a result of changes in metal head grades. Concentrate sales were higher year over year due to the timing of sales. Prices received for lead and zinc concentrates were both higher year on year.
Development project update
Kisladag Mine Expansion
During the third quarter work began at Kisladag on the engineering of an additional 7.5 million tonnes per year (“Mtpa”) crushing/screening circuit and its integration with the new gyratory crusher station. Work also began on the design of a new stockpile facility to provide feed to the existing crushing/screening circuit as well as the additional 7.5 Mtpa circuit. Total capacity for crushed ore will be raised to 20 Mtpa as per the expansion plan approved during the second quarter. Work continued during the quarter on upgrading the overland conveyor and stacking system that feeds the leach pad to handle the additional mine crusher throughput. Capital spending totaled $6.8 million during the quarter.
Skouries
The mill foundations at Skouries were completed during the quarter. These include the semi-autogenous grind (“SAG”) mill, ball mill, and the regrind mills. A key milestone of the project was also achieved, with the transportation to site, and start of installation of the SAG and ball mill shells. Placement of the rest of the mills is scheduled to be completed during the fourth quarter. During the quarter the project received approval of the technical study for the construction of the first tailings dam which has allowed construction work of the tailings dams to start in the fourth quarter. Piling also commenced in the flotation building area. During the quarter, pit preparation work continued with the removal of topsoil and overburden from the open pit. The pit work will increase during the fourth quarter as waste material is mined for construction of the tailings dam facility. The procurement process for the open pit mining contractor also began during the quarter with a site visit by potential bidders on the contract.
8 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
Progress continued on the underground decline with the advance rate improving. Capital spending totaled $35.4 million during the quarter.
Olympias
A total of 137,566 tonnes of tailings were reprocessed during the quarter at a grade of 2.69 grams per tonne. A total of 4,772 payable ounces of gold in concentrate were produced. Cash proceeds from the sale of concentrate generated $6.5 million during the quarter on 5,393 ounces of gold in concentrate. Capital spending totalled $27.9 million during the quarter including $8.4 million related to tailings reprocessing, production royalties and transportation and selling costs, $2.2 million related to capitalized interest, and the remainder on mine development as well as Phase II engineering.
Plans for transitioning the plant operation from Phase l tailings retreatment to Phase II processing of underground ore continued to be studied during the quarter. The plans are based on upgrading the existing plant facilities to handle a throughput of up to 650,000 tonnes per year of ore to produce gold, lead/silver and zinc concentrates.
Perama Hill
Preliminary engineering was completed with the final front end engineering design report received during the quarter. The Company continues to work with Greek government authorities to facilitate approval of the Environmental Impact Assessment (“EIA”). Capital spending totaled $1.6 million during the quarter.
Certej
During the quarter the feasibility study commenced in order to optimize the expanded resource and improve the metallurgical design. Construction permits were obtained for the 2014 site works program allowing mobilization of the site earthworks contractor to begin rough grading of the south plant site and construction of the pilot water treatment plant. Capital spending totaled $3.6 million during the quarter.
Tocantinzinho
During the quarter work continued on optimization of the Tocantinzinho feasibility study. Following a review of the geological model, which updated the overall tonnes and grade in the deposit, a rework of the mine design and plant throughput has been incorporated into the ongoing optimization analysis. Access to the site was upgraded to improve surface conditions and drainage. Construction on a portion of the recently approved forest road was begun. Capital spending totaled $1.2 million during the quarter.
Eastern Dragon
The Eastern Dragon site continued under care and maintenance during the quarter with permitting activities ongoing. The Company was informed that approval of the project EIA is to be conducted by the Heilionjiang Provincial Environment Protection Bureau. Site personnel continued to provide support to the permitting team, particularly at the local and provincial level.
Exploration update
During the third quarter, a total of 19,000 metres of exploration drilling were completed at the Company’s mine sites, development projects, and exploration projects.
Greece
In the Halkidiki District, a 6,000 metre drilling program continued during the quarter at the Piavitsa deposit, which is located 2 kilometres west of the Stratoni project. This program consists largely of infill drillholes, designed to confirm the continuity of mineralization delineated in widely-spaced drillholes drilled during 2012 and 2013. Results to date showed grades and thicknesses in general agreement with the resource model.
9 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
At the Stratoni mine, step-out drilling targeted the western and down-dip extensions of the orebody. The best results were obtained from just below the current production levels where thick massive sulfide intercepts indicate down-dip continuity of the orebody.
In the Perama / Sapes district, exploration activities during the quarter focused on updating the geological model for the Sapes deposit for the purposes of refining the resource model and identifying exploration drilling targets.
Romania
In the Certej project area, exploration drilling during the quarter tested satellite targets at Magura and Bocsa, both of which were sites of historical underground exploration. No significant results were obtained from the first three drillholes on these targets. These prospects will be further tested during the fourth quarter, upon receipt of required drilling permits.
At Muncel, located 15 kilometres southwest of Certej, the final three drillholes of the first phase of exploration drilling were completed. One of these was abandoned after intersecting underground workings, while the other two cut weak to moderate zones of sulfide stringer veinlets.
The Certej deposit is currently the subject of a detailed geological reinterpretation program, which will be completed in the fourth quarter with updated deposit geology and resource models.
Turkey
Exploration drilling during the quarter in Turkey was limited to the Efemcukuru project, where 2,900 metres of drilling tested the Dedebag vein system and segments of the Kokarpinar vein. The best results were obtained from the central and northern portions of the Kokarpinar vein, where several metres of sulfide-rich rhodochrosite vein intercepts of several metres width were obtained.
Reconnaissance exploration activities included mapping and sampling of volcanic centres in the greater Kisladag region to evaluate potential for buried porphyry systems, and evaluations of regional prospects in the northern part of the country.
China
At Tanjianshan, drilling programs were completed at the Dushugou prospect and at the Qinlongtan (“QLT”) deposit. At QLT drilling confirmed the continuity of the QLT Northwest zone in the previously untested gap between the 2013 drillholes and the QLT open pit.
Exploration drilling at the White Mountain mine (4,700 metres completed) tested step-outs along-strike and down-plunge from the ore body. Mining grades and thicknesses were confirmed in five separate areas, with highest grades encountered in the North and North Deep ore zones. Surface drilling of the North Deep zone also commenced during the quarter.
Brazil
Exploration drilling during the quarter in Brazil tested two projects in the Tapajos region. At the Ruben Zilio project, located along strike southeast of Tocantinzinho, soil geochemical anomalies were tested in three target areas; none of this drilling identified significant mineralization. At Tocantinzinho, additional sampling extended the Cu-Mo-Au mineralization over a 6 km trend. Four drillholes tested different areas of this anomaly, and all encountered intervals of quartz and sulfide vein mineralization.
10 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
Quarterly results
millions (except per share amounts)
2014 | 2014 | 2014 | 2013 | 2013 | 2013 | 2013 | 2012 | ||
Third quarter | Second quarter | First quarter | Fourth quarter | Third quarter | Second quarter | First quarter | Fourth quarter | ||
Total revenues | $263.5 | $265.5 | $279.9 | $231.7 | $287.3 | $266.9 | $338.1 | $350.0 | |
Profit (loss) | $19.8 | $37.6 | $31.3 | ($687.5) | $36.4 | $43.3 | ($45.4) | $115.0 | |
Earnings (loss) per share | |||||||||
- basic | $0.03 | $0.05 | $0.04 | ($0.96) | $0.05 | $0.06 | ($0.06) | $0.16 | |
- diluted | $0.03 | $0.05 | $0.04 | ($0.96) | $0.05 | $0.06 | ($0.06) | $0.16 | |
Quarterly loss for the first quarter of 2013 was due to a one-time $125.2 million non-cash adjustment related to an increase in Greek income tax rates. Quarterly loss for the fourth quarter of 2013 was due to a one-time $684.6 million impairment charge.
Non-IFRS measures
Throughout this document, we have provided measures prepared in accordance with IFRS, as well as some non-IFRS performance measures as additional information for investors who also use them to evaluate our performance. Since there is no standard method for calculating non-IFRS measures, they are not a reliable way to compare us against other companies. Non-IFRS measures should be used along with other performance measures prepared in accordance with IFRS. We have defined our non-IFRS measures below and reconciled them with the IFRS measures we report.
Cash operating cost and total cash cost
The table below reconciles cash operating cost from our gold mining operations to production costs. We calculate costs according to the Gold Institute Standard. Total cash cost is the sum of cash operating cost, royalty expense and production tax expense.
Reconciliation of cash operating costs to production costs | 2014 | 2013 | 2014 | 2013 |
millions (except for gold ounces sold and cash operating cost per ounce sold) | Third quarter | Third quarter | Year to date | Year to date |
Production costs – excluding Vila Nova and Stratoni (from consolidated income statement) | $103.7 | $106.8 | $321.1 | $407.2 |
Less: | ||||
By-product credits and other adjustments | (0.9) | (1.7) | (3.6) | (7.7) |
Total cash cost | $102.8 | $105.1 | $317.5 | $399.5 |
Royalty expense and production taxes | (10.4) | (11.1) | (32.9) | (41.3) |
Cash operating cost | $92.4 | $94.0 | $284.6 | $358.2 |
Gold ounces sold | 189,321 | 199,117 | 570,570 | 725,095 |
Total cash cost per ounce sold | $543 | $528 | $556 | $551 |
Cash operating cost per ounce sold | $488 | $472 | $499 | $494 |
11 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
All-in sustaining cash cost
Effective January 31, 2014 the Company, in conjunction with an initiative undertaken within the gold mining industry and set out in the guidance note released by the World Gold Council on June 27, 2013, has adopted an all-in sustaining cost performance measure. All-in sustaining costs are calculated by taking total cash costs as indicated in the reconciliation above and adding sustaining capital expenditures, corporate administrative expense, exploration and evaluation costs, and reclamation cost accretion. The Company believes that this measure represents the total costs of producing gold from current operations, and provides the Company and other stakeholders of the company with additional information of the Company’s operational performance and ability to generate cash flows. As the measure seeks to reflect the full cost of gold production from current operations, new project capital is not included. Certain other cash expenditures, including tax payments, dividends and financing costs are also not included. The Company reports this measure on a gold ounces sold basis. The table below provides additional detail on the calculation of the Company’s all-in sustaining cash cost for the current periods.
Calculation of all-in sustaining cash costs | 2014 | 2014 |
millions (except for gold ounces sold and all-in sustaining cash cost per ounce sold) | Third quarter | Year to date |
Total cash cost – excluding Via Nova and Stratoni (per table above) | $102.8 | $317.5 |
Sustaining capital spending at operating gold mines | 21.9 | 79.4 |
Exploration spending at operating gold mines | 3.1 | 6.4 |
General and administrative expenses | 11.4 | 44.1 |
All-in sustaining cash costs | $139.2 | $447.4 |
Gold ounces sold | 189,321 | 570,570 |
All-in sustaining cash cost per ounce sold | $735 | $784 |
Cash flow from mining operations before changes in non-cash working capital
We usecash flow from mining operations before changes in non-cash working capital to supplement our consolidated financial statements, and calculate it by not including the period to period movement of non-cash working capital items, like accounts receivable, advances and deposits, inventory, accounts payable and accrued liabilities.
Adjusted net earnings
The Company has included non-IFRS performance measures,adjusted net earnings andadjusted net earnings per share, throughout this document. Adjusted net earnings excludes gains/losses and other costs incurred for acquisitions and disposals of mining interests, impairment charges, unrealized and non-cash realized gains/losses of financial instruments and foreign exchange impacts on deferred income tax as well as significant non-cash, non-recurring items. The Company also excludes net earnings and losses of certain associates that the Company does not view as part of the core mining operations. The Company excludes these items from net earnings to provide a measure which allows the Company and investors to evaluate the results of the underlying core operations of the Company and its ability to generate cash flow. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.
12 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
The following table provides a reconciliation of adjusted net earnings to the consolidated financial statements for the quarters ended September 30:
Reconciliation of adjusted net earnings to consolidated net earnings (loss) millions (except for weighted average shares and earnings per share) | Q3 2014 | Q3 2013 | YTD 2014 | YTD 2013 |
Net (loss) earnings attributable to shareholders | $19.8 | $36.4 | $88.7 | $34.2 |
Loss (gain) on disposal of assets | 0.3 | (0.1) | 2.1 | 0.0 |
Losses (gains) on available-for-sale securities | 0.1 | 0.0 | 1.4 | 0.0 |
Net loss (earnings) on equity investments | 0.0 | 1.4 | 0.1 | 2.5 |
Loss on investment in associates | 0.0 | 12.7 | 0.0 | 12.7 |
Inventory writedown | 7.6 | 0.0 | 7.6 | 0.0 |
Unrealized losses (gains) on foreign exchange translation of deferred income tax balances | 8.3 | 4.0 | 9.3 | 11.4 |
Deferred income tax charge for change in Greek tax rates | 0.0 | 0.0 | 0.0 | 125.2 |
Total adjusted net earnings | $36.1 | $54.4 | $109.2 | $186.0 |
Weighted average shares outstanding | 716,284 | 715,038 | 716,254 | 714,901 |
Adjusted net earnings ($/share) | $0.05 | $0.08 | $0.15 | $0.26 |
Gross profit from gold mining operations
Gross profit from gold mining operations represents gross revenues from gold mining operations less production costs and depreciation, depletion and amortization related to those operations.
Operating cash flow, financial condition and liquidity
Operating activities before changes in non-cash working capital generated $78.7 million in cash this quarter, compared to $104.8 million in the same quarter of 2013.
Capital expenditures
We invested $102.8 million in capital expenditures, mine evaluation and development, mining licences and other assets in the third quarter of 2014. Mine evaluation and development totalled $72.0 million while spending at our producing mines (including capitalized exploration) totalled $30.0 million. The remaining $0.8 million related to fixed assets for our corporate offices in Canada, Brazil, Turkey, Greece, Romania, and China.
Liquidity and capital resources
(millions) | September 30, 2014 | December 31, 2013 |
Cash, cash equivalents and term deposits | $562.3 | $623.9 |
Working capital | $679.7 | $734.0 |
Debt | $594.8 | $601.4 |
Management believes that the working capital at September 30, 2014, together with future cash flows from operations and, where appropriate, selected financing sources, including available credit lines, are sufficient to support our planned and foreseeable commitments, and dividends, if declared, in 2014 and beyond.
13 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
Contractual obligations
(millions) | Within 1 year | 2 to 3 years | 3 to 4 years | Over 5 years | Total | |||||
Debt | 8.1 | - | - | 600.0 | 608.1 | |||||
Capital leases | 0.2 | 1.8 | 0.9 | - | 2.9 | |||||
Operating leases | 6.3 | 9.8 | 4.5 | 8.2 | 28.8 | |||||
Purchase obligations | 62.0 | 48.1 | 26.9 | - | 137.0 | |||||
Totals | 76.6 | 59.7 | 32.3 | 608.2 | 776.8 |
The table does not include interest on debt.
As at September 30, 2014, Hellas Gold had entered into off-take agreements pursuant to which Hellas Gold agreed to sell a total of 8,325 dry metric tonnes of zinc concentrates, 7,400 dry metric tonnes of lead/silver concentrates over the next three years, and 15,480 dry metric tonnes of gold concentrate through December 31, 2014.
In April 2007, Hellas Gold agreed to sell to Silver Wheaton (Caymans) Ltd. (Silver Wheaton) all of the silver metal to be produced from ore extracted during the mine-life within an area of approximately seven square kilometres around Stratoni, up to 15 million ounces, or 20 million ounces if additional silver is processed through the Stratoni mill from areas other than the current producing mine. The sale was made in consideration of a prepayment to Hellas Gold of $57.5 million in cash, plus a fee per ounce of payable silver to be delivered to Silver Wheaton of the lesser of $3.90 and the prevailing market price per ounce. As at September 30, 2014 approximately 6.4 million ounces of silver have been delivered of the original 15 million ounce commitment.
Debt
Significant changes in our debt from that disclosed in our December 31, 2013 annual MD&A and consolidated financial statements are as follows:
Jinfeng CMB working capital loan
On January 16, 2013, Jinfeng entered into a RMB 100.0 million ($16.3 million) working capital loan with CMB. Each drawdown bears fixed interest at the prevailing lending rate stipulated by the People’s Bank of China on the date of drawdown. The Facility had a term of up to one year, from January 16, 2013 to January 15, 2014. In January 2014, the term of the facility was extended to January 28, 2015. The facility is unsecured.
During the quarter ended September 30, 2014, Jinfeng repaid the full amount under this facility and concurrently drew down RMB 50.0 million ($8.1 million) and has used the proceeds to fund working capital obligations. All tranches of the loan have a term of six months and a fixed interest rate of 5.6%.
Senior notes
On December 10, 2012, the Company completed an offering of $600.0 million senior notes (“the notes”) at par value, with a coupon rate of 6.125% due December 15, 2020. The notes pay interest semi-annually on June 15 and December 15. Net deferred financing costs of $13.3 million have been included as an offset in the balance of the notes in the financial statements and are being amortized over the term of the notes.
The fair market value of the notes as at September 30, 2014 was $600.4 million.
Entrusted loan
In November 2010, Eastern Dragon, HSBC Bank (China) and Qinghai Dachaidan Mining Ltd (“QDML”), our 90% owned subsidiary, entered into a RMB 12.0 million ($2.0 million) entrusted loan agreement, which has been increased to RMB 720.0 million ($117.0 million) through a series of amendments.
14 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
Under the terms of the entrusted loan, QDML with its own funds entrusts HSBC Bank (China) to provide a loan facility in the name of QDML to Eastern Dragon. The loan can be drawn down in tranches. Each drawdown bears interest fixed at the prevailing lending rate stipulated by the People’s Bank of China on the date of drawdown. Each draw down has a term of three months and can be rolled forward at the discretion of QDML. The interest rate on this loan as at September 30, 2014 was 4.59%.
As at September 30, 2014, RMB 647.1 million ($105.2 million) had been drawn under the entrusted loan. Subsequent to September 30, 2014, RMB 0.7 million ($0.1 million) was drawn under this loan. The entrusted loan has been recorded on a net settlement basis.
Dividends
On August 26, 2014 Eldorado paid $6.5 million in dividends to shareholders of record. Future dividend payments will be dependent on the Company having an aggregate of contributed surplus, accumulated other comprehensive income and retained earnings balance exceeding the dividend amount to be paid.
Equity
This quarter we received net proceeds of $0.4 million for issuing 60,914 common shares related to stock options and warrants being exercised.
Common shares outstanding - as of September 30, 2014 - as of October 30, 2014 |
716,309,524 716,309,524 |
Share purchase options | |
- as of October 30, 2014 (Weighted average exercise price per share: $11.70 Cdn) | 21,212,461 |
Other information
New accounting developments
The following interpretation of a standard has been adopted by the company commencing January 1, 2014:
· | IFRIC 21 ‘Levies’ – This interpretation of IAS 37, ‘Provisions, Contingent Liabilities and Contingent Assets’,applies to the accounting for levies imposed by governments. IAS 37 sets out criteria for the recognition of a liability, one of which is the requirement for the entity to have a present obligation as a result of a past event (“obligating event”). IFRIC 21 clarifies that the obligating event that gives rise to a liability to pay a levy is the activity described in the relevant legislation that triggers the payment of the levy. There was no impact on these unaudited condensed consolidated interim financial statements as a result of the adoption of this standard. |
The following standards have been published and are mandatory for Eldorado’s annual accounting periods no earlier than January 1, 2017:
· | IFRS 9‘Financial Instruments’ – This standard was published in July 2014 and replaces the existing guidance in IAS 39, ‘Financial Instruments: Recognition and Measurement’. IFRS 9 includes revised guidance on the classification and measurement of financial instruments, including a new expected credit loss model for calculating impairment on financial assets, and the new general hedge accounting requirements. It also carries forward the guidance on recognition and derecognition of financial instruments from IAS 39. IFRS 9 is effective for annual reporting periods beginning on or after January 1, 2018, with early adoption permitted. The Company is currently evaluating the extent of the impact of the adoption of this standard. |
15 |
MANAGEMENT’S DISCUSSION AND ANALYSIS for the three and nine-month periods ended September30, 2014 |
· | IFRS 15 ‘Revenue from Contracts with Customers’ – This standard contains a single model that applies to contracts with customers and two approaches to recognising revenue: at a point in time or over time. The model features a contract-based five-step analysis of transactions to determine whether, how much and when revenue is recognized. New estimates and judgmental thresholds have been introduced, which may affect the amount and/or timing of revenue recognized. This standard is effective for fiscal years ending on or after December 31, 2017. The Company does not expect this standard to have a material impact on its financial statements. |
Internal controls over financial reporting
Eldorado’s management is responsible for establishing and maintaining adequate internal control over financial reporting. Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. As a result, even those systems determined to be effective can only provide reasonable assurance regarding the preparation and presentation of our financial statements. There have been no changes in our internal control over financial reporting in the third quarter of 2014 that have materially affected, or are reasonably likely to materially affect, internal control over financial reporting.
Qualified Person
Except as otherwise noted, Norman Pitcher, P. Geo., our President, is the Qualified Person under NI 43-101 responsible for supervising the preparation of the scientific or technical information contained in this MD&A and verifying the technical data disclosed in this document relating to our operating mines and development projects.
Forward-looking information and risks
This MD&A includes statements and information about what we expect to happen in the future. When we discuss our strategy, plans and future financial and operating performance, or other things that have not yet happened in this review, we are making statements considered to beforward-looking informationor forward-looking statements under Canadian and United States securities laws. We refer to them in this document asforward-looking information.
Key things to understand about the forward-looking information in this document:
• | It typically includes words and phrases about the future, such as:plan, expect, forecast, intend, anticipate, believe, estimate, budget, scheduled, may, could, would, might, will, as well as the negative of these words and phrases. |
• | Although it represents our current views, which we consider to be reasonable, we can give no assurance that the forward-looking information will prove to be accurate. |
• | It is based on a number of assumptions, including things like the future price of gold, anticipated costs and spending, and our ability to achieve our goals. |
• | It is also subject to the risks associated with our business, including |
• | the changing price of gold and currencies, |
• | actual and estimated production and mineral reserves and resources, |
• | the speculative nature of gold exploration, |
• | risks associated with mining operations and development, |
• | regulatory and permitting risks, |
• | acquisition risks, and |
• | other risks that are set out in our Annual Information Form. |
• | If our assumptions prove to be incorrect or the risks materialize, our actual results and events may vary materially from what we currently expect. |
We recommend that you review our annual information form, which includes a more detailed discussion of material risks that could cause actual results to differ significantly from our current expectations.
Forward-looking information is designed to help you understand management’s current views of our near and longer term prospects, and it may not be appropriate for other purposes. We will not necessarily update this information unless we are required to by securities laws.
16 |