Rationalizations and Impairments (Rationalization Costs Incurred) (Details) - USD ($) $ in Thousands | 1 Months Ended | 2 Months Ended | 3 Months Ended | 7 Months Ended | 9 Months Ended |
Aug. 14, 2015 | Sep. 30, 2015 | Sep. 30, 2015 | Sep. 30, 2014 | Aug. 14, 2015 | Sep. 30, 2014 |
Predecessor | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | $ 1,087 | | | $ 19,001 | $ 11,722 | $ 57,429 |
Predecessor | Industrial Materials | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | | | | 2,696 | 33,653 |
Predecessor | Industrial Materials | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | 86 | | | 7,201 | | |
Predecessor | Engineered Solutions | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | | | | 7,300 | 20,817 |
Predecessor | Engineered Solutions | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | 876 | | | 8,841 | | |
Predecessor | Corporate, R&D and Other | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | | | | 1,726 | 2,959 |
Predecessor | Corporate, R&D and Other | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | 125 | | | 2,959 | | |
Predecessor | 2014 Engineered Solutions Rationalization | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | 79 | | | 8,193 | 280 | 18,755 |
Predecessor | 2014 Engineered Solutions Rationalization | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | 2,802 | 0 | 2,802 |
Inventory loss | 28 | | | 2,606 | 571 | 13,168 |
Fixed asset write-offs and other | 15 | | | 174 | 372 | 174 |
Predecessor | 2014 Engineered Solutions Rationalization | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | 36 | | | 2,537 | (713) | 2,537 |
Contract terminations | 0 | | | 74 | 50 | 74 |
Predecessor | Rationalization Plan | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | 3,645 | 432 | 25,323 |
Inventory loss | 55 | | | 2,930 | 942 | 14,645 |
Fixed asset write-offs and other | 164 | | | 1,474 | 2,793 | 5,513 |
Predecessor | Rationalization Plan | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 625 | | | 89 | 940 | 89 |
Predecessor | Rationalization Plan | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | 0 | | | 20 | 2,109 | 98 |
Predecessor | Rationalization Plan | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | 0 | | | 228 | 229 | 756 |
Predecessor | Rationalization Plan | Industrial Materials | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | 838 | 432 | 21,690 |
Inventory loss | 27 | | | 324 | (33) | 991 |
Fixed asset write-offs and other | 59 | | | 1,294 | 1,715 | 5,203 |
Predecessor | Rationalization Plan | Industrial Materials | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | 0 | 0 | 0 |
Predecessor | Rationalization Plan | Industrial Materials | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | 0 | | | 20 | 400 | 98 |
Predecessor | Rationalization Plan | Industrial Materials | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | 0 | | | 82 | 25 | 610 |
Predecessor | Rationalization Plan | Engineered Solutions | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | 2,807 | 0 | 3,633 |
Inventory loss | 28 | | | 2,606 | 975 | 13,654 |
Fixed asset write-offs and other | 105 | | | 180 | 1,078 | 310 |
Predecessor | Rationalization Plan | Engineered Solutions | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 461 | | | 0 | 0 | 0 |
Predecessor | Rationalization Plan | Engineered Solutions | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | 0 | | | 0 | 755 | 0 |
Predecessor | Rationalization Plan | Engineered Solutions | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | 0 | | | 146 | 204 | 146 |
Predecessor | Rationalization Plan | Corporate, R&D and Other | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | 0 | 0 | 0 |
Inventory loss | 0 | | | 0 | 0 | 0 |
Fixed asset write-offs and other | 0 | | | 0 | 0 | 0 |
Predecessor | Rationalization Plan | Corporate, R&D and Other | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 164 | | | 89 | 940 | 89 |
Predecessor | Rationalization Plan | Corporate, R&D and Other | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | 0 | | | 0 | 954 | 0 |
Predecessor | Rationalization Plan | Corporate, R&D and Other | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | 0 | | | 0 | 0 | 0 |
Predecessor | Rationalization Plan | Employee Severance | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | 243 | | | 10,615 | 4,277 | 11,005 |
Predecessor | Rationalization Plan | Employee Severance | Industrial Materials | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | 0 | | | 4,643 | 157 | 5,061 |
Predecessor | Rationalization Plan | Employee Severance | Engineered Solutions | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | 282 | | | 3,102 | 4,288 | 3,074 |
Predecessor | Rationalization Plan | Employee Severance | Corporate, R&D and Other | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | (39) | | | 2,870 | (168) | 2,870 |
Predecessor | 2013 Rationalization Initiatives | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | 108 | | | 2,512 | 2,662 | 30,378 |
Predecessor | 2013 Rationalization Initiatives | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | 838 | 432 | 22,516 |
Inventory loss | 27 | | | 324 | (33) | 1,482 |
Fixed asset write-offs and other | 71 | | | 1,300 | 1,985 | 5,334 |
Predecessor | 2013 Rationalization Initiatives | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | 0 | | | 20 | 0 | 99 |
Predecessor | 2013 Rationalization Initiatives | Industrial Materials | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | 86 | | | 2,506 | 2,236 | 28,958 |
Predecessor | 2013 Rationalization Initiatives | Industrial Materials | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | 838 | 432 | 21,690 |
Inventory loss | 27 | | | 324 | (33) | 991 |
Fixed asset write-offs and other | 59 | | | 1,294 | 1,715 | 5,203 |
Predecessor | 2013 Rationalization Initiatives | Industrial Materials | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | 0 | | | 20 | 0 | 99 |
Predecessor | 2013 Rationalization Initiatives | Engineered Solutions | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | 22 | | | 6 | 426 | 1,420 |
Predecessor | 2013 Rationalization Initiatives | Engineered Solutions | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | 0 | 0 | 826 |
Inventory loss | 0 | | | 0 | 0 | 491 |
Fixed asset write-offs and other | 12 | | | 6 | 270 | 131 |
Predecessor | 2013 Rationalization Initiatives | Engineered Solutions | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | 0 | | | 0 | 0 | 0 |
Predecessor | 2013 Rationalization Initiatives | Corporate, R&D and Other | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | 0 | | | 0 | 0 | 0 |
Predecessor | 2013 Rationalization Initiatives | Corporate, R&D and Other | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | 0 | 0 | 0 |
Inventory loss | 0 | | | 0 | 0 | 0 |
Fixed asset write-offs and other | 0 | | | 0 | 0 | 0 |
Predecessor | 2013 Rationalization Initiatives | Corporate, R&D and Other | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | 0 | | | 0 | 0 | 0 |
Predecessor | 2013 Rationalization Initiatives | Employee Severance | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | 10 | | | (52) | 253 | 338 |
Predecessor | 2013 Rationalization Initiatives | Employee Severance | Industrial Materials | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | 0 | | | (52) | 97 | 366 |
Predecessor | 2013 Rationalization Initiatives | Employee Severance | Engineered Solutions | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | 10 | | | 0 | 156 | (28) |
Predecessor | 2013 Rationalization Initiatives | Employee Severance | Corporate, R&D and Other | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | 0 | | | 0 | 0 | 0 |
Predecessor | 2013 Rationalization Initiatives | Contract Terminations | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | 0 | | | 82 | 25 | 609 |
Predecessor | 2013 Rationalization Initiatives | Contract Terminations | Industrial Materials | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | 0 | | | 82 | 25 | 609 |
Predecessor | 2013 Rationalization Initiatives | Contract Terminations | Engineered Solutions | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | 0 | | | 0 | 0 | 0 |
Predecessor | 2013 Rationalization Initiatives | Contract Terminations | Corporate, R&D and Other | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | 0 | | | 0 | 0 | 0 |
Predecessor | 2014 Corporate and Research & Development Rationalization | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | 125 | | | | 2,195 | 8,298 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | 5 | 0 | 5 |
Fixed asset write-offs and other | 0 | | | | 1 | 0 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | | 940 | 89 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | 164 | | | | 1,354 | 0 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Industrial Materials | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | 0 | | $ 4,695 | | 460 | 4,695 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Industrial Materials | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | 0 | 0 | 0 |
Fixed asset write-offs and other | 0 | | 0 | | 0 | 0 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Industrial Materials | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | 0 | | 0 | 0 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Industrial Materials | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | 0 | | 0 | | 400 | 0 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Engineered Solutions | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | 0 | | 644 | | 9 | 644 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Engineered Solutions | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | 5 | 0 | 5 |
Fixed asset write-offs and other | 0 | | 0 | | 1 | 0 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Engineered Solutions | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | 0 | | 0 | 0 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Engineered Solutions | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | 0 | | 0 | | 0 | 0 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Corporate, R&D and Other | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | 125 | | 2,959 | | 1,726 | 2,959 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Corporate, R&D and Other | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | | 0 | 0 | 0 |
Fixed asset write-offs and other | 0 | | 0 | | 0 | 0 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Corporate, R&D and Other | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | 0 | | 89 | | 940 | 89 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Corporate, R&D and Other | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | 164 | | 0 | | 954 | 0 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Employee Severance | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | (39) | | | | (100) | 8,130 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Employee Severance | Industrial Materials | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | 0 | | 4,695 | | 60 | 4,695 |
Contract terminations | 0 | | | 0 | 0 | 0 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Employee Severance | Engineered Solutions | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | 0 | | 565 | | 8 | 565 |
Contract terminations | 0 | | | 74 | 0 | 74 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Employee Severance | Corporate, R&D and Other | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | (39) | | $ 2,870 | | (168) | 2,870 |
Contract terminations | 0 | | | $ 0 | 0 | 0 |
Predecessor | 2014 Corporate and Research & Development Rationalization | Contract Terminations | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | 0 | | | | 0 | $ 74 |
Predecessor | 2015 Advanced Graphite Materials Rationalization | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | 775 | | | | 6,585 | |
Predecessor | 2015 Advanced Graphite Materials Rationalization | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Inventory loss | 0 | | | | 404 | |
Fixed asset write-offs and other | 78 | | | | 434 | |
Predecessor | 2015 Advanced Graphite Materials Rationalization | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | 461 | | | | 755 | |
Predecessor | 2015 Advanced Graphite Materials Rationalization | Employee Severance | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | 236 | | | | 4,838 | |
Contract terminations | $ 0 | | | | $ 154 | |
Successor | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | $ 1,360 | | | | |
Successor | Industrial Materials | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 186 | | | | |
Successor | Industrial Materials | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 186 | | | | |
Successor | Engineered Solutions | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 1,164 | | | | |
Successor | Engineered Solutions | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 1,164 | | | | |
Successor | Corporate, R&D and Other | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 10 | | | | |
Successor | Corporate, R&D and Other | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 10 | | | | |
Successor | 2014 Engineered Solutions Rationalization | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | (135) | | | | |
Successor | 2014 Engineered Solutions Rationalization | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Inventory loss | | 132 | | | | |
Fixed asset write-offs and other | | (267) | | | | |
Successor | 2014 Engineered Solutions Rationalization | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | | 0 | | | | |
Contract terminations | | 0 | | | | |
Successor | Rationalization Plan | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Inventory loss | | 147 | | | | |
Fixed asset write-offs and other | | 366 | | | | |
Successor | Rationalization Plan | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Successor | Rationalization Plan | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | | 211 | | | | |
Successor | Rationalization Plan | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | | 0 | | | | |
Successor | Rationalization Plan | Industrial Materials | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Inventory loss | | 15 | | | | |
Fixed asset write-offs and other | | 15 | | | | |
Successor | Rationalization Plan | Industrial Materials | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Successor | Rationalization Plan | Industrial Materials | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | | 0 | | | | |
Successor | Rationalization Plan | Industrial Materials | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | | 0 | | | | |
Successor | Rationalization Plan | Engineered Solutions | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Inventory loss | | 132 | | | | |
Fixed asset write-offs and other | | 351 | | | | |
Successor | Rationalization Plan | Engineered Solutions | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Successor | Rationalization Plan | Engineered Solutions | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | | 201 | | | | |
Successor | Rationalization Plan | Engineered Solutions | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | | 0 | | | | |
Successor | Rationalization Plan | Corporate, R&D and Other | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Inventory loss | | 0 | | | | |
Fixed asset write-offs and other | | 0 | | | | |
Successor | Rationalization Plan | Corporate, R&D and Other | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Successor | Rationalization Plan | Corporate, R&D and Other | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | | 10 | | | | |
Successor | Rationalization Plan | Corporate, R&D and Other | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | | 0 | | | | |
Successor | Rationalization Plan | Employee Severance | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | | 636 | | | | |
Successor | Rationalization Plan | Employee Severance | Industrial Materials | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | | 156 | | | | |
Successor | Rationalization Plan | Employee Severance | Engineered Solutions | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | | 480 | | | | |
Successor | Rationalization Plan | Employee Severance | Corporate, R&D and Other | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | | 0 | | | | |
Successor | 2013 Rationalization Initiatives | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 186 | | | | |
Successor | 2013 Rationalization Initiatives | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Inventory loss | | 15 | | | | |
Fixed asset write-offs and other | | 15 | | | | |
Successor | 2013 Rationalization Initiatives | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | | 0 | | | | |
Successor | 2013 Rationalization Initiatives | Industrial Materials | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 186 | | | | |
Successor | 2013 Rationalization Initiatives | Industrial Materials | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Inventory loss | | 15 | | | | |
Fixed asset write-offs and other | | 15 | | | | |
Successor | 2013 Rationalization Initiatives | Industrial Materials | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | | 0 | | | | |
Successor | 2013 Rationalization Initiatives | Engineered Solutions | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 0 | | | | |
Successor | 2013 Rationalization Initiatives | Engineered Solutions | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Inventory loss | | 0 | | | | |
Fixed asset write-offs and other | | 0 | | | | |
Successor | 2013 Rationalization Initiatives | Engineered Solutions | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | | 0 | | | | |
Successor | 2013 Rationalization Initiatives | Corporate, R&D and Other | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 0 | | | | |
Successor | 2013 Rationalization Initiatives | Corporate, R&D and Other | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Inventory loss | | 0 | | | | |
Fixed asset write-offs and other | | 0 | | | | |
Successor | 2013 Rationalization Initiatives | Corporate, R&D and Other | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | | 0 | | | | |
Successor | 2013 Rationalization Initiatives | Employee Severance | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | | 156 | | | | |
Successor | 2013 Rationalization Initiatives | Employee Severance | Industrial Materials | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | | 156 | | | | |
Successor | 2013 Rationalization Initiatives | Employee Severance | Engineered Solutions | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | | 0 | | | | |
Successor | 2013 Rationalization Initiatives | Employee Severance | Corporate, R&D and Other | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | | 0 | | | | |
Successor | 2013 Rationalization Initiatives | Contract Terminations | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | | 0 | | | | |
Successor | 2013 Rationalization Initiatives | Contract Terminations | Industrial Materials | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | | 0 | | | | |
Successor | 2013 Rationalization Initiatives | Contract Terminations | Engineered Solutions | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | | 0 | | | | |
Successor | 2013 Rationalization Initiatives | Contract Terminations | Corporate, R&D and Other | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 10 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Fixed asset write-offs and other | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | | 10 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Industrial Materials | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Industrial Materials | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Fixed asset write-offs and other | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Industrial Materials | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Industrial Materials | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Engineered Solutions | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Engineered Solutions | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Fixed asset write-offs and other | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Engineered Solutions | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Engineered Solutions | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Corporate, R&D and Other | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 10 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Corporate, R&D and Other | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Fixed asset write-offs and other | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Corporate, R&D and Other | Research and Development | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Accelerated depreciation | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Corporate, R&D and Other | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | | 10 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Employee Severance | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Employee Severance | Industrial Materials | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | | 0 | | | | |
Contract terminations | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Employee Severance | Engineered Solutions | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | | 0 | | | | |
Contract terminations | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Employee Severance | Corporate, R&D and Other | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | | 0 | | | | |
Contract terminations | | 0 | | | | |
Successor | 2014 Corporate and Research & Development Rationalization | Contract Terminations | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Contract terminations | | 0 | | | | |
Successor | 2015 Advanced Graphite Materials Rationalization | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Total rationalization plan and related charges | | 1,299 | | | | |
Successor | 2015 Advanced Graphite Materials Rationalization | Cost of Sales | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Inventory loss | | 0 | | | | |
Fixed asset write-offs and other | | 618 | | | | |
Successor | 2015 Advanced Graphite Materials Rationalization | Selling and Administrative | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Other | | 201 | | | | |
Successor | 2015 Advanced Graphite Materials Rationalization | Employee Severance | Rationalizations | | | | | | |
Restructuring Cost and Reserve [Line Items] | | | | | | |
Severance and related costs | | 480 | | | | |
Contract terminations | | $ 0 | | | | |