1 | | DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF May 12, 2008 | | |
|
| | | | | | | | | | | | | | | | | | |
RECENT COMMITMENTS — (See Body of Report For Contract Details/Date Changes and Other Information) |
|
Ocean Ambassador | One well with Walter in GOM |
| | | | | | | | | | | | Dayrate | | | | Est. End | | |
Rig Name | | WD | | Location | | Status | | Operator | | Current Term | | (000s) | | Start Date | | Date | | Future Contracts and Other Information* |
|
Domestic Deepwater Semisubmersibles (8) |
Ocean Quest | | 3,500’ | | GOM | | Contracted | | Noble | | two year term + option | | upper 350’s | | mid June 2007 | | mid June 2009 | | Available; actively marketing. |
Ocean Star | | 5,500’ | | GOM | | Contracted | | Anadarko | | term extension | | upper 410’s | | late Nov. 2007 | | late Nov. 2008 | | Available; actively marketing. |
Ocean America | | 5,500’ | | GOM | | Contracted | | Mariner | | term | | upper 460’s | | mid March 2008 | | early July 2009 | | Available, actively marketing. |
Ocean Valiant | | 5,500’ | | GOM | | Contracted | | Anadarko | | one year term extension | | upper 420’s | | mid March 2008 | | mid June 2009 | | One-year term extension interrupted forspecial survey and maintenance expected to begin mid July and end mid Oct. 2008. Available; actively marketing. |
Ocean Victory | | 5,500’ | | GOM | | Contracted | | Murphy | | completion Murphy contract | | upper 330’s | | late July 2007 | | mid Aug. 2008 | | Callon and Newfield have swapped slots. Next up is now two wells with Callon in low 500’s beginning mid Aug. 2008 and ending early Feb. 2009; followed by one well with Newfield in low 300’s (swap from old Voyager contract in low 300’s) beginning early Feb. 2009 and ending early April 2009; followed by one well extension with Newfield plus option in low 500’s beginning early April 2009 and ending late May 2009. Available; actively marketing. |
Ocean Baroness | | 7,000’ | | GOM | | Contracted | | Hess | | three year term extension +option | | mid 360’s | | late Nov. 2007 | | late Nov. 2009 | | Available; actively marketing. |
Ocean Confidence | | 7,500’ | | GOM | | Contracted | | Murphy | | four year term + option | | low 500’s | | late Feb. 2008 | | mid March 2012 | | Thruster maintenance early Oct. to mid Oct. 2008. Available. |
Ocean Endeavor | | 10,000’ | | GOM | | Contracted | | Devon | | four year term + option | | mid 260’s | | early July 2007 | | late June 2011 | | Available. |
|
Domestic 2nd/3rd Generation Semisubmersibles (2) |
Ocean Ambassador | | 1,100’ | | GOM | | Contracted | | Apache | | one well | | mid 270’s | | early April 2008 | | mid May 2008 | | One well with Walter in mid $220’s beginning mid-May and ending late June 2008;followed by5-year survey and maintenance late June to mid Sept. 2008. Available; actively marketing. |
Ocean Saratoga | | 2,200’ | | GOM | | Contracted | | LLOG | | six month term + option | | low 300’s | | late Oct. 2007 | | mid June 2008 | | Available; actively marketing. |
|
Domestic Jackups (7) |
Ocean Crusader | | 200’ MC | | GOM | | Contracted | | Apache | | three wells + option | | low 60’s | | early March 2008 | | mid May 2008 | | One well extension plusoptionwith Apache in low 60’s beginning mid May and ending mid July 2008. Available; actively marketing. |
Ocean Drake | | 200’ MC | | GOM | | Contracted | | Walter | | one well | | low 60’s | | early May 2008 | | late June 2008 | | 5-year survey and maintenance beginning late June and ending mid August 2008. Available; actively marketing. |
Ocean Champion | | 250’ MS | | GOM | | Contracted | | Bois d’Arc | | 90-day term + option | | high 50’s | | late April 2008 | | early July 2008 | | Available; actively marketing. |
Ocean Spartan | | 300’ IC | | GOM | | Contracted | | Apache | | one well | | low 80’s | | mid April 2008 | | late May 2008 | | Four wells plusoptionwith Samson in mid 80’s beginning late May and ending late Aug. 2008. Available; actively marketing. |
Ocean Summit | | 300’ IC | | GOM | | Contracted | | Energy Partners | | one well extension + option | | mid 80’s | | late April 2008 | | late May 2008 | | Available; actively marketing. |
Ocean Titan | | 350’ IC | | GOM | | Contracted | | Apache | | two wells | | mid 80’s | | mid Feb. 2008 | | lateMay 2008 | | Three wells plusoptionwith Apache in low 100’s, mid 100’s and low 110’s, respectively, beginninglateMay and ending early Oct. 2008. Available; actively marketing. |
Ocean Tower | | 350’ IC | | GOM | | Contracted | | Chevron | | 90-day extension plus option | | mid 100’s | | late April 2008 | | late July 2008 | | Available; actively marketing. |
| | | | |
2 | | DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF May 12, 2008 | | |
| | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | Dayrate | | | | Est. End | | |
Rig Name | | WD | | Location | | Status | | Operator | | Current Term | | (000s) | | Start Date | | Date | | Future Contracts and Other Information* |
|
International Semisubmersibles (19) |
|
MEXICO | | | | | | | | | | | | | | | | | | |
Ocean New Era | | 1,500’ | | Mexico | | Contracted | | PEMEX | | 2 1/2-year term | | mid 260’s | | late Oct. 2007 | | mid Feb. 2010 | | Available. |
Ocean Voyager | | 3,000’ | | Mexico | | Contracted | | PEMEX | | 2-1/2 year term | | mid 330’s | | early Nov. 2007 | | late Feb. 2010 | | Available. |
NORTH SEA/MED | | | | | | | | | | | | | | | | | | |
Ocean Nomad | | 1,200’ | | North Sea | | Contracted | | Talisman | | 18-month extension | | mid 280’s | | early Feb. 2007 | | early Oct. 2008 | | Survey and maintenance beginning mid Aug. 2008 and ending early Oct.2008; followed by resumption of Talisman extension ending early Oct. 2008; followed by two-year term extension with Talisman in mid 330’s beginning early Oct. 2008 and ending early Oct. 2010. Available; actively marketing. |
Ocean Guardian | | 1,500’ | | North Sea | | Contracted | | Oilexco | | two year term | | low 350’s | | early June 2007 | | mid July 2009 | | Intermediate survey and maintenance early July to mid Aug. 2008. Two-year extension with Oilexco in mid 380’s beginning mid July 2009 and ending mid July 2011. Available; actively marketing. |
Ocean Princess | | 1,500’ | | North Sea | | Contracted | | Talisman | | two year term extension | | upper 330’s | | mid Feb. 2008 | | mid April 2010 | | 5-year survey and maintenance beginning late July and ending late Sept. 2008. Available; actively marketing. |
Ocean Vanguard | | 1,500’ | | North Sea | | Contracted | | Statoil | | two year extension plus option | | low 400’s | | late April 2008 | | mid April 2010 | | Available; actively marketing. |
Ocean Lexington | | 2,200’ | | Egypt | | Contracted | | BP | | 36 month term | | mid 260’s | | late Nov. 2006 | | mid Aug. 2009 | | Available; actively marketing. |
AUSTRALASIA | | | | | | | | | | | | | | | | | | |
Ocean Bounty | | 1,500’ | | Australia | | Contracted | | Chevron | | sublet from Woodside | | low 350’s | | early Feb. 2008 | | late July2008 | | Special Survey beginning late July 2008 and ending mid Aug. 2008;followed by remainder of one-year term with Woodside in low 350’s beginning midAug. 2008 and ending mid March 2009; followed by 240-day re-engine and upgrade ending mid Nov. 2009; followed by two year extension from Woodside in Australia in mid 420’s beginning mid Nov. 2009 and ending mid Nov. 2011. Available; actively marketing. |
Ocean Patriot | | 1,500’ | | Australia | | Contracted | | Anzon | | one well | | low 350’s | | early March 2008 | | mid May 2008 | | Remainder of Santos term plus option in high 370’s beginning mid May 2008 and ending late Dec. 2008; followed by two-year term contract in Australia at a dayrate between 380,000 and 420,000*** with Apache, plus option, beginning late Dec. 2008 and ending late Dec. 2010. Available; actively marketing. |
Ocean Epoch | | 1,640’ | | Australia | | Contracted | | Apache | | one-year term | | low 350’s | | early March 2008 | | early March 2009 | | 550-day term contract in Australia in low 350’s with BHPB, plus option, beginning early March 2009 and ending early Sept. 2010. Available; actively marketing. |
Ocean General | | 2,400 | | Indonesia | | Contracted | | Inpex | | one well | | mid 170’s | | late Feb. 2008 | | early June 2008 | | 5-year survey and maintenance beginning early June and ending late July 2008; followed by approximately 730 day’s work plus option in Vietnam with PVEP in low 280’s beginning late 2008 and ending late July 2010. Available; actively marketing. |
Ocean Rover | | 7,000’ | | Malaysia | | Contracted | | Murphy | | balance of previously declared batch setting and option wells | | high 240’s | | late Feb. 2008 | | early Jan. 2009 | | Program interrupted by single deepwater well in low 350’s beginning mid July and ending late July;followed by UWILD survey and maintenance beginning late July 2008 and ending early Sept.; followed by balance of previously declared option wells in high 240’s beginning early Sept. and ending early Jan. 2009; followed by one well with Newfield in Malaysia in low 450’s beginning early Jan. 2009 and ending mid Feb. 2009; followed by two-year term with Murphy in Malaysia in low 450’s beginning mid Feb. 2009 and ending mid Feb. 2011. Available; actively marketing. |
| | | | |
3 | | DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF May 12, 2008 | | |
| | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | Dayrate | | | | Est. End | | |
Rig Name | | WD | | Location | | Status | | Operator | | Current Term | | (000s) | | Start Date | | Date | | Future Contracts and Other Information* |
|
BRAZIL/TRINIDAD | | | | | | | | | | | | | | | | | | |
Ocean Whittington | | 1,500’ | | Brazil | | Contracted | | Petrobras | | five year term plus potential bonus | | mid 220’s | | late Aug. 2007 | | late Aug. 2012 | | Resume and complete contract upgrade work beginning early Oct. 2008 and ending late Nov. 2008; followed by resumption of five year term in mid 220’s plus potential 15% performance bonus. Available. |
Ocean Concord | | 2,200’ | | Brazil | | Contracted | | Petrobras | | five year term plus potential bonus | | low 230’s | | mid Jan. 2008 | | mid Jan. 2013 | | Available. |
Ocean Yorktown | | 2,850’ | | Mobe to Brazil | | Contracted | | DODI | | mobe and acceptance test for Brazil | | — | | — | | late July 2008 | | Five-year term contract with Petrobras in Brazil in mid 230’s plus lump sum mobe and potential 15% bonus beginning in late July 2008 and ending in late July 2013. Available. |
Ocean Yatzy | | 3,300’ | | Brazil | | Contracted | | Petrobras | | four year extension plus potential bonus | | mid 110’s | | early Oct. 2005 | | early Oct. 2009 | | Five-year term extension in mid 240’s plus potential 10% performance bonus beginning early Oct. 2009 and ending early Oct. 2014. Available. |
Ocean Winner | | 3,500’ | | Brazil | | Contracted | | Petrobras | | four year extension plus potential bonus | | low 110’s | | mid Mar. 2006 | | mid Mar. 2010 | | Five-year term extension in low 270’s plus potential 10% performance bonus beginning mid Mar. 2010 and ending mid Mar. 2015. Available. |
Ocean Worker | | 3,500’ | | Trinidad | | Contracted | | Petro-Canada | | six-month term | | low 450’s | | mid Nov. 2007 | | mid July2008 | | Lump sum mobe to Brazil plus subsequent acceptance test beginningmid July2008 and endinglate Oct. 2008; followed by six-year term contract with Petrobras in low 270’s plus potential 10% performance bonus beginninglate Oct. 2008 and endinglate Oct. 2014. Available. |
| | | | | | | | | | | | | | | | | | |
Ocean Alliance | | 5,000’ | | Brazil | | Contracted | | Petrobras | | four year extension plus potential bonus | | mid 150’s | | mid Jan. 2008 | | early Sept. 2009 | | Six-year term extension in low 340’s plus potential 15% performance bonus beginning early Sept. 2009 and ending early Sept. 2015. Available. |
|
International Drillships (1) |
Ocean Clipper | | 7,500’ | | Brazil | | Contracted | | Petrobras | | five-year extension plus potential bonus | | low 180’s | | mid Dec. 2005 | | mid Dec. 2010 | | Resume five year extension in low 180’s plus potential 5% performance bonus ending mid Dec. 2010. Available. |
|
International Jackups (6) |
Ocean Columbia | | 250’ IC | | Mexico | | Contracted | | Pemex | | 1-1/2 year term | | mid 120’s | | late Jan. 2008 | | mid June 2009 | | Available; actively marketing. |
Ocean Nugget | | 300’ IC | | Mexico | | Contracted | | Pemex | | term contract | | upper 160’s | | early Oct 2006 | | late Mar. 2009 | | Available; actively marketing. |
Ocean King | | 300’ IC | | Croatia | | Contracted | | CROSCO | | two year bareboat charter | | upper 100’s | | mid Nov. 2007 | | early Nov. 2009 | | Available; actively marketing. |
Ocean Sovereign | | 300’ IC | | Indonesia | | Contracted | | Kodeco | | 18-month term +option | | mid 90’s | | mid Oct. 2006 | | earlyJune2008 | | Extension up to survey in mid 120’s; followed byintermediate survey mid July to early Aug. 2008; followed by 18-month term extension with Kodeco in mid 140’s beginningearly Aug.2008 and endingearly Feb. 2010. Available; actively marketing. |
Ocean Heritage | | 300’ IC | | UAE | | — | | DODI | | hot stacked | | — | | — | | — | | Available; actively marketing. |
Ocean Spur | | 300’ IC | | Egypt | | Contracted | | Gaz de France | | one well | | low 190’s | | late March 2008 | | early June2008 | | One well with British Gas in Egypt in mid 130’s beginningearly Juneand ending inmid Aug.2008; followed by one-year term with WEPCO in low 140’s in Egypt beginningmid Aug.2008 and endingmid Aug.2009. Available; actively marketing. |
| | | | |
4 | | DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF May 12, 2008 | | |
| | | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | Dayrate | | | | Est. End | | |
Rig Name | | WD | | Location | | Status | | Operator | | Current Term | | (000s) | | Start Date | | Date | | Future Contracts and Other Information* |
|
Upgrade (1) | | | | | | | | | | | | | | | | | | |
Ocean Monarch | | 2,200’ | | Shipyard | | — | | DODI | | — | | — | | — | | — | | Singapore shipyard for upgrade to 10,000 ft. capable 5th Generation rig. Estimated completion, including commissioning and commencement of mobe to GOM, late fourth quarter 2008; followed by completion of mobe to GOM and rig prep ending late Feb. 2009; followed by four-year term, plus option, with Anadarko in the GOM in the upper 420’s beginning late Feb. 2009 and ending late Feb. 2013. Available. |
|
Newbuild Rigs Under Construction (2) | | | | | | | | |
Ocean Shield | | 350’ IC | | Commissioning | | — | | DODI | | — | | — | | — | | — | | Commissioning, followed by mobe to Malaysia ending late May 2008; followed by LOI for five-month term in Malaysia in mid 170’s beginning late May and ending late Oct. 2008; followed by mobe to Australia for one-year term with ENI in mid 260’s beginning mid Nov. 2008 and ending late Oct. 2009. Available; actively marketing. |
Ocean Scepter | | 350’ IC | | Shipyard | | — | | DODI | | — | | — | | — | | — | | Brownsville shipyard completion, commissioning; followed by mobe to international destination and 300-day term contract plusoptionin high 190’s beginning in third quarter 2008. Available; actively marketing. |
NOTES: *Generally, rig utilization rates approach 95-98% during contracted periods; however, utilization rates can be adversely impacted by additional downtime due to unscheduled repairs and maintenance, weather conditions and other factors.**An LOI is subject to customary conditions, including the execution of a definitive agreement, andas such may not result in a binding contract. Options are un-priced and any extension of contract is subject to mutually agreeable terms and conditions unless otherwise indicated. Indexed contracts generally reprice every 30 days. Mobe revenues (if any) and mobe expenses are deferred, and generally are amortized over the life of the contract. GOM = Gulf of Mexico. ***Dayrate range disclosed pursuant to terms of contract.
| | | | |
5 | | DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF May 12, 2008 | | |
EXPECTED DOWNTIME LONGER THAN ONE WEEK (Subject to Change)
| | | | | | | | | | | | | | | | | | |
Expected 1-April - 31-Dec. 2008 Down Days | | | | | | # Days | | | | | | |
|
Rig | | Q2 | | Q3 | | Q4 | | Total | | Comments |
|
Shipyard Time | | | | | | | | | | | | | | | | | | |
Yorktown | | | 91 | | | | 25 | | | | | | | | 116 | | | Complete life extension/5-yr. survey, Brazil mobe, accpt. test |
Bounty | | | | | | | 41 | | | | | | | | 41 | | | 5-year survey and maintenance |
Nomad | | | | | | | 44 | | | | 8 | | | | 52 | | | 5-year survey and maintenance |
Drake | | | | | | | 51 | | | | | | | | 51 | | | 5-year survey and maintenance |
Rover | | | | | | | 47 | | | | | | | | 47 | | | 5-year survey and maintenance |
General | | | 30 | | | | 22 | | | | | | | | 52 | | | 5-year survey and maintenance |
Princess | | | | | | | 58 | | | | | | | | 58 | | | 5-year survey and maintenance |
Ambassador | | | 4 | | | | 77 | | | | | | | | 81 | | | 5-year survey and maintenance |
Guardian | | | | | | | 43 | | | | | | | | 43 | | | North Sea intermediate survey and maintenance |
Valiant | | | | | | | 78 | | | | 18 | | | | 96 | | | 5-year survey/replace derrick and other maintenance |
|
| | | 125 | | | | 486 | | | | 26 | | | | 637 | | | |
Other Downtime | | | | | | | | | | | | | | | | | | |
Clipper | | | 40 | | | | | | | | | | | | 40 | | | Equipment repair |
Whittington | | | | | | | | | | | 51 | | | | 51 | | | Complete contract upgrade |
Sovereign | | | | | | | 19 | | | | | | | | 19 | | | Intermediate survey and install new top drive system |
Worker | | | 42 | | | | 62 | | | | | | | | 104 | | | Mobe to Brazil, prep for contract, contract acceptance testing |
Confidence | | | | | | | | | | | 18 | | | | 18 | | | Change out thruster |
|
| | | 82 | | | | 81 | | | | 69 | | | | 232 | | | |
|
Remaining Total 2008 Non-New-build/Upgrade | | | 207 | | | | 567 | | | | 95 | | | | 869 | | | |
| | | | | | | | | | | | | | | | | | |
|
New-build/Upgrade Downtime | | | Q2 | | | | Q3 | | | | Q4 | | | Total | | |
|
Shield | | | 56 | | | | | | | | | | | | 56 | | | Complete construction, commissioning, mobe to Malaysia |
Shield | | | | | | | | | | | 22 | | | | 22 | | | Mobe to Australia |
Scepter | | | 61 | | | | | | | | | | | | 61 | | | Complete construction, commissioning |
Scepter | | | ?? | | | | ?? | | | | | | | | 0 | | | Mobe to ?? |
Monarch | | | 91 | | | | 92 | | | | 92 | | | | 275 | | | Complete upgrade, commissioning, begin mobe to U.S. GOM |
|
| | | | | | | | | | | | | | | | | | |
Other Non-Survey/Non-Equipment Downtime | | | | | | | | | | | | | | | | | | |
Heritage | | | ?? | | | | | | | | | | | | ?? | | | Hot stacked (Down 42 days as of May 12, 2008 — Actively Marketing) |
|
2009 Estimated Downtime:
5-year Surveys: Concord (51 days); America (75 days); Champion (35 days); Titan (35 days); Yatzy (42 days)
Intermediate Surveys: (10 days each): Crusader, Summit, Nugget, Heritage, Alliance
Other: Bounty (240 days repower rig and water depth upgrade); Confidence (14-day thruster changeout); Monarch (60 days complete mobe to GOM and rig prep).
NOTE: *Generally, rig utilization rates approach 95-98% during contracted periods
Forward-Looking Statements: The rig status report may contain “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Forward-looking statements include, without limitation, any statement that may project, indicate or imply future results, events, performance or achievements, and may
| | | | |
6 | | DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF May 12, 2008 | | |
contain or be identified by the words “expect,” “intend,” “plan,” “predict,” “anticipate,” “estimate,” “believe,” “should,” “could,” “may,” “might,” “will,” “will be,” “will continue,” “will likely result,” “project,” “budget,” “forecast,” and similar expressions. Statements by the Company in the rig status report that contain forward-looking statements include, but are not limited to, statements regarding the current term, future dayrates, start and end dates and comments concerning future contracts and availability, letters of intent, utilization, surveys, downtime and other aspects of the Company’s drilling rigs, as well as statements concerning rigs being upgraded or to be upgraded and rigs under construction. Such statements are inherently subject to a variety of assumptions, risks and uncertainties that could cause actual results to differ materially from those anticipated or projected. A discussion of the risk factors that could impact these areas and the Company’s overall business and financial performance can be found in the Company’s reports and other documents filed with the Securities and Exchange Commission. These factors include, among others, general economic and business conditions, operating risks, casualty losses, industry fleet capacity, changes in foreign and domestic oil and gas exploration and production activity, competition, changes in foreign, political, social and economic conditions, regulatory initiatives and compliance with governmental regulations, customer preferences and various other matters, many of which are beyond the Company’s control. Given these concerns, investors and analysts should not place undue reliance on forward-looking statements. Each forward-looking statement speaks only as of the date of the rig status report, and the Company undertakes no obligation to publicly update or revise any forward-looking statement.