Exhibit 99.1
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
December 15, 2008
December 15, 2008
RECENT COMMITMENTS — (See Body of Report For Contract Details/Date Changes and Other Information)
Rig Name | WD | Location | Status | Operator | Current Term | Dayrate ($000s) | Start Date | Est. End Date | ||||||||||||
Domestic Deepwater Semisubmersibles (8) | ||||||||||||||||||||
Ocean Quest | 3,500’ | GOM | Current Contract | Noble | two-year term + unpricedoption | upper 350’s | mid June 2007 | midJanuary2009 | ||||||||||||
GOM/Brazil | Prep, mobe & acceptance test for ENI Brasil/OGX | ENI/OGX | 0 | midJanuary2009 | mid April2009 | |||||||||||||||
Brazil | Future Contract | ENI Brasil | 150 day assignment from Noble | mid 380’s | mid April 2009 | mid Sept. 2009 | ||||||||||||||
Brazil | Future Contract | OGX | two-year term + unpricedoption | low 420’s | mid Sept. 2009 | mid Sept. 2011 | ||||||||||||||
Ocean Star | 5,500’ | GOM | Current Contract | Anadarko | term extension | upper 410’s | early Nov. 2007 | late Dec. 2008 | ||||||||||||
GOM | Future Contract (swap from oldVictory/ Voyager contract in low 300’s) | Newfield | one well | low 300’s | late Dec. 2008 | early March2009 | ||||||||||||||
GOM | Future Contract (swap fromVictory contract) | Newfield | one well extension | low 500’s | early March2009 | midApril 2009 | ||||||||||||||
Ocean America | 5,500’ | GOM | Current Contract | Mariner | term | mid 460’s | late Oct. 2008 | mid July 2009 | ||||||||||||
GOM | Special Survey & Maintenance | DODI | 0 | early Jan. 2009 | mid April 2009 | |||||||||||||||
GOM | Future Contract | Mariner | 1-year term; convertible to 6-month term (ending Jan. 2010) in low 550’s w/notice by 1-Feb. 09 | low 530’s | mid July 2009 | mid July 2010 | ||||||||||||||
Ocean Valiant | 5,500’ | GOM | Current Contract | Anadarko | one-year term extension | upper 420’s | mid Dec. 2008 | late July 2009 | ||||||||||||
Mobe | Lump sum mobe | DODI | late July 2009 | late Sept. 2009 | ||||||||||||||||
Angola | Future Contract | Total | two-year term + priced options | low 620’s | late Sept. 2009 | late Sept. 2011 | ||||||||||||||
Ocean Victory | 5,500’ | GOM | Current Contract | Callon | two wells | low 500’s | mid Aug. 2008 | Customer now plans 1 well instead of 2; contract resolution pending | ||||||||||||
GOM | Future Contract | ATP | one-year term, minimum | low 540’s | mid March 2009 | mid March 2010 | ||||||||||||||
Ocean Baroness | 7,000’ | GOM | Current Contract | Hess | term extension +unpricedoption | mid 360’s | late Nov. 2007 | mid April 2010 | ||||||||||||
Ocean Confidence | 10,000’ | GOM | Current Contract | Murphy | four-year term + unpricedoption | low 500’s | late Feb. 2008 | late March 2012 | ||||||||||||
Ocean Endeavor | 10,000’ | GOM | Current Contract | Devon | four-year term + unpriced option | mid 290’s | early July 2007 | late June 2011 | ||||||||||||
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
December 15, 2008
December 15, 2008
Rig Name | WD | Location | Status | Operator | Current Term | Dayrate ($000s) | Start Date | Est. End Date | ||||||||||||
Domestic 2nd and 3rd Generation Semisubmersibles (2) | ||||||||||||||||||||
Ocean Ambassador | 1,100’ | GOM | Special Survey & Maintenance (storm delayed) | DODI | 0 | early Aug. 2008 | late Dec.2008 | |||||||||||||
GOM | Future Contract | Taylor | seven-month term | mid 280’s | late Dec. 2008 | mid May2009 | ||||||||||||||
GOM/Brazil | Prep, mobe & acceptance test for OGX | OGX | 0 | mid May2009 | earlySept. 2009 | |||||||||||||||
Brazil | Future Contract | OGX | three-year term + unpricedoption | low 260’s | earlySept. 2009 | earlySept. 2012 | ||||||||||||||
Ocean Saratoga | 2,200’ | GOM | Current Contract | Walter | four wells | mid 280’s | early Dec. 2008 | early May2009 | ||||||||||||
GOM | Future Contract | Taylor | 16-month term + option | mid 280’s | early May2009 | mid July 2010 | ||||||||||||||
Domestic Jack-ups (7) | ||||||||||||||||||||
Ocean Crusader | 200’ MC | GOM | Current Contract | Walter | two wells | mid 70’s | mid Oct. 2008 | early Feb. 2009 | ||||||||||||
Ocean Drake | 200’ MC | GOM | Current Contract | Tarpon | one well | mid 60’s | late Oct. 2008 | midDec. 2008 | ||||||||||||
GOM | Future Contract | Tarpon | two wells | mid 70’s | midDec. 2008 | midFeb. 2009 | ||||||||||||||
Ocean Champion | 250’ MS | GOM | Current Contract | Stone | six months + unpricedoption | low 70’s | late Oct. 2008 | late April 2009 | ||||||||||||
Ocean Spartan | 300’ IC | GOM | Current Contract | Samson | two-well extension, part 1 | low 100’s | early Nov. 2008 | mid Dec. 2008 | ||||||||||||
GOM | Future Contract | Samson | two-well extension, part 2 | low 120’s | mid Dec. 2008 | midFeb. 2009 | ||||||||||||||
Ocean Summit | 300’ IC | GOM | Current Contract | Energy Partners | five-wells + unpricedoption | low 100’s | mid Nov. 2008 | early Jan. 2009 | ||||||||||||
Ocean Titan | 350’ IC | GOM | Current Contract | Apache | third of three wells | low 110’s | mid Nov. 2008 | early Jan. 2009 | ||||||||||||
GOM | Future Contract | Apache | four-month extension + unpricedoption | low 130’s | early Jan. 2009 | early March2009 | ||||||||||||||
GOM | Special Survey and Maintenance | DODI | 0 | early March 2009 | mid April 2009 | |||||||||||||||
GOM | Future Contract | Apache | resume four-month extension | low 130’s | mid April 2009 | mid June 2009 | ||||||||||||||
Ocean Tower | 350’ IC | GOM | Hurricane Ike Repairs | DODI | mid Oct. 2008 | early Oct. 2009 | ||||||||||||||
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
December 15, 2008
December 15, 2008
Rig Name | WD | Location | Status | Operator | Current Term | Dayrate ($000s) | Start Date | Est. End Date | ||||||||||||
International Semisubmersibles (19) | ||||||||||||||||||||
MEXICO | ||||||||||||||||||||
Ocean New Era | 1,500’ | GOM | Current Contract | PEMEX | 2 1/2 year term | mid 260’s | late Oct. 2007 | mid Feb. 2010 | ||||||||||||
Ocean Voyager | 3,000’ | GOM | Current Contract | PEMEX | 2 1/2 year term | mid 330’s | early Nov. 2007 | late Feb. 2010 | ||||||||||||
NORTH SEA/MEDITERRANEAN | ||||||||||||||||||||
Ocean Nomad | 1,200’ | North Sea | Current Contract | Talisman | resume two-year term extension | mid 330’s | late Oct. 2008 | late Sept. 2010 | ||||||||||||
Ocean Guardian | 1,500’ | North Sea | Current Contract | Oilexco | remainder two-year term | low 350’s | early Sept. 2008 | mid July 2009 | ||||||||||||
North Sea | Future Contract | Oilexco | two-year term extension | mid 380’s | mid July. 2009 | early Sept. 2011 | ||||||||||||||
Ocean Princess | 1,500’ | North Sea | Contract interrupted for Special Survey & Maintenance | DODI | 0 | late Oct. 2008 | late Dec. 2008 resume contract | |||||||||||||
North Sea | Current Contract | Talisman | resume two-year term extension | upper 330’s | late Dec. 2008 | mid April 2010 | ||||||||||||||
Ocean Vanguard | 1,500’ | North Sea | Current Contract | Statoil | two-year term extension + unpricedoption | mid 400’s | late April 2008 | mid April 2010 | ||||||||||||
Ocean Lexington | 2,200’ | Egypt | Current Contract | BP | 36-month term | mid 260’s | late Nov. 2006 | mid Aug.2009 | ||||||||||||
Egypt/Brazil | Prep, mobe & acceptance test for OGX | OGX | 0 | mid Aug. 2009 | late Jan. 2010 | |||||||||||||||
Brazil | Future Contract | OGX | three-year term + unpricedoption | mid 330’s | late Jan. 2010 | late Jan. 2013 | ||||||||||||||
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
December 15, 2008
December 15, 2008
Rig Name | WD | Location | Status | Operator | Current Term | Dayrate ($000s) | Start Date | Est. End Date | ||||||||||||
AUSTRALASIA | ||||||||||||||||||||
Ocean Bounty | 1,500’ | Australia | Current Contract | Woodside | continue one-year term | low 350’s | early Sept. 2008 | late March 2009 | ||||||||||||
Australia | Future Contract | Woodside | 60 days | mid 380’s | late March 2009 | late May 2009 | ||||||||||||||
Australia | Re-engine and upgrade | DODI | 0 | late May 2009 | to be determined followed by two-year term | |||||||||||||||
Australia | Future Contract | Woodside | two-year term | mid 420’s | to be determined | to be determined | ||||||||||||||
Ocean Patriot | 1,500’ | Australia | Current Contract | Apache | one-year term | upper 370’s | mid May 2008 | late Dec. 2008 | ||||||||||||
Australia | Future Contract | Apache | two-year term + unpricedoption | between 380-420 | late Dec. 2008 | late Dec. 2010 | ||||||||||||||
Ocean Epoch | 1,640’ | Australia | Current Contract | Apache | one-year term | mid 350’s | early March 2008 | early March 2009 | ||||||||||||
Australia | Future Contract | BHPB | 550-day term + unpricedoptions | low 350’s | early March 2009 | early Sept. 2010 | ||||||||||||||
Ocean General | 2,400’ | Vietnam | Current Contract | PVEP | Approx. two-year term + unpricedoptions | low 280’s | mid Oct. 2008 | late Oct. 2010 | ||||||||||||
Ocean Rover | 7,000’ | Malaysia | Current Contract | Murphy | balance previously declared option wells | high 240’s | mid Oct. 2008 | late Jan. 2009 | ||||||||||||
Malaysia | Future Contract | Newfield | one well | low 450’s | late Jan. 2009 | mid March 2009 | ||||||||||||||
Malaysia | Future Contract | Murphy | two-year term extension | low 450’s | mid March 2009 | mid March 2011 | ||||||||||||||
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
December 15, 2008
December 15, 2008
Rig Name | WD | Location | Status | Operator | Current Term | Dayrate ($000s) | Start Date | Est. End Date | |||||||||||||
BRAZIL | |||||||||||||||||||||
Ocean Whittington | 1,500’ | Brazil | Contract interrupted to resume and complete contract upgrade work | DODI | 0 | mid Oct. 2008 | late Dec. 2008 resume contract | ||||||||||||||
Brazil | Current Contract | Petrobras | resume five-year term plus potential 15% bonus | mid 220’s | lateDec. 2008 | late Aug. 2012 | |||||||||||||||
Ocean Concord | 2,200’ | Brazil | Current Contract | Petrobras | five-year term plus potential 15% bonus | low 230’s | mid Jan. 2008 | mid Jan. 2013 | |||||||||||||
Ocean Yorktown | 2,850’ | Brazil | Current Contract | Petrobras | five-year term plus potential 15% bonus | mid 230’s | mid Aug. 2008 | mid Aug. 2013 | |||||||||||||
Ocean Yatzy | 3,300’ | Brazil | Current Contract | Petrobras | four-year term extension plus potential 17% bonus | mid 110’s | early Oct. 2005 | early Oct. 2009 | |||||||||||||
Brazil | Future Contract | Petrobras | five-year term plus potential 10% bonus | mid 240’s | early Oct. 2009 | early Oct. 2014 | |||||||||||||||
Ocean Winner | 3,500’ | Brazil | Current Contract | Petrobras | four-year term extension plus potential 5% bonus | low 110’s | mid March 2006 | mid March 2010 | |||||||||||||
Brazil | Future Contract | Petrobras | five-year term extension plus potential 10% bonus | low 270’s | mid March 2010 | mid March 2015 | |||||||||||||||
Ocean Worker | 3,500’ | Brazil | Current | DODI | prep., plus acceptance testing | 0 | late July 2008 | lateJan. 2009 | |||||||||||||
Brazil | Future Contract | Petrobras | six-year term plus potential 10% bonus | low 270’s | lateJan. 2009 | lateJan. 2015 | |||||||||||||||
Ocean Alliance | 5,000’ | Brazil | Current Contract | Petrobras | one-well extension retroactive to late March 2008 | mid 520’s | late March 2008 | lateJan. 2009 resume contract | |||||||||||||
Brazil | Future Contract | Petrobras | four-year extension plus 20% potential bonus | mid 150’s | lateJan. 2009 | late Nov. 2009 | |||||||||||||||
Brazil | Future Contract | Petrobras | six-year term extension plus potential 15% bonus | low 340’s | late Nov. 2009 | late Nov. 2015 | |||||||||||||||
International Drillship (1) | |||||||||||||||||||||
Ocean Clipper | 7,000’ | Brazil | Current Contract | Petrobras | five-year extension plus potential 5% bonus | low 180’s | mid Dec. 2005 | mid Dec. 2010 | |||||||||||||
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
December 15, 2008
December 15, 2008
Rig Name | WD | Location | Status | Operator | Current Term | Dayrate ($000s) | Start Date | Est. End Date | ||||||||||||
International Jack-ups (8) | ||||||||||||||||||||
Ocean Columbia | 250’ IC | Mexico | Current Contract | Pemex | 1 1/2-year term | mid 120’s | late Jan. 2008 | mid June 2009 | ||||||||||||
Ocean Nugget | 300’ IC | Mexico | Current Contract | Pemex | term contract | upper 160’s | early Oct. 2006 | late March 2009 | ||||||||||||
Ocean King | 300’ IC | Croatia | Current Contract | CROSCO | two-year bareboat charter | upper 100’s | mid Nov. 2007 | early Nov. 2009 | ||||||||||||
Ocean Sovereign | 300’ IC | Indonesia | Current Contract | Kodeco | extension up to survey | upper 130’s | early Aug. 2008 | late Dec. 2008 | ||||||||||||
Singapore | Intermediate Survey & upgrade | DODI | 0 | late Dec. 2008 | early March 2009 | |||||||||||||||
Indonesia | Future Contract | Kodeco | 15-month extension + unpricedoption | mid 140’s | early March 2009 | late April 2010 | ||||||||||||||
Ocean Heritage | 300’ IC | Gulf of Suez | Current Contract | IPR | seven-month term | mid 110’s | mid July 2008 | early Jan.2009 | ||||||||||||
Ocean Spur | 300’ IC | Egypt | Current Contract | WEPCO | one-year term | low 140’s | mid Aug. 2008 | late Aug. 2009 | ||||||||||||
Ocean Shield | 350’ IC | Malaysia | Current Contract | Newfield | six-month term + two wells | mid 170’s | late May 2008 | lateDec. 2008 | ||||||||||||
Malaysia | Future Contract | Newfield | demobe to Singapore, then mobe to Australia followed by term | 0 | lateDec. 2008 | midJan. 2009 | ||||||||||||||
Australia | Future Contract | ENI | term | mid 260’s | midJan. 2009 | early Jan. 2010 | ||||||||||||||
Ocean Scepter | 350’ IC | Argentina | Current Contract | Enap Sipetrol/YPF | 300-day term contract + unpriced option | high 190’s | late Sept. 2008 | late July 2009 | ||||||||||||
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
December 15, 2008
December 15, 2008
Rig Name | WD | Location | Status | Operator | Current Term | Dayrate ($000s) | Start Date | Est. End Date | ||||||||||||
Upgrade (1) | ||||||||||||||||||||
Ocean Monarch | 10,000 | mobe GOM | Current | DODI | mobe to GOM and prep for contract | 0 | mid Dec. 2008 | early March2009 | ||||||||||||
GOM | Future Contract | Anadarko | four-year term + unpricedoption | high 420’s | early March2009 | early March2013 | ||||||||||||||
NOTES: Generally, rig utilization rates approach 95-98% during contracted periods; however, utilization rates can be adversely impacted by additional downtime due to unscheduled repairs and maintenance, weather conditions and other factors. An LOI is subject to customary conditions, including the execution of a definitive agreement and as such may not result in a binding contract. Options are un-priced and any extension of contract is subject to mutually agreeable terms & conditions unless otherwise indicated. Mobe revenues (if any) and mobe expenses are deferred, and generally are amortized over the life of the contract. GOM = Gulf of Mexico.
Cost/Revenue Footnote: Contract Drilling Expenses applies to contract drilling expenses ONLY anddoes not include Reimbursable Expenses
On rig utilization, assume 95% for DP units, 96% for conventionally moored rigs, and 98% for jack-ups.
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
December 15, 2008
December 15, 2008
EXPECTED DOWNTIME LONGER THAN 14 DAYS (Subject to Change)
Actual Oct. 1 — Nov. 30 Down Days (Total thru Q3 = 1,111) | # Days | |||||
Rig | Q4 Act. | EST. Q4 Total | Comments | |||
Shipyard Time | ||||||
Princess | 28 | 59 | 5-year survey and maintenance | |||
Ambassador | 61 | 74 | 5-year survey and maintenance | |||
Valiant | 61 | 82 | 5-year survey/replace derrick and other maint. | |||
Nomad | 36 | 36 | 5-year survey and maintenance | |||
Drake | 31 | 31 | 5-year survey and maintenance | |||
Rover | 16 | 16 | 5-year survey and maintenance | |||
233 | 298 | |||||
Other Downtime | ||||||
Worker | 61 | 92 | Prep for contract, accpt. test | |||
Tower | 61 | 92 | Equipment repair (Hurricane Ike damage) | |||
Whittington | 49 | 77 | Complete contract upgrade | |||
Sovereign | 0 | 6 | Intermediate survey, install new crane & top drive | |||
Shield | 0 | 6 | Mobe to Australia | |||
171 | 273 | |||||
Remaining 2008 Non-New-build/Upgrade | 404 | 571 | ||||
New-build/Upgrade Downtime | Q4 | Total | ||||
Monarch | 61 | 92 | Commission, mobe to U.S. GOM | |||
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
December 15, 2008
December 15, 2008
ESTIMATED 2009 DOWNTIME (PRELIMINARY PENDING FINALIZATION OF 2009 BUDGET)
5-YEAR SURVEYS | DAYS | COMMENTS | ||
America | 103 | |||
Champion | 61 | |||
Concord | 51 | |||
Titan | 45 | |||
Yatzy | 42 | |||
INTERMEDIATE SURVEYS | ||||
Summit | 16 | |||
Columbia | 15 | |||
Nugget | 13 | |||
Heritage | 10 | |||
OTHER DOWNTIME | ||||
Bounty | ??? | Approx. 1 year re-engine and water depth upgrade — work start time to be determined, may extend into 2010 | ||
Tower | 274 | Hurricane repair | ||
Lexington | 161 | Prep, mobe & acceptance test | ||
Quest | 135 | Prep, mobe & acceptance test | ||
Ambassador | 110 | Prep, mobe & acceptance test | ||
Monarch | 75 | Complete mobe to GOM and rig prep. | ||
Valiant | 60 | Mobe | ||
Sovereign | 65 | Completion of maintenance and upgrade begun in 2008 | ||
Worker | 20 | Complete Prep for contract, accpt. Test begun in 2008 | ||
Confidence | 18 | Thruster changeout | ||
Shield | 19 | Complete Mobe to Australia begun in 2008 | ||
DIAMOND OFFSHORE DRILLING, INC. RIG STATUS REPORT AS OF
December 15, 2008
December 15, 2008
Forward-Looking Statements: The rig status report may contain “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Forward-looking statements include, without limitation, any statement that may project, indicate or imply future results, events, performance or achievements, and may contain or be identified by the words “expect,” “intend,” “plan,” “predict,” “anticipate,” “estimate,” “believe,” “should,” “could,” “may,” “might,” “will,” “will be,” “will continue,” “will likely result,” “project,” “budget,” “forecast,” and similar expressions. Statements by the Company in the rig status report that contain forward-looking statements include, but are not limited to, statements regarding the current term, future dayrates, start and end dates and comments concerning future contracts and availability, letters of intent, utilization, surveys, downtime and other aspects of the Company’s drilling rigs, as well as statements concerning rigs being upgraded or to be upgraded and rigs under construction. Such statements are inherently subject to a variety of assumptions, risks and uncertainties that could cause actual results to differ materially from those anticipated or projected. A discussion of the risk factors that could impact these areas and the Company’s overall business and financial performance can be found in the Company’s reports and other documents filed with the Securities and Exchange Commission. These factors include, among others, general economic and business conditions, operating risks, casualty losses, industry fleet capacity, changes in foreign and domestic oil and gas exploration and production activity, competition, changes in foreign, political, social and economic conditions, regulatory initiatives and compliance with governmental regulations, customer preferences and various other matters, many of which are beyond the Company’s control. Given these concerns, investors and analysts should not place undue reliance on forward-looking statements. Each forward-looking statement speaks only as of the date of the rig status report, and the Company undertakes no obligation to publicly update or revise any forward-looking statement.