1026 patents
Page 37 of 52
Utility
Coated lost circulation materials and methods of using same
26 Oct 21
A method of reducing fluid loss includes pumping a wellbore fluid including resin coated solid particulate into a wellbore having fractures therein, the resin coated solid particulate forming a substantially impermeable plug in the fractures.
Aaron Blue, Joshua Sheldon
Filed: 18 Aug 17
Utility
Electrofacies determination
26 Oct 21
A method for includes obtaining a well log comprising a sequence of measurements of a wellbore in a field, and generating change points in the well log based on the sequence of measurements.
Sylvain Wlodarczyk, Vianney Bruned, Florent D'Halluin
Filed: 7 Dec 16
Utility
Polycrystalline diamond cutting elements with transition zones and downhole cutting tools incorporating the same
26 Oct 21
A cutting element may include a substrate including a plurality of metal carbide particles and a first metal binder having a first metal binder content; an outer layer of polycrystalline diamond material at an end of the cutting element, the polycrystalline diamond material including a plurality of interconnected diamond particles; and a plurality of interstitial regions disposed among the interconnected diamond particles, the plurality of interstitial regions containing a second metal binder having a second metal binder content.
Madapusi K. Keshavan, Ronald B. Crockett, Neil Cannon, Dwain Norris, David R. Hall
Filed: 7 Jan 19
Utility
Reservoir simulation using an adaptive deflated multiscale solver
26 Oct 21
Systems, computer-readable media, and methods are described for performing a reservoir simulation by obtaining reservoir data, obtaining simulation parameters, determining partial differential equations based on the simulation parameters, and performing a timestep of the reservoir simulation based on the reservoir data and the partial differential equations by removing an effect of long coherent structures with high contrasts, such as fractures, faults, high and low permeability channels, or shale layers, from the partial differential equations to generate adapted partial differential equations, and performing an algebraic multiscale method on the adapted partial differential equations to generate an approximated solution.
Kyrre Bratvedt, Alexander Lukyanov, Hadi Hajibeygi, Kees Vuik
Filed: 6 Oct 16
Utility
Pressure exchanger manifold resonance reduction
26 Oct 21
Apparatus and methods for reducing pressure exchanger manifold resonance.
Rod William Shampine
Filed: 6 Nov 17
Utility
Manufacturing techniques for a jacketed metal line
26 Oct 21
A method of manufacturing a jacketed metal line is detailed herein.
Joseph Varkey, Burcu Unal Altintas, Jushik Yun, Dong Yang, Sheng Chang, Ramnik Singh
Filed: 13 Jul 18
Utility
High density brine with low crystallization temperature
19 Oct 21
A wellbore fluid comprising a first aqueous base fluid and a plurality of silica nanoparticles suspended in the first aqueous base fluid.
Hui Joyce Zhang, Xia Wei, Steven Young
Filed: 26 Sep 16
Utility
Rotating control device
19 Oct 21
An apparatus includes a non-rotating housing, a rotatable member rotatably supported in the non-rotating housing and a bearing adapter sleeve disposed externally to the non-rotating housing.
Lap Tran
Filed: 17 Sep 18
Utility
Method and apparatus for continuously controlling a well flow rate
19 Oct 21
A method for continuously controlling fluid flow rates through a well (4) provides to shut off the drilling mud at the well inlet and outlet and detect measurements of flow rate and density of the drilling mud by a Venturi measuring device (10,2).
Luigi Peveri
Filed: 5 Nov 19
Utility
Dynamic system for field operations
19 Oct 21
A method for controlling field equipment can include receiving information via an interface of a control system; analyzing the information by the control system with respect to tiered well construction activities; based on the analyzing, generating a workflow that includes at least a series of tiered well construction activities; and transmitting a signal from the control system to the field equipment to control the field equipment to perform at least one of the series of tiered well construction activities.
Jean-Marc Pietrzyk, Richard John Harmer
Filed: 21 Jun 19
Utility
Smart filtrate for strengthening formations
19 Oct 21
A method of sealing a formation that includes drilling a wellbore through the formation while pumping a non-aqueous based wellbore fluid comprising a first sealing component into the wellbore, wherein the non-aqueous based wellbore fluid filters into the formation as a filtrate and substantially thickens is disclosed.
Guido De Stefano, James Friedheim, Steven Young
Filed: 30 Mar 15
Utility
Combined telemetry and control system for subsea applications
19 Oct 21
A technique facilitates communication in a subsea well application.
Benoit Deville, Arnaud Croux, Stephane Vannuffelen
Filed: 19 Dec 16
Utility
Closed chamber impulse test with downhole flow rate measurement
19 Oct 21
An apparatus for performing a well test operation includes a tubular member having a surge chamber and a valve that can control fluid flow from a well into the surge chamber during the well test operation.
Fikri John Kuchuk, Stephane Hiron, Bertrand Theuveny, Anthony J. Fitzpatrick, James G. Filas, Alexander Starostin, Pavel Evgenievich Spesivtsev
Filed: 6 May 14
Utility
Dual-beam multiphase fluid analysis systems and methods
19 Oct 21
A method for analyzing flow of a multiphase fluid through a flowmeter is provided.
Jianhua Zhu, Charles Toussaint, Cheng-Gang Xie, Massimiliano Fiore, Alexander Vilstrup
Filed: 14 Feb 19
Utility
Determining dielectric constant and resistivity with induction measurement
19 Oct 21
The highly valuable properties of resistivity and dielectric constant of a geological formation may be determined using an induction measurement, even for a geological formation with bed boundary or dipping effects, using a one-dimensional (1D) formation model.
Gong Li Wang, John Rasmus, Dean Homan
Filed: 26 Apr 19
Utility
Phase-based electromagnetic surveys for geological formations
19 Oct 21
An electromagnetic (EM) data acquisition method for a geological formation may include operating EM measurement devices to determine phase and amplitude data from the geological formation.
Ping Zhang, Nestor Cuevas, Michael Wilt, Jiuping Chen
Filed: 16 Jan 13
Utility
Systems and methods for asset management using a digital avatar
19 Oct 21
An asset management system that includes a field asset management system; a maintenance management system; and a digital avatar associated with a specific asset.
James Fay, Christopher Del Campo, Ke Li, Paul Cormier, Luis Lopez, Stephanie Elstrop, Clare Schoene, Fei Song
Filed: 21 May 19
Utility
Concurrent, layer-by-layer powder and mold fabrication for multi-functional parts
12 Oct 21
The present disclosure provides for a method of making a part using powder metallurgy and material extrusion.
Srinand Karuppoor, Manuel Marya
Filed: 10 Oct 18
Utility
Pad in bit articulated rotary steerable system
12 Oct 21
A rotary steerable system (RSS) including an upper stabilizer connected to a collar of a drill string, an articulated section connected by a flexible joint to the collar, a drill bit connected to the articulated section opposite from the flexible joint, a lower stabilizer located proximate to the flexible joint and an actuator located with the articulated section and selectively operable to tilt an axis of the drill bit and the articulated section relative to the collar.
Martin Thomas Bayliss
Filed: 28 Jan 19
Utility
Steerable drill bit system
12 Oct 21
A steerable drilling system in accordance to an embodiment includes a bias unit integrated with the drill bit to form a steering head and an electronic control system located remote from the steering head and electrically connected to a digital valve of the bias unit.
Geoffrey Downton
Filed: 4 Mar 20