6 results
40-F
2023 FY
EX-99.1
SILV
SilverCrest Metals Inc.
11 Mar 24
Annual report (Canada)
7:02am
that the Company will be successful in attracting, training and retaining qualified personnel. If the Company is not able to attract, hire and retain qualified
40-F
2021 FY
EX-99.1
SILV
SilverCrest Metals Inc.
24 Mar 22
Annual report (Canada)
9:06pm
. It is assumed that the mining contractor would hire personnel throughout Mexico and be responsible for lodging and catering of those personnel.
The operating … , productivity, costs, and mining methods; early hire of site management personnel; stockpiling material so that the plant has an early supply of material
6-K
EX-99.3
SILV
SilverCrest Metals Inc.
6 May 21
Notice of Annual General Meeting of Shareholders
8:23am
is naming six (rather than five) NEOs as Tara Hassan would not be a NEO but for a special grant of stock options in connection with her hire
40-F
2020 FY
EX-99.1
SILV
SilverCrest Metals Inc.
26 Mar 21
Annual report (Canada)
12:00am
be no accommodation provided at site; Personnel will be transported to site by SilverCrest. It is assumed that the mining contractor would hire personnel … of development to provide information on ground conditions, productivity, costs, and mining methods; early hire of site management personnel
6-K
EX-99.1
SILV
SilverCrest Metals Inc.
11 Feb 21
Form 51-102F3 Material Change Report
12:00am
. There would be no accommodation provided at site; Personnel will be transported to site by SilverCrest. It is assumed that the mining contractor would hire … , and mining methods; early hire of site management personnel; stockpiling material so that the plant has an early supply of material for treatment
6-K
EX-99.1
p95ua pamdugs
5 Feb 21
NI 43-101 Technical Report & Feasibility Study
4:52pm
- Prev
- 1
- Next