28 results
6-K
EX-99.2
ORLA
Orla Mining Ltd
7 Sep 21
Orla Mining Files Cerro Quema Oxide Project Pre-feasibility Study Technical Report
5:25pm
Haul Road Design Parameters
Pit Design Results
Quema Pit Design Results
La Pava Pit Design Results
Rock Storage Facilities
Chontal Waste Rock Dump … and Closure
Soil Handling
Operating Areas
Mine Pits
Waste Rock Dump
Roads
Closure Activities – Heap Leach Facilities
Chemistry
Permanent Surface
6-K
EX-99.1
ORLA
Orla Mining Ltd
20 Jan 22
Updated NI 43-101 Technical Report on the Cerro Quema Project
4:27pm
Quema Pit Design Results
La Pava Pit Design Results
Rock Storage Facilities
Chontal Waste Rock Dump
Backfill Designs
Ore Stockpiles
Mine Production …
On-site BioRemediation Cell
Waste Water (Sewage) Disposal
Reclamation and Closure
Soil Handling
Operating Areas
Mine Pits
Waste Rock Dump
Roads
Closure
6-K
EX-99.1
ORLA
Orla Mining Ltd
28 Jul 21
Current report (foreign)
9:39am
design will allow the heap leach pad and the waste rock dump to accommodate additional tonnage in the upstream site of those facilities if required … and groundwater flows, quality, storage and treatment.
Completion of additional geotechnical studies at the proposed heap leach, waste rock dump, open pits
6-K
EX-99.1
ORLA
Orla Mining Ltd
9 Aug 21
Material Change Report Under National Instrument 51-102
4:42pm
Pava and Quemita for gold-copper mineralization. The current design will allow the heap leach pad and the waste rock dump to accommodate additional … geotechnical studies at the proposed heap leach, waste rock dump, open pits, and processing areas.
Evaluation on the availability of local services
6-K
EX-99.1
ORLA
Orla Mining Ltd
21 Jan 21
Material Change Report Under National Instrument 51-102
2:43pm
in the size of the open pit, heap leach pad, and mine waste dump as a result of the Layback Agreement, all of which were anticipated in the initial design … described in the updated Feasibility Study, including the expanded pit and the eventual increase in the heap leach and mine waste dump
40FR12B
EX-99.62
yety4wg4q 0092
4 Dec 20
Initial registration of securities (Canada)
5:28pm
6-K
EX-99.1
y6lqk
11 Jan 21
Orla Mining Increases Gold Mineral Reserves by 54% With Updated Feasibility Study at the Camino Rojo Oxide Gold Project
5:07pm
6-K
EX-99.1
otg39sh
9 Feb 21
NI 43-101 Technical Report on the Camino Rojo Gold Project
4:36pm
6-K
EX-99.1
t3s2sqxzod4moe13z66
6 Aug 21
Orla Mining Reports Second Quarter 2021 Results and Provides Camino Rojo Construction Update
12:00am
6-K
EX-99.2
5cn 3fe6a
15 Nov 21
Condensed Interim Consolidated Financial Statements
6:52am
6-K
EX-99.2
qqyrrf
6 Aug 21
Condensed Interim Consolidated Financial Statements
12:00am
40-F
EX-99.1
hlre3
18 Mar 22
Annual report (Canada)
9:18pm
F-10/A
zqpsus
12 Mar 21
Registration of securities (Canada) (amended)
4:28pm
40-F
EX-99.2
slkcpx0g bfrie5w4b
18 Mar 22
Annual report (Canada)
9:18pm
F-10
wveyjdk68uctedtb2
10 Feb 21
Registration of securities (Canada)
4:48pm
40FR12B
EX-99.36
hebf1aq
4 Dec 20
Initial registration of securities (Canada)
5:28pm
6-K
EX-99.2
tjvtjqeou4ge9fzh3
12 May 22
Condensed Interim Consolidated Financial Statements
5:19pm
6-K
EX-99.2
mfys71
8 Aug 22
Condensed Interim Consolidated Financial Statements
5:53pm
40-F
EX-99.2
a0fnrgkxw0eo
22 Mar 21
Annual report (Canada)
12:00am
40-F
EX-99.1
xwvat
22 Mar 21
Annual report (Canada)
12:00am