in morning. over good the incident through of practices. and Bobby, spills incidents, or recordable XXXX. safe demonstrated accidents in Riley A no you, days X Thank total operating recordable team The vehicle barrels. excellence operations We rate again, XX% Once XX requiring safe achieved achieved metric year. for a
The completed activity. XX, and line are drilled wells. from turned turned we over wells In completion XX line XXXX in gross carried XXXX, QX operated additional XX in
assets our measurable We and campaign foot metrics. drilling year-over-year achieved and completion cost Texas XX% operational XXXX. success by New Mexico XXXX both both Our in and decreased across fiscal per in
zipper-style note, that pump completions moves all rig drilled drilled our day setting per wells same on XXXX, XX% that the laterals. X completed multi-well in Of X.X saving mile time, since for in Texas we lateral XXXX also were and times. and mile feet by At pads and increased were records both on had
savings, TD better targeting times. driving selection, Other BHA assets sand minimize spud or to which spacing be higher increasing These single shown bit cost us allowed strategies lateral reserve capable. made our steering optimized cost efficiency value, and have to in achieve as of on loading. runs focus to and were drilling exceeding completions to changes and our the through maintaining to through while optimize continue cluster decreasing shorter We production such and reductions resulting
from Net X.XX million from an to up million X.X production production of in increase barrels year-over-year XX%, X.XX million XX%, equivalent. of grew oil of barrels to oil XXXX, is equivalent while billion and X.XX
for of net XX.XX production MBo was XXXX. MBoe the Our day day average quarter XX.XX per and daily per fourth
sell in produced the were same the to and lower percentage strategic our work sales Texas oil projects overall but oil partners midstream to of of Of maximize with continue through able in we our production, at mix. gas to gas We optimizations. note, more capture infrastructure in and resulting a
in to development The allowed flexible field considerations. and a controlled at to by us other pace Allowing strategy drive has us. to conditions industry Texas full be market us
is We will on maintaining added focus assets. XXXX. The develop infrastructure increase achieved, continue for to was basis value as This creation the Mexico while main operating costs. this production utilize approach our we our low in New
XXXX metric. per per with roughly the LOE flat equivalent XXXX Our $X.XX barrel, for was BOE full year
of more workovers as selection. our efficiencies, chemical Texas treatments asset gotten cleanout These operations. efficient we've timing work including refine our of in overs and Routine continued have to optimization tool
longer proactively less years doing production is them per a expense cost they ago, resulting result, higher year-over-year Overall, did intervening. XX% in than X BOE our basis XXXX. and on a we Texas As before for down in workover began XX% just cleanouts
substantially fourth result gathering New budget. quarter in ARO Bobby of XXXX New development that a discussed, the Mexico initial in on project. This to Also phases that of we construction acquisition the a and our part as saw in Related the came midstream our for compression XXXX. and the spend XXXX completed plugging XXXX, will lower of requirements schedule within Mexico
the currently of high-pressure end portion the is of Commissioning before compression month. the of with project sales first underway, this this
existing to begin to gatherers the high-pressure low-pressure in capacity system XX will fill roughly leaving the million interim. capacity process, our the compression We and a project in an additional with day
gathering compression, transmission will be to increasing built infrastructure and gas out continue XXXX, to over and reliably. consistently our ability deliver Further
our with on currently using station This in greater Texas benefits of generation existing more power percentage power control We're of our utilize utilities We're self-generated than development lets a XXXX. without plan of to drive assets. to installation relying us continue the end evaluating roughly XX% development our Texas New Mexico. the at We similar a our timing.
XX% turned operated it equivalent of efficient delivering to while LOE to want capital the summary driven development less Philip, a line per impressive XX% wells base. spend development year, XX% dollars team net equivalent wells, year In all more produced with the for D&C more and more in I XX% net you. spent barrel we and production over for technically stellar very our safe, asset safety metrics. It I'll was an congratulate Riley XXXX. operational for successful turn and flat