the for Thank customers are especially increasingly earnings with you, our and even mix space of And our other new, design broader based with joining manufacturing and thank new year-to-date order I looking am our everyone Terran John. first XXXX performance call. satellite quarter you projects. conference excited flow. constellation Orbital A to
driven we the Networks billion. March award from our $X.X added world-class $X.X mission in single breadth, manufacturing pace of has our quarter billion, constellation plus award record and February, XXX satellite our us a constellation speed, quality. success, Space ever. backlog Rivada over end state-of-the-art believe increased of This choosing is to which design -- rapid because We XX-year are commercial largest and our Customers our track order
we other to with have to total million, say signed pipeline a with announce but signed new combined our today recently satellite over we we order another pleased are conversion that yet programs. standout several XX $XX awards this, our a highlight. year-to-date book XX on award is order More to addition, In to order brings new This customer.
Now overall and updates. quarterly turning to our performance
to I our demonstrate successful to our very our First, delivery announce much Development am to that communication low-latency launch earth next Tranche links warfighter positive capabilities our with their team's a Layer network partner, continues happy from resilient the of X month. we support Martin, XX orbit. year After Lockheed looking low contracts. satellite momentum Transport satellites are to forward the our last integrated will X These across Tranche Agency Space of
low-earth other As sea-based use systems. that of with a reminder, layers SDA's layer network XXXs communication satellite is plus connect will ground, critical satellite to mesh the a transportation orbiting air and
As is foundational SDA-based the layer this transport decade architecture and such, for beyond. to the
first critical layer, We National Tranche X mission X. Tranche known are the the and as to to contribute on work this it’s pleased through award Security
advanced SDA's architecture to quarter and Tranche to manufacturing the recently year. be issued their later two during of the for order, of expect every consist the XXXs deployment are and Transport of balance The SDA which and satellites the first schedule we will end by we of XXXX, Layer of and generation satellites, be these confirm Agency Development the solicitation work of XX a proliferated lower will operational of rapidly batch Our Tranche this by first the orbit satellite, at X XXXX. pleased this architecture, of announced first deploy years. award and Tranche (ph) track we SDA space late-XXXX. base X team acquire on has been construction is hard the Space delivery it's with for begin in are satellite X, this to that satellite to warfighter [confronted] The strategy
We space was is full the opportunity Lockheed Martin, key us Tranche remain we development our team and pursuits Many This additional for Space a recently us believe with for to partnership position our the and well you with transport our Agency. experience over of Lockheed of capabilities strategic the support our extended layer, differentiate and with the in Tranche leveraging familiar partnership with awards for X XX Development and Tranche through continue year XXXX, track relationship Space with Development record X Agency. spectrum seven-plus are along combined Martin. the X next months. layer
very are contract, Network. test update Space XXX on and satellites design, pleased manufacture, record we the billion Rivada integrate you company's to for Second, $X.X
As in terminal. last industrial we a announced payment of with communication milestone using low-earth our This month, orbiting will consist satellites along further have the vision of planes orbit on completion we multiple laser received partner. screening a
billion first satellites. $X.X initial covers only the contract XXX Our
a for Rivada purchase additional satellites is at The additional a and option into an includes to phase. design contract The an build grouped phase an contract cost. XXX broadly
construction of currently We will another, verification support within demonstrate user which gateway the one the four phase, executing that of on routed design less transmission to emission are -- includes small control a from a network Mission from satellites currently satellite center, space for Orbital's operations conducted demonstration is Irvine, will new state-of-the-art be state-of-the-art -- satellite Terran in operations in under which California. satellites new on-orbit the
XX of which The An the is XXXX of as part and satellites balance the built this sellers build in of commissioned additional and XXX phase late first-half be phase. the delivering will XXXX.
revenues up milestone the ramp months. and program steadily coming still in recently are are a We ramping Rivada received payment, to projected this
customer an announce low-earth award for today XX satellites. $XX are thrilled from orbit to we a million Third, new
contract be but not history just and constellation recent this partnering supplier is space with a customer, by our which of who are ourselves pleased to leader awards. technology. long a a an We advancing has We industry pioneer, as validated as most choice, see new of
at for from over Rivada the award. our backlog March These orders a includes representing but billion. and $X.X to satellites has exclude announced both backlog, of and pipeline $XX.X XXX backlog and Space robust as Our pipeline pipeline contract successful XX, of metrics today's billion, conversion remained March XX our stood
addition mission experience and Including satellite other larger existing which programs active value development the noted, well deep constellation other supporting the of and larger as our customers we potential and pursuing missions have programs, others both mission. remain, and channel prototyping and many diverse record. across for precursor is are In of a and who track customers, the as to These constellation. are we we will to new customers today are and
a serve potential larger -- are for as programs awards a many they seed While corn the of seed these today, constellation tomorrow. undisclosed
is Lockheed just Martin announced revolutionary two satellite example Our Rendezvous completing operation team geosynchronous of Terran LINUSS our program mission is Proximity the working of and one currently on. Orbital success the demonstration
XXX to which demands Another three a delivering second is these Low-latency, innovation, each are our which are record we optical technology gigabits record-setting technology per systems, space satellites, enabled for secured orbit, customer of demonstrated link. communication, Difficulty]. proliferated ground NASA advances Pathfinder speed to [Technical
these of vertically-integrated and all design manufacturing and capability. scale Supporting our is orders opportunities
identified backlog of system to pipeline. in and are our X,XXX our satellites XXX execution in production world-class investing over satellites support We
in is and fully our Tech year. Our Irvine, per new workspace call capacity later brings XX manufacturing approximately square feet the commissioned, this which of we satellites month, of a California facility facility, XX,XXX XX adds once
to with circuit automated XX,XXX equipment, capacity expect in of multiples of square in lines speed. capacity to we to current robotic we printed testing increase Irvine, this throughput, our the vastly our which quality board after to are commissioning assembly are XXXX. announce assembly And improve recently development announced Critically, also equipment, foot pleased we and and facility our and late includes progressing
Importantly, satellites. for and assembly this of new highway significantly XX-foot capacity larger includes integration
has as the What a take of space are to in a architecture leading the months. infrastructure In summary, Constellations of used Terran to preferred the building enabling billions new smaller, page. at supplier satellite of fraction low-earth cost of Orbital Terran decade the future. cost orbiting the itself launch, Orbital of is a and satellites established
XX-year scale, Our leverages automation investments vertical integration in and our legacy.
quantity margins at a customers price at speed reward deliver stimulate and and shareholders. mass Our system to satellites a at is point designed desire, scale markets production to our at new our and to a
franchise strategy by new our in thrilled awards recent was recognized months. are the two We contract
turn a financial performance for Gary in to provide outlook it over our the financial quarter me and to let review the Now full-year. Gary?