earnings Sure, question owners, facility, first recycling be generating really largest growth significant and great excited a just world's Duffy. problem. we're about our but chemical to we're possible, having and excited pretty this get It's that environmental show the not and in to up what's really for This in world running. because solving the will plant
that is pretty And plant. at a spec the and It's material very front end. with back we're of plant sort the going into on we're the the serving and our we're out look And and material it coming technology customers. amazing you garbage when really excited complicated of on-spec basically
start nontrivial compared to to you're asset. if is commodity it a So up building
which works, can we chemistry news that question continuously. that's always functioning as is people was fully confirmed ops good that process working. had The the have unit run can think all It validated designed. and I the we confirm biggest the are that We've
sort So really design we the good plant. of the feel the of structural about and aspects
just schedule as The certainly front. been run we're challenge reliably. And we on really, on prepared mentioned the about behind on has And remarks plant that we're weeks reliability. still the getting X focused to in
haven't a moved actually capacity the feedstock a mechanical we into So broad slate of we've lot up ramped addressed issues. these some until or
issues all with do mechanical chemistry. issues. nothing the we're to It's the facing So have literally process
the We all addressed those installed beginning, improperly equipment. of of in leaks construction those was it actually, this of most and errors, issues -- we've stage. at issues believe Some
supply of early more-than-normal have equipment of They're wasn't sort This slow peers equipment other all the globally where of crisis. just failure kind of sort unique of as We all challenge sort we're them. pause same been like as address little you chain down to see in pieces simple us. instrumentation, sort not some made equipment. having valves some our hope of to but the would there's we is well you and as they these to of issues. dealing solve, And annoying with as of just to Then
completing cause total feel actions quality issues We We've And of to mixture assembly, root learning. issues. address a close some on analysis the that a issues it, to clear more all on some especially we're a understanding of those had design quality complicated. equipment, some done what's operating need pumps. It's -- and we is have a that. of we've little And we reliability causing rotating very also and very
running. from say of we we're view, mechanical I'd plant's at. where feel very about good So The a point
the out now expanding right And we're priority doing. of in Our and is which of try sort issues. phase customers, ramping our just slate serving to up production those feedstock sort of we're
and that's of monomer op called is the clean, no of DMT always what. the XX% the a But plant matter
the which part viewing EG, the process of smaller plant. chemistry sort of is is a So really about around impurity just
So supplying that is customers material, to their good not we this feel because this other very as close ramp projecting year that test of we plant. up, we're demand about capacity
And to served them ways we've of plenty and so keep got supported.
out So we obviously forget the achieve $XX but feel we got million how having challenged a little slower a there about more it year. It's we've we that had as can still EBITDA a that pathway. good start, for with the of we've
What well I'd now we'll be which up steady say is progression start always sure is far through we're mechanically what doing the doing as to was as state you make ramp our plan this to quarter. fine, goes, right feedstock, a everything run broadening then as at as next do
quarter that we you second tell to call. more to get lot a have we'll the about So when