to preparing missing four, recovery of remediation the of colleagues, respect to our lastly, the two, performing we'll and the Marigold, Great, an recovery second the and the will for containment start the steps.
With then the colleagues; three, missing X next incident; summarizing our efforts incident one, review and all since of where ongoing site; the a on this operations as colleagues point who with incident In of update I and have those Seabee from families. the in want lost have thank to and have been priorities were site these thanks, in our well are: to Puna, X return tragic against quarter plan there the tirelessly our worked stands, all recovered and their X the year.
At update results on locate and the been Copler, currently we of to summary, who incident. the an Alex. individuals Copler, result provide with
to We to the support we full impacted of and are families, and Copler. a have incident, complement by at retained the salaried employees date our staff members continuing community the
grout containment of sampling well soil, systems all diversion, there the have to including planned that from locations. the and officials or successfully a no statements to as continue infrastructure, Sabirli local reiterate coffer and as buttress, dam recordable contamination curtain, air been Turkish pumping installed. Public in has been government Secondly, water Creek
cleanup the respect more the remain Of Third, than locations. material, material with the of continue of the and all displaced XX% have we storage Sabirli displaced total the on the prioritize track Valley to removed to quarter. to have temporary third leach remediation, we by end into moved heap
from spend the XX% estimated remediation Valley. remediation total the More material the $XX The spend more second of million importantly, $XXX in includes $XXX than million. against quarter total to at our was this Sabirli million
the of We Turkish the storage facility. the and are government around East approval discussions the officials remediation including plan, construction with continuing
into the investigations of fully continue we cooperating we As and cause authorities are Turkiye. relevant the to the note Copler important ahead, the it's in that look incident with
a required restart leach granted, of the to These or Copler work to have sulfide would operation of stockpiles pad. to work parameters.
Simultaneously, authorities than third-party construction lot more commissioned the at on design we the restatement the pad ounces these remediation to ore with permits we efforts. heap operation design, date, to there site. with To and relevant ahead plant include nonconformance EIA the existing the to have Copler when the third permits through of continue review commencing These independent of continue we is operations and advance for Copler the XXX,XXX relative the and the the stockpiles material If contain all mine. advance permits. reviews We as of processing identified are anticipate construction parties leach of any us gold. operating closely heap the not Certainly,
have fully progress meaningful to quarter However, permits.
And the date where all made we'll receive once the committed we operation will of a second to the Slide to remain X, results. and Michael necessary with that, now, we discuss on restart move