Free signup for more
- Track your favorite companies
- Receive email alerts for new filings
- Personalized dashboard of news and more
- Access all data and search results
Filing tables
Filing exhibits
- 20-F/A Annual report (foreign)
- 4.8.52 Product Catalogue of S7-300 Controller
- 4.8.53 Differential Pressure SWITCH-604
- 4.8.54 Introduction of Wincc
- 4.8.55 Micro-differential PRESSURE-266E
- 4.8.56 DM-2000
- 4.8.57 Temperature and Humidity EE10
- 4.8.58 Simatic Panel Catalogue 4030
- 4.8.59 Two-way VALVE-VVF31
- 4.8.60 Two-way Valve - VVG41 Series
- 4.8.61 Two-way Valve - VVG44 Series
- 4.8.62 Two-way Valve-vvi
- 4.8.63 Ac System Control Points I
- 4.8.64 Components In Distribution Box
- 4.8.65 Electrical Distribution Box
- 4.8.66 Power Consumption Workshop
- 4.8.67 Room Parameters
- 4.8.68 Summary
- 4.8.69 Design and Construction Specification
- 4.8.70 Doors and Windows Summary
- 4.8.71 Accessory Documents List
- 4.8.72 Catalogue of Interior Decoration 1
- 4.8.73 Catalogue of Pipeline 1
- 4.8.74 Cover Page of Heating Ventilation
- 4.8.75 Cover Page of Interior Decoration
- 4.8.76 Cover Page of Pipeline
- 4.8.77 Electric Catalogue 1
- 4.8.78 Electric Catalogue 2
- 4.8.79 Electric Catalogue 3
- 4.8.80 Electric Cover Page
- 4.8.81 List of Heating Ventilation Drawings 1
- 4.8.82 List of Heating Ventilation Drawings 2
- 4.8.83 List of Heating Ventilation Drawings 3
- 4.8.84 List of Heating Ventilation Drawings 4
- 4.8.85 Misc 1
- 4.8.86 Misc 2
- 4.8.87 Misc 3
- 4.8.88 Misc 4
- 4.8.89 Quotations Specifications and Other Info Redacted
- 4.8.90 Suntec Memos 20090608-5
- 4.8.91 Urs RESPONSES-SUNTEC090608
- 12.3 CEO Certification Pursuant to Section 302
- 12.4 CFO Certification Pursuant to Section 302
- 13.3 CEO Certification Pursuant to Section 906
- 13.4 CFO Certification Pursuant to Section 906
TRSBF similar filings
Filing view
External links
Exhibit 4.8.73 - Document List - CATALOGUE OF PIPELINE 1
![]() | SUNTEC Cleanroom & HVAC Engineering Co., Ltd |
LIST OF DRAWINGS New Plant Project of Shenyang Sunshine Pharmaceutical Company Limited Production Workshop Design of Working Drawings Pipeline System | |
Project No. | Q558 | Total 6 Pages | |||
Prepared by | Checked by | Approved by | Drawing No. | D Wen - 558-1-PP-1/1 | |
E05-061305-80 |