ENERGEA PORTFOLIO 3 AFRICA LLC
(Exact name of registrant as specified in its charter)
Delaware
(State or other jurisdiction of incorporation or organization)
86-2564467
(I.R.S. Employer Identification No.)
52 Main Street, Chester, CT 06422
(Full mailing address of principal executive offices)
860-316-7466
(Issuer's telephone number, including area code)
Class A Investor Shares
(Title of each class of securities issued pursuant to Regulation A)
This IC Memo includes projections and forward-looking information that represent Energea's assumptions and expectations in light of currently available information. Except for statements of historical fact, the information contained herein constitutes forward-looking statements and they are provided to allow potential investors the opportunity to understand management's beliefs and opinions in respect of the future so that they may use such beliefs and opinions as one factor in evaluating an investment. These forward-looking statements are not guarantees of future performance and necessarily involve known and unknown risks and uncertainties, which may cause actual performance and financial results in future periods to differ materially from any projections of future performance. For a comprehensive discussion on forward-looking statements and the risks associated with this investment, please refer to the Form Offering Circular.
All capitalized terms used herein have a meaning set forth in the Offering Circular.
ITEM 9. OTHER EVENTS
Executive Summary
The High School Montagu Project consists of two (2) separate arrays located at the school's facility. The Montagu School array is a 49.5 kW DC rooftop solar installation, and the Montagu Huis Van Velden array is a 21.5 kW DC rooftop installation. Each array is paired with a 60kWh battery energy storage system ("BESS"). The school is located at 2 Kohler Street, Montagu, Cape Town, 6720 ("Project"). The Project will be connected "Behind the Meter" at the High School Montagu facility.
The Project has signed a Power Purchase Agreement ("PPA") with High School Montagu. The PPA obligates the Offtaker to purchase 100% of the energy produced by the Project. As compensation for the BESS, they will pay a fixed monthly amount for a period of 10 years.
Energea Portfolio 3 Africa LLC ("Energea") will invest, through The Sun Exchange (SA) Bewind Trust ("Sun Exchange Trust"), a total of $182,255.59 with a projected IRR of 11.10% ($USD).
Key Information
General Info
Project Owner | Energea Portfolio 3 Africa LLC |
Project Location | Montagu, Cape Town, South Africa |
Technology | Rooftop Solar and Battery Energy Storage System |
System Size Montagu School Solar: Montagu School Battery: Montagu Huis Van Velden Solar: Montagu Huis Van Velden Battery: | 50 kW AC / 49.5 kW DC 60 kWh 50 kW AC / 21.5 kW DC 60 kWh |
Estimated Year 1 Production (Total) Montagu School Montagu Huis Van Velden | 116.04 MWh 81.65 MWh 34.39 MWh |
Coordinates | -33.7946988, 20.1239702 |
Roof Status | Verified by a third-party engineer |
Project Status | Under Construction |
Useful Equipment Life (Years) | 25 |
Stakeholders
SPE | The Sun Exchange (SA) Bewind Trust |
Offtaker | High School Montagu |
EPC Contractor | NTOZA Fishing (PTY) Limited |
O&M Contractor | NTOZA Fishing (PTY) Limited |
Roof Owner | High School Montagu |
Asset Manager | The Sun Exchange (PTY) LTD ("Sun Exchange") |
Uses of Capital and Project Economics
Project Hard Costs | 2,799,698 ZAR |
Project Soft Costs | 262,776 ZAR |
Developer Fee | 374,867 ZAR |
Total Project Financing | 3,437,340 ZAR |
Debt Funding | N/A |
Equity Funding | 3,437,340 ZAR |
Project Owner IRR | 11.10% ($USD) |
Project Review
Site
High School Montagu, the Offtaker, owns the property on which the Project will be installed. The rights to use the roof for a 20-year term has been secured through a Power Purchase Agreement. The BESS installation is a fixed monthly payment for a term of 10 years.
Montagu is a town in the Western Cape province of South Africa, located approximately 110 miles from Cape Town. The town was named after the former Secretary of the Cape Colony, John Montagu. The town is well known for its hot mineral springs and scenic mountains and is an agriculture center containing orchards and vineyards where they grow high quality produce and herbs. Montagu is known to be a very small and safe tourist-friendly town, making this a great location for the Project to be installed.
Design
NWE Consulting Engineers performed their roof inspection of the High School Montagu rooftops on October 5, 2023. During the inspection of the existing commercial rooftops, they confirmed that the timber frames, beams and columns can accommodate the additional loading of the proposed solar panels. They noted that the clay tiles and the corrugated sheeting showed signs of aging and may need to be replaced prior to the installation. After the Project is constructed, Origin CE will provide the final structural competence certificate in accordance with section 14 subsection (2A) of the NBR and Building Standards Act (1977).
The following table outlines the components that will be installed:
Huis Van Velden
Project Major System Components
Component Name | Manufacturer and Make | Unit Quantity | Energea Notes |
Modules | JA Solar JAM72S30-550/MR (550W) | 39 | Tier 1 module manufacturer based in China |
Inverters | Sunsynk (1) 50kW SUN-50K-SG01HP3-EU | 1 | Their technical support systems are worldwide and provide high levels of service in South Africa due to their local distribution facilities. |
Racking | Schletter Standard | | One of the leading manufacturers in South Africa for solar mounting systems. In addition, this product has been used for several already constructed and operational assets through Sun Exchange. |
Battery (BESS) | Freedom WON LiTE Home 80/64HV | 1 | A locally sourced and manufactured product in South Africa, but have also batteries installed in over 60 countries worldwide. |
Montagu School
Project Major System Components
Component Name | Manufacturer and Make | Unit Quantity | Energea Notes |
Modules | JA Solar JAM72S30-550/MR (550W) | 90 | Tier 1 module manufacturer based in China |
Inverters | Sunsynk (1) 50kW SUN-50K-SG01HP3-EU | 1 | Their technical support systems are worldwide and provide high levels of service in South Africa due to their local distribution facilities. |
Racking | Schletter Standard | | One of the leading manufacturers in South Africa for solar mounting systems. In addition, this product has been used for several already constructed and operational assets through Sun Exchange. |
Battery (BESS) | Freedom WON LiTE Home 80/64HV | 1 | A locally sourced and manufactured product in South Africa but have also batteries installed in over 60 countries worldwide. |
Regarding Energy Production, the Montagu Huis Van Velden array is estimated to produce 34.39MWh's/year with a performance ratio of 77.1%. The Montagu School array is estimated to produce 81.65MWh/year with a performance ratio of 78.6%. Both projects are estimated to produce a total of 116.04 MWh/year.
Interconnection
The Project will be connected to the distribution network owned and operated by SSEG. The Project applied for interconnection with the Energy Management Department and obtained the pre-approval for the installation of the 50kW AC Montagu School and the 50kW AC Montagu Huis Van Velden Hostel on 11/15/2023.
Once the installation of the Project is finished, the Energy Management Department will witness the commissioning process and verify compliance of the system 7-days from the request of the service.
Offtaker
The town of Montagu was established in 1854 and the first small school built in 1858. As the town grew, a new high school known as "Kanonkop-kollege" was built in 1921. The current school building was commissioned in 1959 and has evolved into a facility that addresses all the needs of a modern school. Today, Montagu High School is a well-equipped school with a beautiful hostel, Huis van Velden, located in the countryside surrounded by the beautiful Cape Winelands and the Little Karoo. In 2022 Mr. Johan Benadie was appointed as the principal of Montagu High School. Currently the school accommodates 472 students and 22 staff members. Montagu High School strives to achieve excellence in all areas to ensure that every learner may develop his/her full potential to become a balanced individual who will make a positive contribution to the country.
The financial performance of the school's operation boasts a considerably positive outcome, having passed most of Energea's credit analysis test scenarios. With a positive EBITDA for the last three years, high liquidity ratios on the same period, low accrued liabilities, and 65 years of operation, all tested under audited financials, it was concluded that the Offtaker maintains a low risk profile, achieving an 8.13 out of 10.0 score in Energea's evaluation.
The Sun Exchange Trust and High School Montagu signed a Power Purchase Agreement (PPA) on August 2, 2023. This revenue agreement requires the Offtaker to make payments based on the full number of kilowatt-hours (kWh) produced by the Project per month plus a fixed price for the rental of the battery system for a shorter term of ten (10) years. The tariff is adjusted annually on the anniversary of the Commercial Operations Date ("COD") date. The main terms of the Agreement are listed below.
Power Purchase Agreement Main Terms
Solar PPA Contract Term | 20 years |
PPA Rate | 2.60 ZAR per kWh+ |
Annual Solar PPA Adjustment | Consumer Price Index +2% |
BESS Contract Term | 10 years |
BESS Rental Rate (total) Huis Van Velden Montagu School | 12,018 ZAR 6,009 ZAR 6,009 ZAR |
Engineering, Procurement and Construction ("EPC")
Ntoza Fishing has been selected as the EPC partner for the Project. Ntoza and Sun Exchange signed an EPC Contract on March 11, 2024. Sun Exchange and Energea have worked with Ntoza before on solar assets in Cape Town. Sun Exchange and Energea performed due diligence on the contractor, and confirmed they are capable of installing the Project based on their past experience and the company's current standing. Sun Exchange will also have a Project Manager and/or Engineer onsite during the installation process, providing oversight, especially during the key install phases, to ensure a quality outcome that meets Energea's stringent standards. Ntoza will hold a two (2) year technical warranty starting from the date of issuance of the Commercial Operation Date notice, which will cover all defects and issues that arise after the asset is energized. The projected COD date for this Project is June 17, 2024.
Insurance
During construction, Ntoza will provide and maintain adequate insurance coverage at its costs, for all risks associated with the EPC until final completion. After COD and during operation, Sun Exchange will provide and maintain an All Risks Propriety and General Liability insurance for the project. In each case, Energea will be named as an additional insured under such policies.
O&M
The Operations and Maintenance ("O&M") services will be provided by Ntoza for the first two (2) years of operation. This service includes monitoring, reporting, module cleaning, preventative maintenance, savings calculations and any on-site IT or technical support. After the initial O&M term, the asset will be overseen and maintained by Energea and its subcontractors.
Financial Analysis
The resulting nominal IRR, in USD, of High School Montagu is projected to be 11.10%, with an estimated payback of 8 years, 3 months, and 10 days from the NTP date. The income statement, cash flow statement and balance sheet up until 2033 (shown annually) are presented on Exhibit I - Forecasted Financial Statements.
Energea is acquiring 100.00% of the Project from the Sun Exchange.
This analysis makes use of an inflation assumption, using the latest 5-year average value, from December 2023, of 5.00%, provided by the South African Department of Statistics, StatsSA, as a basis for defining the Consumer Price Index ("CPI"), being within the range of the South African Central Bank's target inflation of 3.00% to 6.00%.
Capex
For this analysis, it was considered, in the model, the latest EPC prices supplied by The Sun Exchange, as seen below. Value-Added Tax ("VAT") of 15,00% is assumed within the cost table below. Lastly, no interconnection cost is assumed by the Project.
Capital Expenditures Assumptions
Acquisition Costs | N/A | N/A |
| | |
Solar Modules | 261,071 ZAR | 3.68 ZAR/Wdc |
Solar Inverters | 242,690 ZAR | 3.42 ZAR/Wdc |
Mounting Materials | 125,179 ZAR | 1.76 ZAR/Wdc |
Electrical Materials | 665,615 ZAR | 9.37 ZAR/Wdc |
Civil Materials | 123,810 ZAR | 1.74 ZAR/Wdc |
Labor & Accommodations | 259,524 ZAR | 3.66 ZAR/Wdc |
Battery | 780,000 ZAR | 10.99 ZAR/Wdc |
Monitoring Equipment | 119,048 ZAR | 1.68 ZAR/Wdc |
Others | 222,762 ZAR | 3.14 ZAR/Wdc |
Hard Costs | 2,799,698 ZAR | 39.43 ZAR/Wdc |
| | |
Basic Studies and Executive Project | 23,000 ZAR | 0.32 ZAR/Wdc |
Commission | 10,290 ZAR | 0.14 ZAR/Wdc |
Contingency | 50,581 ZAR | 0.71 ZAR/Wdc |
Interconnection Consultants | 8,000 ZAR | 0.11 ZAR/Wdc |
Legal Fees | 20,000 ZAR | 0.28 ZAR/Wdc |
Marketing Channels | 22,500 ZAR | 0.32 ZAR/Wdc |
Engineering | 76,500 ZAR | 1.08 ZAR/Wdc |
Spare Parts | 51,905 ZAR | 0.73 ZAR/Wdc |
Soft Costs | 262,776 ZAR | 3.70 ZAR/Wdc |
| | |
Developer Fees | 374,867 ZAR | 5.28 ZAR/Wdc |
| | |
Total CapEx (All-In) | 3,437,340 ZAR | 48.41 ZAR/Wdc |
Total CapEx (All-In) | 182,256 USD | 2.57 USD/Wdc |
Revenue
The source of the Project's revenue originates from a 20-year term PPA with the Offtaker for a fixed $/kWh produced, readjusted annually on the anniversary of the COD by the ZAR CPI rate, plus a 2% spread. The average customer savings during the period is estimated to be of 14.06%.
Additionally, the Project makes use of a battery within its configuration, providing load-shedding protection to the Offtaker and creating a more stable electricity supply. For this reason, there is an inclusion amounting a fixed 12,018.00 ZAR per month, readjusted yearly, charged for the first 10 years of the PPA revenue contract.
This analysis used a 30-day billing cycle to realize each month's revenue.
Operating Expenses
Only an asset management operating expense was assumed in the model, driven by the assumption that it contains, under its scope of its contractual obligations, the aggregate work of all the required operations and maintenance for the project, as well as insurance, accounting, and other project related fees. The monthly value of the management fee is calculated as a 31.46% rake off the collected revenue in the project.
Taxes
No tax payments were assumed for this analysis.
Legal Review
Relevant Documents
A Legal review was performed in the Project's available documentation. The most relevant documents are listed below:
1. Power Purchase Agreement
2. EPC Contract
Power Purchase Agreement Summary
Contract | Power Purchase Agreement, as amended |
Signature Date | August 7th, 2023 |
Parties | The Sun Exchange (SA) Bewind Trust - As "Seller" High School Montagu - As "Buyer" |
Duration | 9 years and 11 months from the Signature Date, with the option to renew for a further period of 9 years and 11 months |
Object | Seller grants the Buyer a non-transferable right to use the Solar Facility in order to draw Generated Energy, located at 2 Kohler Street, Montagu, Cape Town, 6720. The obligation of the Buyer to pay for Generated Energy is a "take-or-pay" obligation and the Buyer shall pay the Seller the monthly Solar Fees in respect of the Generated Energy for the full Duration, irrespective of whether the Buyer consumes all or any of the Generated Energy. |
Solar Fee | 2.65 per kWh |
BESS Usage Fee | 12,000 per month |
Escalation Rate | CPI + 2% |
Escalation Frequency and Date | Annually on the anniversary of the PPA Start Date (date communicated by the Seller to the Buyer in writing as the date upon which the use of the Solar Facility will begin) |
Payment | Monthly, within 14 (fourteen) days of receipt of each monthly invoice |
Late Payment | Interest of 2% (two percent) per month |
Currency | South African Rand |
Insurance | Seller shall insure the asset from the PPA Start Date for an amount equal to the full insurable value of the Solar Facility, the premiums and any increases payable in respect of such insurance being for the account of the Buyer. |
Voluntary Buy-Out Option | Buyer has the option, during each Option Window Period, to purchase the Solar Facility from the Seller for the Buy-Out Price. |
Termination Buy-Out | The Buyer grants the Seller the irrevocable option to compel the Buyer to acquire the Solar, which option may only be exercised by the Seller at the termination of the PPA, for any reason whatsoever, including but not limited to the cancellation of the PPA pursuant to the Buyer's breach. |
Dispute Resolution | Arbitration |
EPC Contract
Contract | EPC Contract including Long Term Performance Tests |
Date | March 11th, 2024 |
Parties | Sun Exchange (PTY) Limited - As Customer Ntoza Fishing (PTY) Limited - As Contractor |
Term | 2 years from the Commercial Operation Date |
Object | Technical planning, design, the procurement and delivery of all necessary components, manufacture, assembly and construction services as well as the installation and connection to the Client's electrical reticulation and where grid tied, to the local grid, which is necessary for delivery and transfer from the Contractor to the Customer of a fully operational, turnkey Solar Plant, with a total electrical capacity of 71 kWp of the installed modules and 160/128 kWh, which is suitable for safe and continued operation for a period of at least 20 years after it is connected to the electrical reticulation. |
Construction Contract Price | R 2,858,602.38 (exclusive of VAT) |
Rate Fluctuation | Should the ZAR/USD forex rates fluctuate by more than 5% before NTP, the Contractor shall be required to reprice the Construction Contract Price in accordance with the forex rate fluctuation. |
O&M Scope of Works | The Contractor shall provide Operation and Maintenance Services, from the COD and until the achievement of Final Completion. |
O&M Contract Price | R 76,666.67 total (exclusive of VAT), to be paid in equal and quarterly payments. |
Delay Liquidated Damages | If Contractor fails to complete the works by the due date, the Contractor shall pay the Customer Delay Liquidated Damages. |
Performance Liquidated Damages | If the guaranteed performance ratio or guaranteed availability is not achieved, the Contractor shall pay the Customer Performance Liquidated Damages. |
Warranty Period | 2 years starting from the date of issuance of the COD Notice |
Performance Guarantee | As a condition to achieving the COD, the Contractor shall obtain and deliver (at its cost) to the Customer a Performance Guarantee as security for its proper performance of its obligations, in an amount no less than 5% (five percent) of the Construction Contract Price. |
Governing Law | South Africa |
Disputes Resolution | Arbitration |
Documentation Checklist
Design and Application | Bills | X |
Helioscope Reports | X |
Meter Data | X |
Site and Roof Assessment | X |
Self-Consumption Analysis | X |
Interconnection Application | Interconnection Application | X |
Permission to Install Letter | X |
Offtaker | Offtaker Credit Analysis | X |
Power Purchase Agreement | X |
Incentives | X |
EPC | Construction Set | X |
Equipment Warranties | X |
Equipment Qualifications | X |
Equipment Datasheet | X |
EPC Contract | X |
EPC Insurance | X |
Asset Management | O&M Agreement | X |
Asset Management Agreement | X |
Investment | Project Model | X |
The Investment Committee members have performed the necessary review of the Project and hereby approve the High School Montagu Project for investment by the Portfolio.
Signatures
Pursuant to the requirements of Regulation A, the issuer has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
Energea Portfolio 3 Africa LLC
By: Energea Global LLC
By /s/ MICHAEL SILVESTRINI
Name: Michael Silvestrini
Title: Co-Founder and Managing Partner
This document has been signed by the following person in the capacities and on the date indicated.
By /s/ MICHAEL SILVESTRINI
Name: Mike Silvestrini
Title: Co-Founder and Managing Partner of Energea Global LLC (Principal Executive Officer, Principal Financial Officer and Principal Accounting Officer)
Date: July 22, 2024
Exhibit I
Forecasted Financial Statements