you, seen barrels first the when prices collars we X,XXX want hedge oil and per decline below oil approximately XX in and these to we've gentlemen. I $XX. entered good paying oil and Thank if the Earlier this was begin address last for days. year a morning, day at $XX of over ladies Tabitha, barrel oil goes
how is was priced this for oil the our oil, reference forms Brent which at $XX.XX morning.
wells to to if we three we this four moderate scheduled necessary. have additional an While this can drill year,
have XXXX. obligations for fulfilled our of work We already all
existing ongoing wells blended $X operating barrel, approximately production our very our of remains our profitable. at With expenses per
which taken if zones have analysis be two not in if have -- drilled existing able Bahar fields, wells, to our completed we productive have cores. data This after us recently should our Yeniev additional have wells. first, we and tell in on which We we
many measure that of to wells place can better us give and these how so fields. wells oil determine we from optimally our produce Second, existing it in are should better drainage required
composition the us third, pressure the ultimate rock, it help increase And we so will maintenance fields. physical implement reservoir waterfloods better the can the most and likely recovery of mineral of in wells the and understand appropriate
wells the individually. Addressing
this well through wells and to The we our the have was in past. producing We core immediate drilled structurally Yeniev-X came entire the recovered section. drilled over First during other Bedinan Bedinan Bedinan wells. a the high
core analysis expect will us month commence We by which completion end, allow to operations.
has has of oil negligible And well natural one number now water. flow barrels than natural with the The number XXX,XXX likewise by two less of over over flow produced XX,XXX of XXX water. barrels with barrels by made oil
We drilling over well. was in We both just upper the extensive number this upper came and drilled Bedinan structurally preparing as FX logging sands. FX the through to Bedinan formation Bahar case we XX. FX, Hazro expected. It and now We're finished the cores and in recovered zones
August well. We as the not to expect is operations analysis practices from core the commence completion early completion to time-critical the results in as Yeniev-X as
one. a in drilled Basin well also shallow Karli number We Thrace very the exploration our
the further south this two test gas Equinor center immediately to equivalent our acres XX,XXX whether believe several This this deepen well. to And for over zones blocks the are by work of encountered or us. the their the complete next fulfilled of updates block basin we approximately accumulation or our evaluating are on quarter in tested Valeura anticipate and sand geologically We and and being block XXXX Temrez we year. obligation to
will well Our the Yeniev-X. next scheduled be
wells our have oil Molla in and and in of drilling. expect cores These to We the we cut shows many are from two this while well. block intervals formation recover of Mardin gas intervals
Bedinan the the sections due intervals producing deeper intervals drilling our blocks to understanding completion productivity limited These ongoing these to objectives in are attempts these the of our formations. Southeast potential in really productive of primary of the Hazro Turkey. in on previous and zones the cloud and the region Our lower the
us place potential. to Future understanding and less cores well. of much our and a potentially these production in than of saturation oil a give oil-water better wells would intervals half deeper expect Bedinan We cost to
Now at formally Hazro. on as to a some of the barrel the production per well Eastern has awarded day earlier of Turkish Molla follow-up by XX barrels XX produced months and several Blackeye one oil as government. from We the Karagoz The were wells. also known water license the block for now
that room shows of Molla and the license lot might in depth have the secure, we Mardin Now well that a uphole license. we in is block our test running that of on
fracked a was mechanically put other it tested have this barrels Our Bedinan unlike a natural. of on which year, drilled we the well Southeast water We open rate wells from just and the and XX barrels hole a oil difficult expensive of and well well pump. oil Bahar of eight at approximately day this
We and expect know in its capacity about what to productive is month. better a load recover
expect was productive weekend by was just from unstimulated we'll to a flow preparing well producing sands. and fracked understand natural run Pinar the month originally required -- has drilled likewise We're well. potential oil well this We now been the in this be a to pump it about last XXXX of upper and and Bedinan
production the And planned exit our of can offset than rate. ahead over then wells, completion can year's production decline of all discussed few we wells if the our of year the will we past more the drill last expect months. We
to financials. review will now Michael hand Hill, I call quarter's Accounting to the Chief our the Officer