you, oil barrel Thank I August. decline about prices a morning recent increased the call At that pleased the addressed quarter's everybody. in of have to last and announce beginning that call, I'm $X to oil and in since price, Tabitha, good
barrel So up and to we're were. were to we from now close about we $X the down a back second the third quarter, to where
So revenue. helpful that's our in very
review continue governments both monitor remain quarter, U.S. in the been legal ordinary sanctions We resulted and decrees from not Syria we have do operations with and in actions will of do in expenses and to have changes the date, actions the U.S. out these the affect between compliant reciprocal expect regulations. to October, and talk and us. speculation early were of in proposed Turkey. in Beginning fourth unaffected the government to we to both media incurred To some
in our wells, conditions sidetrack year-end. re-drill Goksu wellbore well drilling allow we for field planned completed and now an we may the before additional We've had XXXX. If
reported, XX we laboratory recovered in successfully at to our Bahar X in cores We number Yeniev-X originally well. cores previously intended and our Petroleum's these As had Turkish Ankara. wells in process
initial reserves and all us the cores for result the think of these near a our core has of analysis. core to our budget. and results will spacing year-end and well be plan. required completions re-box This completing processing. XX of determine to decision in made XXXX XXXX At to it receiving January, some in our results will pushes the or the before that ship This our would in to I time, slowed and Yeniev-X, Houston cases, After a from work we the about XX delay our later first well this receipt will work budget we publish
on completed Yeniev-X drilled the result Turkish forward or updates some wells was Going Bedinan specific Petroleum's on lightly the predicting with water We flow no analysis has call. completed very as and we of XXX% daily well that core a the barrels last the since by zone would natural from well the water the and basis. XXX oil a of well. just been approximately have perforated production producing with
We this capacity double. stimulate expect approximately and will productive shortly will well
this which other indicates for field, ultimate to Reservoir in reservoir. is recovery total the good connectivity our pressure from wells
than shows Bedinan in well. Our there decision to of Yeniev-X shows drilling rather made encountered stop significant completion two drilling the and intervals attempt the We onto Mardin. these oil the and after this
there. day barrels established zone. oil now in was at a production zone zone completing oil the to XX We're secondary have Baluca a that's established and [ph] primary zone of New approximately Karababa production C the the XX and
on stimulation to and this as we well. and later back this next analysis design yet the have We stimulated our a week week to rock well have do execute not hope early core as
was Our on Yeniev-X our in cased drilled prognosis. geological as zone and encountered expected and and Mardin well the Bedinan shows
it'll of well, just this activities be another on couple We weeks completion comes before beginning are so online. that well
Our intervals in oil flow barrels both natural with and daily. by Bedinan Bahar Pressure test resulting was and of offsetting XXX drilled two production indicate fractured number completed in wells. intervals communication of XX
We results best the in core need the field. spacing to for wells reservoir Bahar in will determine future well this
the the We the Bahar expect zone additional of in Hazro additional reserves and delineate horizons further analysis cores of to field. potentially
formation. it to Lastly reentered and well Bati-Yasince we FX the the deepened we Hazro
Hazro well. So completed. in FX tested the quarter, and non-productive far Karababa C is Beluga Third being the The now have zone
rig availability shortage the has down near ability not of end limited and and and quarter October, on resumed schedule was of the crews that and we our that workovers September a bit result to a mechanical, of had August, that and was conditions. reservoir During so a completions, production
XXXX. said I unit expect than -- higher to continue we XXXX resumed to a As crews and availability on exited production rate full has pulling workover at we exit
Chief now Michael Officer to the our hand will the Accounting call to over Hill, I financials. review