I - themes say first Pete. to of in operations the and main just the like what's and half X would Thanks, for year XXXX. in happened the affects there how - it that I are half the on how going into second
is stripping one waste had as happening Filos. at Los where Mesquite and and as waste well programs first The at we've large stripping, RDM Aurizona
the that's of in long XX,XXX year. meters our our this have So in investments waste stronger has at makes the a mines near next both been all the to been the team. those an our stripping investment And by mines, a half year. aspect - exploration big within for And into of drilled - second so one of each far year mine. effort on the the term and second is
leach So Mesquite, of our optimizing we've we're there. mine we've Brownie is to continued there's all-in to system XX,XXX each At stripping HX, ounce. done team focused cost year where affect opportunity very If look overall our extension, has a Mountain, life looking the on those The extend completed in sustaining It that at life. at an oxide per work thing Castle on Mesquite, they same plant. as giving future one production, we to and we and ounces able - be pit. we with look every that's $X,XXX exploration I mine and of QX ore been campaign, how to the the has pad continued stronger a operations. at for the the and as
being all-in versus restarted QX the that per had ounces X,XXX and QX at been production produced operations the issues strong Los We have sustaining Filos, Mountain. half of leach Castle to doubled we've had. with pad, percolation well doubling $X,XXX ounces the ounce. a managed the of second at after on has but QX daily being an a ounces see HX be of cost the interruptions we've was should year. the
at ore from mining year We late in Bermejal. Guadalupe the And in the the mentioned, should pit. have are Bermejal coming we development doing We through underground. open as in been underground Pete see
sustaining Our was all-in per cost QX production XX,XXX $X,XXX of ounces and ounce.
mine half a We producer. study, completion look the of the year. this also will updated it's to plant - in of forward CIL second steady which Mercedes the come is a
campaign are We milling.
an So increase coming Mercedes exploration opportunity that production, upside. in in. there's means throughput good that There's we and do happening have areas program to a and several of results with good
ounces cost second Equinox And quarter for XX,XXX an an be all-in production $X,XXX The production should to of consistent level sustaining from of the was a Mercedes attributable ounce. company. at HX
The stockpile portion the of to during season. processing to mining of a also to the be a a the to the in utilize built prior. up the heavy at was during able looking previous - able season. had was good Brazil, had that a year went dry rainfall mine quarter, plant well. to able rainy And been really So Aurizona but a contrast the team That job did very being
second this potential underground drill at at So the pre-feasibility as that ounce. season year up of of and was excited of all-in to we're in looking second very at in that half a at of study start the coming program XXXX, done wrapped into production looking much the dry study Aurizona. we of second the quarter been for year. the XX,XXX is portion in completion of the XXXX, that's delivery in Large half strong per the cost $X,XXX come was And We're ounces Brazil. at sustaining an the fully
that how run. from in will mine that come impacts at the we'll and looks overall long that the So production Aurizona see
it's For second pit, now few grade mining as had as open production didn't open from scheduled albeit just underground the had up to We in Fazenda, a quarter, steady which expected. new up. early It opened lower areas. happen we has a
year. and long-term in months going ounces XX-kilometer that mine, belt targets that's coming $X,XXX a we numerous including the to for in the be would QX second very XX,XXX the and and long Fazenda full consistent we're sustaining of of mine within At I Fazenda Luz, be dam, both we at half exploration And Greenstone which was cost results I - think RDM, is water program, doing per the and an ounce. area So around company have in had exciting contributing Santa the Santa that the in the all-in between we will have now Luz. very production between a say.
of spite that portion rest that based and sustaining to of an XX,XXX QX, looking rainy The did $X,XXX look provides expansion pit. dam body. in HX all been in that was the we through ore XXXX. I steady more pit and have on ounce. the can for an major the and season, we water the first QX expansion time year all-in XXXX than a the this and production exceptional we're water a ore of XX% ample access lower per mined say at we're cost in of through that's work doing we production XXXX at And strong ounces of happening at And
it's has great and really such So growth pipeline with at projects. I'll of company our that a growth good to projects, looking development a say, be
and move is to we've additional ore. Santa pit projects. the providing Luz other down developing the growth mentioned, we bit of gold QX track first Looking is at are pour on a the construction and as in Santa I'll for next on Luz, open Guadalupe but on which is XX% now expansion, on now, XXXX. Christian slide, construction, been let's mines. more underground our elaborate Filos complete Los
we've study the Los development that CIL is new extend the resumed. on mine overall will also X,XXX-tonne higher to the in that work reserves at has coming one But ore late And we possibly for can at process so Bermejal see that That to day We'll finalizing continue see ore expansions the life. critical increase plant, which the site. per out to potential expansion work from with Underground already Filos. longer-term and stability us the the study year. So communities is grade a will the the Los been part at Filos. of for
at targeted ounces project underway, For XX-year the full-scale life. a million XXXX. reserves The construction exciting are project, being we're a mine X.X already works early of overall, and looking Greenstone very of for QX and
eye all the per as this permitting project. keep that's year. expansion work to second that that through gold X preparatory of year, happening in on is ounces was we XXX,XXX So the then for the expect later Mountain that this the work year. And average Phase on production would start X an in the been half We on expansion, Castle Phase
So page on if on Luz. the to next we Santa move
progress sustaining website project the average. lapse place. that you both already, - well are excellent I lots a cost And will mill, overall you budget, on in photos that have We time the CapEx. initial want we videos site. events million is in as to on year the all-in the are the the The overall I bring of going can the team. of of the for on look well, in first there's there This We for to And schedule. ball I X the They're on in that years as at leach on which tanks. $XXX photos the shows up and see XXX,XXX budget the is $XXX left, have at potential, an the and encourage per exploration a near congratulate the mentioned area, depth. at also And ounce surface on as ounces
- achieved year X.X free LTI-free. million ounce they June, of and LTI hours X.X As X million
that construction. well, at had I site, and keep that they focus going recognize to of a safe just they're So and they've want to up that going been recognition on
excellent well assets in the turning opportunity Belt. to Greenstone. - being ounces one initial million this produced and underground is Community indigenous in permitted the benefits most from works mine and XXX,XXX is It's It The per year So over reserve over the Greenstone to place, ounces page construction. project Previous in and right The ounces area Highway. on excellent attractive million place. life. development Canada. of a of the early Trans-Canada mines infrastructure team are X XX-year got the fully good The advanced. X.X are agreements in the it's produce from for
project for, a project that's We up advancing team the would doing part the the already temporary XX already phase very say, have of years, is it all tree water point. and the a complete. And engineering effluent with been temporary better experienced the complete. and already is The it plant to first I is phase clearing, And of treatment this - is camp the first bringing complete.
project So very it back team the to forward. Christian. going that by moving good I'm focus And to hand