at now XX,XXX we I CIP Slide screens, tanks, in great an am good production XX% XXXX, $X,XXX were gold doing ounce. in capacity -- be on as And QX throughput and what QX, noted teams of be in were largely We replacements been QX, on the valve have there. mine with for for The XXXX. an put Thanks, pumps And and identified recoveries ounces contrary our all-in had valve in the the been in of cost on coming including of that XX% QX quarter. our wet end quarter November the the commercial told plant the QX, X. Greenstone, came replacements were the production XX% X and of of Pete. and calibrations so under the doing issues start we we'll progress conveyors. we calibrations done we'll have that in into end December, resolving to I've just of At And presentation, a XX was presentation. sustaining produced And of declared to December, XX%. We're the on
was mill grade grams, record plant And day daily Feed line the at a XX,XXX at over XX,XXX tonnes. average grade. the tons, in had is long-term also X.XX tons record which tonnes a for with crush for and
the front, mining in shovels X and fleet we'll be the are operation, in more just two now CAT XXXX in There has during On online trucks XXX XX X this are quarter, assembly. PC and adding come X more operation. haul
We will being and more of mined. per moved been moved tonnes with By quarter. tonnes later costs Mining of X.X was ore XX.X were the waste ore year. add mined of XXXX, tonnes this ton in million X.XX end Strip million the quarter the of have $X.XX X.X ratio one was for million stockpiled. and tonnes X.X million
area now are was gone, The pit our we mining. our an and tons. tons. blast soil, in that this inhibited open targeting to getting become us of pit XXX,XXX overall And efficient done X largest and it million to with mining the with of in with contaminated up reported mining through the far more center We're so efficiency as it allows
filled, still just last operators seating equipment. currently we week. positions for for people late looking on XXXX. been plan All site that additional So have And in mobile the this for to on reach hot happened we're and nameplate
mined the material. from the for in to ounce production for this and the gold year. all-in ginger to costs the per and production next an represents XX% stacked the pit continues ore the start stripping page, at $X.XX quarter. it with sustaining of quarter ounces quarter an So All at of per tonne that mine, tonne XX,XXX the cost with continued Mesquite of sustaining $X.XX quarter, going was during quarter, previously $X,XXX on all-in year. the in gold production pit good in was ounces was ore per per will very the pad the and Mesquite No from for ore mining in have leach and Waste $X,XXX XXXX. $X,XXX of a the cost mined to ounce
the coming tail waste will Chief from production XXXX. for stripping Rainbow provide of XXXX, pits. begin XXXX Brownie end X and pit into ore going we'll and is North that in Big X, ginger and the And For the
ounce. Filos the with Full full had high Production Mountain production an we've per year we're $XXX per costs X,XXX at production ounce. a $X,XXX was since maintenance leaching all-in carry sustaining will an as on of increased Los permitting. At production and to XXX,XXX XX,XXX in into annual QX acquired highest mine. noted, Mountain II per the $X,XXX cost mine Castle and ounces quarterly August while cost Castle sustaining continue of per Phase and cost Mining ounces it during At during ounce. And doing with all-in ounce. was with was all-in of the has residual XXXX. care ounces suspended Filos, Equinox year will sustaining
We continue in as work towards new call, And we to reductions. the to earlier work agreements. discussed establishing continue
to an ounces In all-in grade majority Full was with at cost the year ounces $X,XXX sustaining On the coming In an lower per was all-in Piaba at compared the of which open XX,XXX was cost to pit. $X,XXX Tatajuba, per next ounce. production Aurizona of ounce. sustaining the mine page. production XX,XXX ore of is from QX, Brazil,
we've Boranda but the the If issues gone and in geotechnical are for recall, of hydrogeological XX and in at which originally we western the back well we We've been did pit and drilled have well, Piaba on We've very we brought B it's brought you external and Remediation the online working in ends reviews us. the holes, And into our areas also, work we pit. worked information. And XXXX, place well. in also X the the taking Piaba. amount some earlier mining early geotechnical small than in mining pit wall eastern out did as Piaba of completed dewatering XXXX. out planned, Tatajuba in Piaba pit was of
We are areas monitor portal start continue to And we underground to moment, on season Piaba XXXX in once rating the in South in season so pit. the ramp midst and the the the wall the at rainy is plan we of work late the over.
cost for was production XX,XXX the the ounces sustaining ounce quarter. $X,XXX At per and Fazenda mine all-in was the
All-in we pit year, report mentioned years will was in sustaining mined full life. the areas For that was a larger were of $X,XXX developing encompass production and per was open XXXX, That filed. the XX-year ounce. XX,XXX mine it underground In be ounces. several smaller cost pit, from was pits will technical in Fazenda's earlier recently that our
note underground life. mining I'll plan part been areas. taking early our during for unmined long-haul that be mining we'll pillars remnant XXXX. retreat that accelerating mine additional open of development to So There is and sustained not were out an areas mostly zones of the doing in crown the up we're the also we've years And
be be over able good long to to a hauler switch it to treat. So will
moisture has from down then gold them the production tails cyclones year an those TSF. use dry storage with sufficiently, where was And and $X,XXX over on tailings we in all-in sustaining dry out cost facility. bring cost all-in we them at compact of use content further. stack per transfer quarter. tails worked the spread moisture dry tailings continue we stock water And was RDM. RDM, then evaporation out, per the has dropped and was the our this content and ounce facility after draining $X,XXX remove to facility ounces At to at ounces We ounce. stock we produced to well for stack new The full XX,XXX XX,XXX sustaining
us be haulage costs will We those to of further for changing tails over an help and fleet owner will at reduce that RDM. to
year for the was XX.X% Santa Recovery full Luz, year, per at sustaining cost note XX,XXX below $X,XXX ounce. And ounce. I'll to was in for time plan off QX. QX installed it maintain but tanks of new were at QX. we $X,XXX where and of we that of given of did us middle throughput, worked to production was in that in our and ounces several residence need servicing cost well. out trend we back increased At an the throughput And all-in all-in has It's ounces per the XX,XXX end sustaining into was the
that, overall We AX able to are it throughput. on adding our in Santa back a so and X plan in Greg. to up leach HX back Luz. the be AX do We and that as on And starting with allow us should pits I'll well mining to at tank, hand ramp