Okay.
-- have mention we to addition reduction of working group on been that that continuous a have, In also that the and involves well production improvement all are I'll initiatives. program minds purchasing as consumable our as guidance
We've of All forward. and and mine geared for beyond forward work, and which that achieving all cost is guidance. improvement and towards down doubled what plans of adherence put put we've we've beating and our our on what benchmarking reconciliation is productivity above production also
were that mines, the mainly award East. and to QX, on we Mesquite. QX. cost that see smaller see at a low Looking mesquite to new contribute ounces Due and in in that That phase have number in had means going at XXXX. that'll relatively Brownie of plan mine to going will under period. less the adopted in leach for Vista ultimately And XXXX, to for order the We pads the in new stripping stripping -- stripping individual we emphasis in we'll pits a a reduce
expiration for mine at extensions. with life permitting continue We and work Mesquite
is glomeration X, same Phase to running and mine glomeration bleach we our have back advancing we working Phase as of on our the pad. all The in crushing run on of increasing going that in time, throughput. both X Mountain, test working of come work, plan Phase X been work we and I'll permitting on QX, crush later on. Castle we'll to so support the were continue with the and At met that through be going heat and In the glomerations, crushing should material the and
by caused a supplier. At Los at Filos, to related production in our QX, we shortage explosive strike a was impact explosives had of a that
We over a also from pit. leach -- had the Guadalupe it higher had some that reduced or the copper the open meant cycle. recovery It content, was which coming had of a that
that to ore So, we're the be able now feeds. that to the separating Excuse me. of separately leach rest from
Filos at Los As the well in of Guadalupe XXXX, we with open mining tons we Filos and the pit, open underground pits. XX% as look open the coming pit continue Los from as
development suspending will We that's than anticipated. prolonged the period and lower be underground, Bermejal productivity given the
Just to zone in context, underground. down central have put Bermejal to of developed five it the we
per XXXX We've need to be in time to production development able in the it, enough mining tons we additional to been achieve to order accessed we've same significant into have XXXX to it, the but scopes at and day. from do
in and this the into reduce eventually at overall at be to the also fed be a to improve So, plans look order And able productivity the for we'll costs. higher-grade to plant. we'll be meantime, CIL timing looking
than we our period. grades articulated extended longer rainy material we and additional XXXX, in had meant trucks. of normal a with year go contractor than had into plant of we fleet Arizona, over stockpile more lower six mining relied by XXXX the the end season of which their on In By usual, QX, and an dump in an increase an addition the an
back to so, higher total And worked removing mine we plan. -- towards moved our a returning being had tons as we
mining have our XXXX. who come XX will fleet, continue we a also significantly build mining want expanded and we once out of dump through contractor of a season course up articulated the we in rainy the that start season at this the second to And we rainy higher addition come In bringing the were year. stockpile to trucks stronger during a with level so
to recoveries mines In well and plan continues at tons reserve and the Fazenda QX higher this Fazenda, open mining in underground replacement. to on Fazenda contributed very the Throughput resource plant year. production that work came at our year, above the mine pit overall, offset grades did the overall the for expiration were work and lower and and from and both
the Luz. expiration the continued also Greenstone We program Santa Fazenda and Belt in between
material we for and At the material in permitting RDM, January, we've dump were mid-December grade restarted equipment. for owner And we waited in but mining QX, processing we in dump low suspended additional as at of processing operated material the using we're init RDM.
We for filtered rays a at also tailing facility we've completed TSF RDM. begun the permitting and storage
Santa difficult. was Luz, had throughput We of to the at the QX ore. lower due Looking hardness
We so and activity we also recoveries. takes and it days which the on perform time -- sulfur to system deal with be content a --. properly to with related to some And several the that, cyanide ore recover. to again. can regenerate had the able Each that that twice. resin overdosing From have had it cyanide our to we happened the happened, It high also the of impact impeded resin,
So, were overall achieving operators leach carbon by the leach previous note, processing. higher than will in using than, I is plant resin possible recoveries
So, in are it we increase higher but a still plan pit, and is that's we've also end, fragmentation January open a since an to had recoveries seen working in also, the strategy as issues. through stabilization come we've By we December, enabled of us adopted the and changed working, and of blending our some through new And throughput. achieve February. year we
on to Greenstone. Equinox. Greenstone's Ultimately, for the become going to Moving cornerstone
It's of goal ounces million-ounce a the five and got first half production projects of XXX,XXX and half first production One the annual in Canada. reserve, XXXX. of coming largest in a
Slide. next the Onto
with are budget just injuries. on at lost has complete and The no is We XX% on track. hours time the and X.X moment, project team the million passed
be fully a also one we the with use. So, QX end have and slide, had several the the four the being as We're And started coming, in They've with at will enclosed. this on trucks the record. added shovel great shovel, buildings capital of Mining second in additional trucks half second you the progress see and now ready the year. getting of four good and complete can for XX% spend of in year.
building see the off of be slide, the as a expect buildings can one several of and which of move photos Four enclosed. finished as if The claddings I the And building, to the East and I'll of roof being next this End are saw just buildings week was has you and the we heated, next yesterday. you note that the to more Mill the the already and buildings enclosed two buildings. done HPGR coming is the already last week, well as on the in lot two of
well. it's really So, progressing
Greenstone. moving the for just this the of the milestones on to The closed So ones commencement installation. main page, ball quarter next upcoming buildings mill being are
move be in piping QX. as We equipment will site And we and will happening the In we'll start. will mechanical buildings. the all QX, electrical on be inside installation
the and and of of four. pre-commissioning will plant relocation by circuit. at commissioning And the completing looking the in power completed, crushing be highly be half QX we're TSF first the will we're and Gulf first QX, In and XXXX the
application over on and page day to around a are other ounces pads XX,XXX we're the projects see XXX,XXX We increase moving in going Mountain, permit next a life. expansion year stacking we'll in include And the Castle production per leach where to an -- submitted tons over of to the XX-year March.
public We in scope process We'll first permitting. the environmental the happening continue review, half through of working XXXX. see of and scoping
in the which on involves QX. pits. wrapped working the mining from from feasibility time, will At we're feasibility open be For same both underground. as up study Bermejal Arizona, That the mining study, we're
we noted, locations. received three As permits Greg for portal have
one would and program it production be could able so expiration series on the so as location, to have initial mine from for also the also decline. selected touch We would us and look ultimately cutouts allow dimensions to that at we a establishing it a serve underground, will for ramp ore. ramp establish a time, we we same ultimately drilling do can expiration of and would At into that a be that
on a a we for period -- decision, delivered in our CapEx was operational and CIL study will XX,XXX we've feasibility we're on high make Los in On we of reserves were while with noted plant XX% a the we'll Filos, after taken previously, also account. into that making study having communities. construction wait while construction a day and depletion as But per for the efficiencies Greenstone, increased we local updated stability work
I'm So, to to back going pass it Greg.