Prices used by RPM are based on the 12-month unweighted arithmetic average of the first-day-of-the-month price for each month in the period January through December 2020. For oil and NGL volumes, the average West Texas Intermediate spot price of $39.54 per barrel is adjusted for quality, transportation fees, and market differentials. For gas volumes, the average Henry Hub spot price of $1.985 per MMBTU is adjusted for energy content, transportation fees, and market differentials. All prices are held constant throughout the lives of the properties. The average adjusted product prices weighted by production over the remaining lives of the properties are $33.93 per barrel of oil, $8.40 per barrel of NGL, and $1.284 per MCF of gas.
Operating costs used by RPM are based on historical operating expense records. These costs include the per-well overhead expenses allowed under joint operating agreements along with estimates of costs to be incurred at and below the district and field levels. However, these overhead expenses have not been included in the confirmation of economic producibility or in the determination of economic limits for the properties. Operating costs have been divided into per-well costs and per-unit-of-production costs. Since all properties are nonoperated, headquarters general and administrative overhead expenses are not included. Capital costs used by RPM are based on authorizations for expenditure and actual costs from recent activity. Capital costs are included as required for tubing installations, artificial lift installations, new development wells, and production equipment. Abandonment costs used are RPM’s estimates of the costs to abandon the wells and production facilities, net of any salvage value. Operating, capital, and abandonment costs are not escalated for inflation.
The reserves shown in this report are estimates only and should not be construed as exact quantities. Proved reserves are those quantities of oil and gas which, by analysis of engineering and geoscience data, can be estimated with reasonable certainty to be economically producible; probable and possible reserves are those additional reserves which are sequentially less certain to be recovered than proved reserves. Estimates of reserves may increase or decrease as a result of market conditions, future operations, changes in regulations, or actual reservoir performance. In addition to the primary economic assumptions discussed herein, estimates of RPM and NSAI are based on certain assumptions including, but not limited to, that the properties will be developed consistent with current development plans as provided to us by RPM, that the properties will be operated in a prudent manner, that no governmental regulations or controls will be put in place that would impact the ability of the interest owner to recover the reserves, and that projections of future production will prove consistent with actual performance. If the reserves are recovered, the revenues therefrom and the costs related thereto could be more or less than the estimated amounts. Because of governmental policies and uncertainties of supply and demand, the sales rates, prices received for the reserves, and costs incurred in recovering such reserves may vary from assumptions made while preparing these estimates.
Our audit consisted primarily of substantive testing, wherein we conducted a detailed review of all properties. In the conduct of our audit, we have not independently verified the accuracy and completeness of information and data furnished by RPM with respect to ownership interests, oil and gas production, well test data, historical costs of operation and development, product prices, or any agreements relating to current and future operations of the properties and sales of production. However, if in the course of our examination something came to our attention that brought into question the validity or sufficiency of any such information or data, we did not rely on such information or data until we had satisfactorily resolved our questions relating thereto or had independently verified such information or data. Our audit did not include a review of IUH’s overall reserves management processes and practices.
We used standard engineering and geoscience methods, or a combination of methods, including performance analysis and analogy, that we considered to be appropriate and necessary to establish the conclusions set forth herein. As in all aspects of oil and gas evaluation, there are uncertainties inherent in the interpretation of engineering and geoscience data; therefore, our conclusions necessarily represent only informed professional judgment.