2 | Grid Connection Line from Party B’s Power Plant to Party A’s Grid |
| |
2.1 | Grid connecting point: connecting to Party A’s110 kV Pingyuan transformer, 110kV Dongjiao transformer station. |
| |
2.2 | Line name:110 kV Bingping Line, 110kVBingdong Line. |
| |
3 | Party B shall provide accurate other technical parameters of the Power Plant based on the equipment designed parameters and the result of grid connection commissioning. |
| |
3.1 | Normal operation output range |
| |
| The maximum output of the normal operation of all units of the Power Plant shall be100% of the rated capacity; whereas the minimum output of the normal operation of all units of the Power Plant shall be25% of the rated capacity. |
| |
3.2 | When the grid is in a special circumstance, the maximum output of the all units of the Power Plant shall be100% of the rated capacity, whereas the minimum output of all units of the Power Plant shall be25% of the rated capacity. |
| |
3.3 | The capacity adjustment speed rate of all units in the normal operation period shall be1MW/min. |
| |
3.4 | The shortest time from the receipt of the dispatching instruction to the transmission of the output from units to the grid, or from zero output to the rated output shall be30 minutes. |
| |
3.5 | The shortest time from full-load output to zero-load output after receiving the dispatching instruction shall be10 minutes. |
| |
3.6 | The shortest outage time from disconnection of the units from the grid to the resumption of grid connection shall be15 minutes. |
| |
3.7 | The leading-phase capability of all units shall be95%, the units’ actual leading-phase capability shall be determined by the results of the leading-phase test. |
| |
4 | After the Power Plant has been launched into commercial operation, if Party B is aware of any change to the unit operation parameters resulting in its inability to reach the technical indicators prescribed in Clause 3 above, and therefore the relevant parameters need revising. Party B shall give an explanation to the power dispatching agency, and submit the test report confirmed by a qualified organization. |
Schedule 3 Division of Scope for the Dispatching and (Property Right)
Administration of the Power Plant’s Equipment
(1) Party A’s dispatching and administration scope:
GeneratorsNo. 1 - No. 5,main transformersNo. 1, No. 2, No. 3 of Party B’sBinglangjiang power station.
(2) Party B:Binglangjiang power station’s110kV, 35kV, circuit breaker partition, line and relevant equipment.
(3) Party B: area covered byBinglangjiang power station:
Other equipment other than those dispatched by Party A.
(4) Except Party B’sBinglangjiang power station’s generator No. 1 - No. 5, main transformer (generator-transformer unit)No. 1, No. 2 and No. 3, and relay protection (including in-service and off-service operation and adjustment calculation) is under the administration of the Power Plant; the dispatching and administration of other secondary equipment shall be determined as that of the primary equipment.
33
Schedule 4 Name List of the Dispatching Centre of Yunnan Dehong Electric Power Co., Ltd.
1. Director of the Dispatching Centre: Zhou Mingshan
Office Tel: 0692-8893011
Fax: 0692-8893012
2. Head of Dispatching Division: Wang Shihong, Tel: 8893018
3. Head of Method Relay Protection Division: Luo Liyan Tel: 8893012
4. Head of Telecontrol Communication Division: Li Yongjin Tel: 8893016
5. Dispatching personnel on duty
Dispatcher on duty: Zhou Yunfang, Feng Yue, Peng Wusong, Jiang Yulan, Qu Meirong
Deputy dispatcher on duty: Li Jinghui, Yang Changkui, Wang Zhongwei
Tel of the dispatching office: 0692-8893000, 8893001 (Fax)
34
Schedule 5 Name List of Persons in Charge and of Personnel on Duty of the Company and the Power Plant
1. Company Name: Yunnan Huabang Electric Power Development Co., Ltd.
Legal representative: Luo Yuejin
Contact details: 13988259600
2. Name of the Power Station: Binglangjiang Power Plant
Person in Charge:
Yin Yizhi (head of the plant) Tel: 0692-8910469 Mobile: 13988225940
Huang Jinxue: (deputy head of the plant) Tel: 0692-8910458 mobile: 13988233465
Zheng Xudong: (deputy head of the plant) Tel: 0692-8910456 mobile: 13578230696
3. Personnel on Duty:
| | | | | | |
Operational personnel of the old power station: | | |
| | | | | | |
Team No. | | Person in Charge on Duty | | Personnel on Duty | | |
| | | | | | |
Team 1 | | Wang Yanfang (13578201360) | | Zhang Shuwen | | Dao Hounan |
| | | | | | |
Team 2 | | Chen Shufang (13578254778) | | Li Shengfeng | | Li Shanchao |
| | | | | | |
Team 3 | | Dong Shengcan (13578241735) | | Zhao Shangneng | | Huang Ping |
| | | | | | |
Team 4 | | Cha Yunsheng (13988233993) | | Ding Yan | | Yang Bingquan |
| | | | | | |
Tel. on duty: 0692-8910462 0692-6201948 Fax: 0692-8910469 |
| | | | | | |
operational personnel of the new power station: | | |
| | | | | | |
Team No. | | Person in Charge on Duty | | Personnel on Duty | | |
| | | | | | |
Team 1 | | Peng Shengpei (13887870416) | | Yin Yishu | | Peng Jiaoling |
| | | | | | |
Team 2 | | Zhang Zairui (13578202616) | | Li Benke | | Jin Mudan |
| | | | | | |
Team 3 | | Pa Anxin (13578255923) | | Li Jinfang | | Yang Rongkan |
| | | | | | |
Team 4 | | Yang Yan (13759241765) | | Dong Baowei | | Jiang Zongshuo |
| | | | | | |
Tel. on duty: 0692-8893924 0692-6201908 Fax: 0692-8910468 | | |
35