11.9 | | The production, operation, construction and business of the Company are fully complied with all the relevant PRC laws and regulations, including but not limited to those laws and regulations in relation to hydropower generation, environmental protection, water and soil preservation, flood prevention plan, design and construction of water resource project, invitation and submission of bids, utilization of woodland, wood cutting, fire-prevention, work safety and relocation. The Transferors warrant that the environmental protection authorities, water resource authorities, power regulatory authorities, construction authorities, forestry authorities, fire-prevention authorities, planning authorities, safe production authorities, development and reform authorities and other governmental authorities will not punish the Company for the problems of environmental protection, water and soil preservation, water fetching, flood prevention planning, design and construction of water resources projects, invitation and submission of bids, power generation, utilization of woodland, wood cutting, fire-prevention, work safety and relocation,etc. which already existed before the Delivery Completion Date. In the event that the Company suffers from any loss or damage due to the punishment by local government, environmental protection authority, water resources authority, electricity regulatory authority, forest authority, construction authority, fire-prevention authority, planning authority, work safety authority, development and reform authorities or other governmental authorities, the Transferors shall fully compensate the Transferee and/or the Company so as to hold the Transferee and/or the Company harmless. |
11.12 | | The Company can legally own the land use right and building ownership for all the land and buildings currently occupied and used by the Company, and could not be involved in any legal action, arbitration, penalty or suffer from any other damage or loss due to the land and/or building issues. In the event that the Transferee and/the Company suffer from any penalty, damage or loss,etc. due to the use of land or building, the Transferors shall assume the joint liability to compensate Transferee and/or the Company in full. |
11.13 | | The procurement of the state-owned land use right (obtained through allocation) for the land currently occupied and used by the Company with the State-owned Land Use Right Certificates (the serial numbers of which are: Jin Guo Yong [2008] No. 166, Jin Guo Yong [2008] No. 167 and Jin Guo Yong [2008] No. 168) has been fully in compliance with the regulations of PRC laws and regulations, and relevant fees and taxes have been fully paid off in accordance with law. The aforesaid State-owned Land Use Right Certificates have covered all the land currently occupied and used by the Company. In the event that the Transferee and/or the Company suffer from any penalty, damage or loss,etc. due to such land, the Transferors shall assume the joint liability to compensate the Transferee and/or the Company in full. |
11.15 | | The mortgage created on the state-owned land use right of the land occupied by the Company, which has been obtained through allocation, has been approved by the competent state-owned land administration authorities, and the Company has completed relevant mortgage registration procedures for such state-owned land use right mortgage and paid off relevant fees. Such state-owned land use right mortgage has been in full compliance with relevant PRC laws and regulations without any violation, and the competent state-owned land administration authorities will not require any other fees for such mortgaged allocated state-owned land from the Transferee and/or the Company, neither will impose any fine or other administrative |